WestCountry
Member
What about using the 378s 387s on the GN fasts not being transferred to Thameslink, where they could make good use of that 110mph capability up the ECML, and moving the 365s south? 
After all, they were built with DC equipment and worked in Kent for some time.
After all, they were built with DC equipment and worked in Kent for some time.
Last edited: