• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

class 345 on Southend line

Status
Not open for further replies.

JBuchananGB

Established Member
Joined
30 Jan 2017
Messages
1,400
Location
Southport
Hello

I have head a rumour that the new class 345 Crossrail trains will be doing some "mileage accumulation" trips along the line to Southend Victoria.

Does anyone know anything about this?

If so when might this happen, and would they be operating in service or just as empty stock?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Bringback309s

Member
Joined
22 Aug 2013
Messages
379
I've seen commented on some flickr photos that they don't fit in platforms 14 - 18 at LST as they're too wide! Will they have gauging issues getting to Southend?
 

JBuchananGB

Established Member
Joined
30 Jan 2017
Messages
1,400
Location
Southport
Certainly a very curious looking Freight Class 321 path departing Ilford EMU depot at 0839 arrive SOV 0941 and apparently leaving there at 0957 with destination Wickford arriving 10.15. Then leaving Wickford at 1024 back to Southend.

And a few more similar movements between Southend and Shenfield during the rest of the day culminating a a turn to Ilford, dep SOV 2137.
 

hwl

Established Member
Joined
5 Feb 2012
Messages
8,248
Actually "don't fit", or "assume they don't fit until someone measures/tests them"?

Considering the highest numbered 4 platforms will get rebuilt any way on lengthening in the next 18 months not the biggest worry, as long as some 345s can run from this May.
 

Wivenswold

Established Member
Joined
24 Jul 2012
Messages
1,570
Location
Essex
I saw a flickr photo caption that said they would only fit in platforms 7-10 "according to a member of staff" but was quickly followed by a photo of one in Platform 11.

Hopefully someone in the actually know will be able to clarify.
 

samuelmorris

Established Member
Joined
18 Jul 2013
Messages
5,121
Location
Brentwood, Essex
The early units are 7-car length specifically so they'll fit in 16-18 at Liverpool Street as I understand it. They'll only become 9-car once the tunnels open. I assume the units that run Gidea Park peak services will use platforms somewhere else in the station.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,252
The early units are 7-car length specifically so they'll fit in 16-18 at Liverpool Street as I understand it. They'll only become 9-car once the tunnels open. I assume the units that run Gidea Park peak services will use platforms somewhere else in the station.

The existing Shenfield line platforms are to be lengthened once most of the service goes through the Crossrail tunnels, and one of them (18 perhaps?) is being removed to allow the throat S&C to be rearranged. Once that's complete the initial tranche of 345s will be lengthened and the peak service will operate into the usual platforms although reduced in number.
 
Last edited:

Wivenswold

Established Member
Joined
24 Jul 2012
Messages
1,570
Location
Essex
Be careful of staff quotes. As I've found out recently, they don't know everything.
 

306024

Established Member
Joined
23 Jan 2013
Messages
3,974
Location
East Anglia
Be careful of staff quotes. As I've found out recently, they don't know everything.

Indeed. Clearly "Kitmasterbloke" is the guy to follow for all the latest alternative facts.

Meanwhile there is no "Big oops", rest assured the professionals are all going about guage and route clearance as they should.
 

AM9

Veteran Member
Joined
13 May 2014
Messages
16,025
Location
St Albans
Indeed. Clearly "Kitmasterbloke" is the guy to follow for all the latest alternative facts.

Meanwhile there is no "Big oops", rest assured the professionals are all going about guage and route clearance as they should.

Surely the stock is not too wide but being 23m long, it has a problem with curved platforms and crossovers within the platform length. All the existing EMU stock there is 20m long.
 

CyrusWuff

Established Member
Joined
20 May 2013
Messages
5,434
Location
London
Surely the stock is not too wide but being 23m long, it has a problem with curved platforms and crossovers within the platform length. All the existing EMU stock there is 20m long.

Whilst the EMUs are 20m vehicles, the 170s and Mk3s are 23m vehicles...
 

AC47461

Member
Joined
13 Feb 2017
Messages
260
Location
RAYLEIGH, ESSEX
Indeed. Clearly "Kitmasterbloke" is the guy to follow for all the latest alternative facts.

Meanwhile there is no "Big oops", rest assured the professionals are all going about guage and route clearance as they should.

Indeed, his text states they are the platforms used by Norwich sets, but they also use 9, 10, 11 and 12 (probably far more than the ones he quotes)...
 

Wivenswold

Established Member
Joined
24 Jul 2012
Messages
1,570
Location
Essex
I can't see GA completely changing their working timetable for May just to allow TfL trains to use the central platforms. It would also mean cutting some GA train lengths as they'd have to use the shorter Platform 18 vacated by TfL. Platform 18 is needed until the tunnel opens.

None of that will happen.
 
Status
Not open for further replies.

Top