Class 333 Leeds to Doncaster

Status
Not open for further replies.

Harvey B

Established Member
Joined
11 Mar 2019
Messages
1,241
A while back on this Forum that the 333s would eventually be a regular sight on the doncaster line.

Is this plan still going to be a thing or has it been shelved?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Harvey B

Established Member
Joined
11 Mar 2019
Messages
1,241
I won't lie but I actually think it is upsetting that they won't
 

Adam0984

Established Member
Joined
18 Feb 2014
Messages
1,213
Never say never though plans change and it may end up that when the 4 car 331s are swapped with the 3 cars the 333s might become the train of the Donny line
 

43096

On Moderation
Joined
23 Nov 2015
Messages
18,808
Never say never though plans change and it may end up that when the 4 car 331s are swapped with the 3 cars the 333s might become the train of the Donny line
That was what drove the 333s to Doncaster plan: that line needs 4-car trains, so the plan to run pairs of 3-car 331s to replace the Dusty Bins meant 333s had to do the Doncaster run.
 

4REP

Member
Joined
16 Oct 2019
Messages
272
Location
Bingley
One plan possible could be to run through services from the Airdale line to Doncaster as 6 cars which has been mentioned.
 

Spartacus

Established Member
Joined
25 Aug 2009
Messages
3,827
One plan possible could be to run through services from the Airdale line to Doncaster as 6 cars which has been mentioned.

I can’t see that being a good idea at all, all it’ll do is spread delays from one area onto the other, while adding further risk at Leeds west end. Perhaps even dafter an idea than the long distance TPE locals.
 

Tracked

Established Member
Joined
30 May 2011
Messages
1,338
Location
53.5440°N 1.1510°W
I can’t see that being a good idea at all, all it’ll do is spread delays from one area onto the other, while adding further risk at Leeds west end. Perhaps even dafter an idea than the long distance TPE locals.
Doncaster Platform 6, where they'd usually go from, would be too short. I don't think 7 is much longer, and using 4/8 wouldn't be practical.
 