• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Class 376 to London Overground?

Status
Not open for further replies.

A60stock

Member
Joined
26 Aug 2019
Messages
229
Location
London
I've seen on a number of threads speculating regarding the 376s on Southeastern and a good possibility they may be replaced alongside the networkers well before their intended life span.

This got me thinking, why not transfer these to london overground? They are 5 cars already and a very similar train entirely. All that would be needed is the change in seating arrangement and the addition of aircon (and anything else which can be carried out during a refurb). I appreciate they dont have gangways so cannot operate on the East London Line, but can operate on all other non Anglia lines?

I also appreciate they are not walkthrough but I am sure this wouldn't be a massive loss.

Thoughts?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Islineclear3_1

Established Member
Joined
24 Apr 2014
Messages
6,589
Location
PTSO or platform depending on the weather
I had mooted this elsewhere, in previous threads by using the carriages to lengthen to 6 cars; however, I think the core section of the ELL can only take 5 cars

The 376's are becoming a bit of an isolated class now in SE land and I wonder if they will be all eventually ousted by SWR 707s

They do have through inter-unit gangways BTW ;)
 

ComUtoR

Established Member
Joined
13 Dec 2013
Messages
9,562
Location
UK
I had mooted this elsewhere, in previous threads by using the carriages to lengthen to 6 cars; however, I think the core section of the ELL can only take 5 cars

The 376's are becoming a bit of an isolated class now in SE land and I wonder if they will be all eventually ousted by SWR 707s

They do have through inter-unit gangways BTW ;)

Apologies but what does "inter-unit gangways" mean ?

Neither 376s or 707s have a gangway between units
 

TT-ONR-NRN

Veteran Member
Joined
30 Dec 2016
Messages
12,782
Location
Cambridge
Apologies but what does "inter-unit gangways" mean ?

Neither 376s or 707s have a gangway between units
I assume it is some pernickerty comment about how there are gangways between coaches, but it is obvious that the OP is refering to the lack of end gangways.
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,292
This got me thinking, why not transfer these to london overground?
London Overground already has 710274-710279 due to enter service which provide the additional capacity they needed prior to March 2020. They have no need of 376s as well.

Moreover, the only place where DC only units can be used is on the East London Line and, as someone points out above, the 376s don't have end-on emergency egress.

I doubt the intermediate cars could even be put in 378s due to incompatible gangways.
 

D365

Veteran Member
Joined
29 Jun 2012
Messages
13,165
I doubt the intermediate cars could even be put in 378s due to incompatible gangways.
They’re completely different specifications. Gangways are the least of your worries.
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,292
They’re completely different specifications. Gangways are the least of your worries.
To be fair, I wasn't advocating it in any way. We can probably agree that London Overground has absolutely no use for 376s, either directly or "as spare parts" in any sensible scenario.
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,292
Just had a thought could southern use 376s to replace 313s?
That isn't a new thought - not directly is the answer - and it would be off topic for this thread which is rather tightly defined and has no as its answer. There are plenty of threads which envisage 376s going to Southern, either as battery units for the Uckfield line which doesn't appear to be happening or displacing 377s, which also doesn't appear to be happening. To complete the picture, you will recall from other threads that Southern's 455s need to be replaced by 4-car trains because of platform lengths.
 
Last edited:

Kite159

Veteran Member
Joined
27 Jan 2014
Messages
22,747
Location
West of Andover
More chance of them heading to Southern to allow 377s to replace some 455s/313s than heading to London Overground and even that is a very low chance.

They are a small class, 5 coaches with no loos and a 75mph top speed, maybe if they had loos & a higher top speed they could have a new interior (with AC fitted) and used for outer suburban routes (ie Tunbridge Wells)
 

D365

Veteran Member
Joined
29 Jun 2012
Messages
13,165
To be fair, I wasn't advocating it in any way. We can probably agree that London Overground has absolutely no use for 376s, either directly or "as spare parts" in any sensible scenario.
Sorry, I wasn’t aiming at you specifically! Just that there’s absolutely no reason for them to end up at LO.
 
Status
Not open for further replies.

Top