swt_passenger
Veteran Member
- Joined
- 7 Apr 2010
- Messages
- 34,233
Is this likely to change in future do we think? If the technology is capable, it seems a bit of an anachronism, but I don't really know how much of an impact it has on timetabling...
They do the changeover at a place where they would be stopped or going very slowly anyway, because the SN and WCML legs of the route are not ideally synchronised, and they need to waste a bit of time between Shepherds Bush and Wembley anyway.
Unless/until the timetables were completely recast, (which is needed for the 2 tph service eventually), I think the AC/DC changeover has no detrimental effect on the timetabling.