Class 365 and third rail

Status
Not open for further replies.

pethadine82

On Moderation
Joined
16 Jun 2012
Messages
283
Can someone please explain why new trains have been ordered for the TLGN route when 365 are capable of 3rd rail operation, but have had their shoes removed.

Would it not have been cheaper?
FCC are refreshing their class 365s so I guess they plan to use them for a lot longer.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

westcoaster

Established Member
Joined
4 Dec 2006
Messages
4,500
Location
DTOS A or B
Can someone please explain why new trains have been ordered for the TLGN route when 365 are capable of 3rd rail operation, but have had their shoes removed.

Would it not have been cheaper?
FCC are refreshing their class 365s so I guess they plan to use them for a lot longer.

Because they are needed on the GN lines plus there is no physical connection for them to use at the moment, and when it will be ready there is no capacity train wise.
 

ac6000cw

Established Member
Joined
10 May 2014
Messages
3,910
Location
Cambridge, UK
Can someone please explain why new trains have been ordered for the TLGN route when 365 are capable of 3rd rail operation, but have had their shoes removed.

Would it not have been cheaper?
FCC are refreshing their class 365s so I guess they plan to use them for a lot longer.

The 365's have never had 3rd rail capability - a dual-system Networker was a technical possibility i.e. was allowed for in the basic design, but BR never ordered any (as far as I know, and I've been watching/riding on 365's ever since they were introduced).
 

westcoaster

Established Member
Joined
4 Dec 2006
Messages
4,500
Location
DTOS A or B
Last edited:

Peter Mugridge

Veteran Member
Joined
8 Apr 2010
Messages
17,815
Location
Epsom
The 365's have never had 3rd rail capability - a dual-system Networker was a technical possibility i.e. was allowed for in the basic design, but BR never ordered any (as far as I know, and I've been watching/riding on 365's ever since they were introduced).

365 501 to 365 516 inclusive used to run on the 3rd rail between Victoria and Ramsgate / Margate; they were based at Ramsgate depot.
 

OxtedL

Established Member
Associate Staff
Quizmaster
Joined
23 Mar 2011
Messages
2,631
When this last came up it was claimed that 365's do not have the capability to quickly transition from AC to DC and vice versa - the implication being they needed some work done to change mode. If true this would mean they could not be suitable for Thameslink without substantial rewiring.
 

ac6000cw

Established Member
Joined
10 May 2014
Messages
3,910
Location
Cambridge, UK
I stand corrected :oops:, but also note (quote from http://en.wikipedia.org/wiki/British_Rail_Class_365 )

"Although specified as a dual-voltage unit, Class 365s have never operated with this capability since they were built with only one system of traction current pickup. Units 365501 to 365516, which worked briefly for Network SouthEast before the franchise was given to Connex South Eastern, were originally supplied only with DC shoe gear for use on the 750-volt third-rail system"

From what people have said on other threads, the intention is that the new 700's will only operate as far north as Cambridge and Peterborough, so the 365's will continue on the London - Kings Lynn services post-Thameslink extension. (At the rate that passenger numbers have been increasing on the Cambridge line, they'll need most of them just to keep pace with demand....on a Saturday morning, 6 ticket windows + 4 ticket machines + a portable machine in use still results in queues 'out the door' at Cambridge station, and 12-car off-peak trains sometimes)
 
Last edited:

jopsuk

Veteran Member
Joined
13 May 2008
Messages
12,774
Part of the idea is that (once they're all introduced) all trains through then core will class 700, be they 8 or 12 car, simplifying operations. The new trains will be driven by computer through the core to improve headways.

The 365s will be kept busy. Longer off peak Express services would be good. It'll take more units to run the half hourly Kings Lynn service. Non-Thameslink Peterborough services will also be able to be strengthened and the 321 and 317 fleets will be released.
 

MCR247

Established Member
Joined
7 Nov 2008
Messages
10,291
I was told that 365s have never actually been dual voltage: they've been AC and DC before, but they've never been both at the same time as they made so that they could run on both easily, but they weren't made to be able to changeover in service
 

Rich McLean

Established Member
Joined
6 Feb 2012
Messages
1,757
There could be a possibility that a few 365s may be released onto the GWML once electrified
 

ac6000cw

Established Member
Joined
10 May 2014
Messages
3,910
Location
Cambridge, UK
It's possible that if BR had lasted long enough to complete the (then) 'Thameslink 2000' project, some of the 365's might have been modified to have true dual-system capability.

That said, BR never seemed to be that keen on large-scale conversions, so it's more likely they would have been cascaded somewhere else and replaced with the next generation dual-system Networkers.

(As an aside, the 365's were partly 'political' trains - there was a election coming up, the impending closure of York works was a hot issue locally, and the 'west anglian' politicians were keen to get improved Cambridge/Ely/Kings Lynn services, so BR's arm got twisted to order more Networkers....)
 

A-driver

Established Member
Joined
9 May 2011
Messages
4,482
Can someone please explain why new trains have been ordered for the TLGN route when 365 are capable of 3rd rail operation, but have had their shoes removed.



Would it not have been cheaper?

FCC are refreshing their class 365s so I guess they plan to use them for a lot longer.


365s are not cleared for the Sussex lines. They are too wide for the platforms so would only be any use on some southeastern routes.

Plus there is still GN work for them post Thameslink and post new trains.
 

ac6000cw

Established Member
Joined
10 May 2014
Messages
3,910
Location
Cambridge, UK
There could be a possibility that a few 365s may be released onto the GWML once electrified

Maybe, but by the time Thameslink longer-distance 'GN' services start running (in 2018) they'll be nearly 25 years old, have no air conditioning, and will have run a lot of miles (shuttling up and down the GN mainline at 100 mph all day means they must accumulate mileage somewhat faster than their south-of-the-Thames cousins).
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,628
Location
Nottingham
Even if it was able to be fitted with ATO and have dual voltage capability activated, the doors and interior layout of the 365 probably wouldn't allow the very short dwell times that will be needed on the Thameslink core. Keeping them on Kings Cross services provides a reasonable level of comfort on the semi-fasts rather than expecting passengers to Kings Lynn or Peterborough to travel in what is basically a metro environment on a 700.
 
Last edited:

Class 170101

On Moderation
Joined
1 Mar 2014
Messages
8,661
The 321s and 317s will almost certainly leave the TSGN franchise being small sub fleets within said franchise.
 

ac6000cw

Established Member
Joined
10 May 2014
Messages
3,910
Location
Cambridge, UK
The 321s and 317s will almost certainly leave the TSGN franchise being small sub fleets within said franchise.

Yes, once the new 700's come on stream it's going to trigger some major stock movements (and tidying up, like the above oddments). At least FCC tries to use the 317/1's mostly on the stopping trains - they are some of the oldest EMUs around (built for the original 'Bed-Pan' electrification scheme in 1981-82).
 

jopsuk

Veteran Member
Joined
13 May 2008
Messages
12,774
Innadveantly got one of the "extras" laid on fro Cambridge United fans last weekend- stopping at Royston, it was a 12-car 317 formation! Packed in like sardines at the back, in the front carriage there were four of us. Driver even urged people to move through the train after departure.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,712
(As an aside, the 365's were partly 'political' trains - there was a election coming up, the impending closure of York works was a hot issue locally, and the 'west anglian' politicians were keen to get improved Cambridge/Ely/Kings Lynn services, so BR's arm got twisted to order more Networkers....)

They weren't just political. They were the first example of passenger train leasing as Govt had 'allowed' BR to lease trains worth £150m IIRC. Govt did it to get more trains in for busy routes into London as a forerunner to privatisation, but then InterCity West Coast almost scuppered it with a proposal for 10 or so IC225s to run key Manchester an Scotland services. We, sorry ICWC, even did a couple of trial runs. The business case was great. But politics won in the end!
 

Hadders

Veteran Member
Associate Staff
Senior Fares Advisor
Joined
27 Apr 2011
Messages
18,122
As a regular user of the 365's I think they're great trains.

While they're able to operate on AC or DC I don't think they're cleared to run through the Thameslink tunnels as there's no cab front door allowing emergency evacuation. This was (and suspect still is) a requirement for trains running through the Thameslink tunnels.
 

Class 170101

On Moderation
Joined
1 Mar 2014
Messages
8,661
That appears to have fallen as the 700s have no end doors in them. I don't think the 365s can fit through the Thameslink anyway.
 

TEW

Established Member
Joined
16 May 2008
Messages
6,226
End doors were a requirement for the single bore Moorgate tunnels, not the rest of the Thameslink route.
 

ac6000cw

Established Member
Joined
10 May 2014
Messages
3,910
Location
Cambridge, UK
End doors were a requirement for the single bore Moorgate tunnels, not the rest of the Thameslink route.

An important consideration now, but not something that BR and it's predecessors worried too much about when they sent loco-hauled sets of non-corridor suburban stock through the Kings Cross 'Widened Lines' connecting tunnels to Moorgate (pre-GN suburban electrification). The up & down tunnels were on opposite sides of the station, so I assume they would have been single-bore. (Note this is not the current route to Moorgate from Finsbury Park - that was part of LU back then - it's this one - http://en.wikipedia.org/wiki/Widened_Lines).
 
Last edited:

A-driver

Established Member
Joined
9 May 2011
Messages
4,482
An important consideration now, but not something that BR and it's predecessors worried too much about when they sent loco-hauled sets of non-corridor suburban stock through the Kings Cross 'Widened Lines' connecting tunnels to Moorgate (pre-GN suburban electrification). The up & down tunnels were on opposite sides of the station, so I assume they would have been single-bore. (Note this is not the current route to Moorgate from Finsbury Park - that was part of LU back then - it's this one - http://en.wikipedia.org/wiki/Widened_Lines).


Back in those days things were more relaxed and with loco hauled trains front facing doors was impossible. A lot of fire regulations didn't come in until a lot later when risks were considered and addressed.

Back in the old days loco hauled deep level tube trains had no emergency exits but generally the world was a more dangerous place-a fire in a deep level tunnel would be almost certain death then!
 

jopsuk

Veteran Member
Joined
13 May 2008
Messages
12,774
Quite. It was of course British Rail that introduced the end door requirement for trains to Moorgate (it was the tunnels between Farringdon and Moorgate that were considered the "problem"), with the first stock that had them being the 317s introduced when the line was electrified. The 319s (built for BR) have the end door for this specific reason.
 

D7666

Member
Joined
12 Aug 2013
Messages
996
Quite. It was of course British Rail that introduced the end door requirement for trains to Moorgate (it was the tunnels between Farringdon and Moorgate that were considered the "problem"), with the first stock that had them being the 317s introduced when the line was electrified. The 319s (built for BR) have the end door for this specific reason.

All correct, but don't forget those 'tunnels' that caused this problem were actually built AFTER non-gangway DMU and non-gangway LH stock were introduced.

It was the 1960s new building works around Barbican and Moorgate that put these single bore (they are not bores actually but built up) tunnels in place.

So 317s and 319s did not introduce an issue that was not there previously, they fixed something that was not on previous stock.

Yes yes i know it is all H&S nonsense anyway but let's at least try and get the nonsense in the right time sequence.

--
Nick
 

Carlisle

Established Member
Joined
26 Aug 2012
Messages
4,509
Yes, once the new 700's come on stream it's going to trigger some major stock movements (and tidying up, like the above oddments). At least FCC tries to use the 317/1's mostly on the stopping trains - they are some of the oldest EMUs around (built for the original 'Bed-Pan' electrification scheme in 1981-82).

Were the original Bed-Pan 317s not initially equipped for additional 3rd rail operation as the moorgate branch was originally going to be electrified this way due to clearance issues
 
Last edited:

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,628
Location
Nottingham
Were the original Bed-Pan 317s not initially equipped for additional 3rd rail operation as the moorgate branch was originally going to be electrified this way due to clearance issues

I'd be very surprised if this was true. As far as I know the 317s have thyristor phase angle control which is fundamentally incompatible with a DC supply. If they were intended for DC they would have had camshaft control like the 313s, or some kind of chopper like the 319s (though not identical as the GTO thyristor wasn't around at the time).
 

ac6000cw

Established Member
Joined
10 May 2014
Messages
3,910
Location
Cambridge, UK
I'd be very surprised if this was true. As far as I know the 317s have thyristor phase angle control which is fundamentally incompatible with a DC supply. If they were intended for DC they would have had camshaft control like the 313s, or some kind of chopper like the 319s (though not identical as the GTO thyristor wasn't around at the time).

That's my take on the situation too.
 

68000

Member
Joined
27 Jan 2008
Messages
832
The Class 365 is now foul of the gauge for the Thameslink core with the changes to Snow Hill tunnel reduced height OHL and the addition of a GSM-R antenna on the 365 roof
 