Went to Redhill Today and saw a departing 377 321 had new bogies installed?

When did this happen and why?

Should be a quick thread just wondering why

It looks the same at those used on the 377/6 or 377/7
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

D365

Veteran Member
Joined
29 Jun 2012
Messages
13,182
Hmm. I have a suspicion, but I need to wait for somebody ”in the know” to confirm it…
 

D365

Veteran Member
Joined
29 Jun 2012
Messages
13,182
Overhauled to the standard 377/3 specification, or that of the /5s onwards?
 

Islineclear3_1

Established Member
Joined
24 Apr 2014
Messages
6,592
Location
PTSO or platform depending on the weather
Remember, the 377/3's are nearly 20 years old now. Bogies need to be maintained; properly stripped down etc.

What used to happen was that a unit would come into works, be lifted off its bogies and a ready-overhauled set wheeled in to replace them so that a unit doesn't spend too long out of traffic. It's bogies would then be overhauled and donated to another unit, and so on. Don't know if this happens today or if units just stay in works for the duration of their bogie maintenance
 

Jturner98

Member
Joined
2 Jan 2021
Messages
320
Location
Kent
Changing the subject I’ve seen a few of the /6 and /7 with new bogies now. It must be that time that they are due their first bogie overhaul. I’m assuming it’s their first.
 

GC class B1

Member
Joined
19 Jun 2021
Messages
460
Location
East midlands
Remember, the 377/3's are nearly 20 years old now. Bogies need to be maintained; properly stripped down etc.

What used to happen was that a unit would come into works, be lifted off its bogies and a ready-overhauled set wheeled in to replace them so that a unit doesn't spend too long out of traffic. It's bogies would then be overhauled and donated to another unit, and so on. Don't know if this happens today or if units just stay in works for the duration of their bogie maintenance
Bogie changes are often carried out at the same depot that routine maintenance is carried out. As you state the bogies removed are usually sent to a location where they are overhauled and an overhauled already at the depot set fitted to miniseries down time. From my knowledge of other units, the bogie overhaul interval is around 500,000 miles so I would suggest this mean bogie change ever 4 to 5 years at most. The fleet will already have had several bogie changes.
For information the bogie change was usually referred to a C4 overhaul and for many fleets other equipment such as brake pneumatic equipment and drawgear would be changed for overhauled items at the same time.
 

WizCastro197

Established Member
Joined
12 May 2022
Messages
1,468
Location
Reigate
Changing the subject I’ve seen a few of the /6 and /7 with new bogies now. It must be that time that they are due their first bogie overhaul. I’m assuming it’s their first.
Yes I saw one yesterday with identical bogies to that 377/3. They are relatively new (7,8,9 years) so Yes probably first time or even second.
 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,144
Location
West Wiltshire
There are usually some spare bogies ordered with a fleet (and if any get withdrawn due to accidents, the bogies may be recovered).

If you go back to BR days, when all the Southern EMUs were overhauled every few years at Eastleigh, one of the first jobs was to separate the bodies and put them on transport bogies (lightweight small wheeled versions), the bogies went to different part of the works, where all components needing overall or replacement were removed, there was even a section to rewind the motors if required.

Meanwhile bodies had all the slam doors removed, all seats taken out for reupholstery etc. Everything came back clean or repainted
 
Status