• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Class 319 LNR withdrawal date

Status
Not open for further replies.
Joined
16 Oct 2021
Messages
136
Location
Uk
Hello everyone. I've heard conflicting reports on when the LNWR 319's will be withdrawn and sent to the cutters torch, some say that they will be withdrawn as the leases expire on June the 30th however i've heard from guards and drivers that they will carry on till september. If anyone could give me insight on what LNWR plan on doing with the 319's that would be greatly appreciated.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

AJDesiro

Member
Joined
10 May 2019
Messages
929
Location
Rugby
I've heard this rumour, but LNR seem to be giving a variety of dates. It's been said in the 730 thread that they're meant to be entering service soon (within 2-3 weeks was stated a few days ago). I don't exactly know how LNR would cope without 319s, considering there always seem to be plenty of 350s at Kings Heath when I pass through, but it's probably best to keep them on until the 730s can replace them.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,091
Location
"Marston Vale mafia"
Yes, I doubt it. 730s will come in (apparently!) in 2-3 weeks so the 319s won’t go until then.

I wouldn't even bet on it then. If as I suspect is the case the intention is to run 6-car 730 sets in place of an 8-car 319, there's going to be a serious overcrowding issue and so they'll end up having to wait until they have enough to run 9s. Sure they're 24m instead of 20 but those 8 car 319 formations get seriously cosy. WMT do seem to learn those lessons but it always seems to take trying first to get them to learn them.
 

AJDesiro

Member
Joined
10 May 2019
Messages
929
Location
Rugby
I do wonder if the unreliable date may have some sense behind it, it wouldn’t surprise me if porterbrook wanted the 319s for another project - they don’t seem to want to admit that the 769 was a failure.
 

TT-ONR-NRN

Veteran Member
Joined
30 Dec 2016
Messages
12,775
Location
Cambridge
I wouldn't even bet on it then. If as I suspect is the case the intention is to run 6-car 730 sets in place of an 8-car 319, there's going to be a serious overcrowding issue and so they'll end up having to wait until they have enough to run 9s. Sure they're 24m instead of 20 but those 8 car 319 formations get seriously cosy. WMT do seem to learn those lessons but it always seems to take trying first to get them to learn them.
I had thought the plan was to replace off peak 4/8 carriage 350s with them which would then replace the 319s.
 

AJDesiro

Member
Joined
10 May 2019
Messages
929
Location
Rugby
They have been sending surplus 319s for scrap fairly recently.
In that case the LNR ones may see some use after the 30th June.

== Doublepost prevention - post automatically merged: ==

I had thought the plan was to replace off peak 4/8 carriage 350s with them which would then replace the 319s.
Surely it’d make more sense to directly replace the 319s due to the slower paths, I would’ve thought a 730/0 would stand a better chance in one of those paths than a 110mph 350 path.
 

warwickshire

On Moderation
Joined
6 Feb 2020
Messages
2,303
Location
leamingtonspa
I same have heard Second week September via various guards and drivers, ie get 730 reliability in place, however 12 car 350s up the Trent Valley is top priority first, then followed by the 319s in September.
 

TT-ONR-NRN

Veteran Member
Joined
30 Dec 2016
Messages
12,775
Location
Cambridge
In that case the LNR ones may see some use after the 30th June.

== Doublepost prevention - post automatically merged: ==


Surely it’d make more sense to directly replace the 319s due to the slower paths, I would’ve thought a 730/0 would stand a better chance in one of those paths than a 110mph 350 path.
I’m not sure how often a 350 on stopping Tring/Milton Keynes services actually reaches 110mph.
 

87015

Established Member
Joined
3 Mar 2006
Messages
5,078
Location
GEML/WCML/SR
Lease extended until end of September. They’ll be 6 vice 8 - certain trains have been leaving people behind since last December and they haven’t made any changes to cater, still loads of empty space on the wrong trains and units already stabled up when you can’t get on at Euston.
 

warwickshire

On Moderation
Joined
6 Feb 2020
Messages
2,303
Location
leamingtonspa
Lease extended until end of September. They’ll be 6 vice 8 - certain trains have been leaving people behind since last December and they haven’t made any changes to cater, still loads of empty space on the wrong trains and units already stabled up when you can’t get on at Euston.
Heard much the same, from various LNWR sources, staff ie will disappear around then, from middle September, ie diagramed to around middle September, no need to panic just yet. 730 reliability and once again especially for the busy August summer holidays alone and the rest 12 350s on the Trent valley is priority. So September is the final month for them.
 

Class15

Established Member
Joined
30 Dec 2021
Messages
4,107
Location
North London or Mildmay line
Yet you kick up a fuss about 745s on London to Norwich!

Let's be honest, the 319s are dross and need to go.
Totally different things. No bias towards older trains whatsoever!

I ask you the same question, would you rather knackered 319s or even more crowded 350s for a few months until the 730s come in? I’m very happy with the 319s if the other option is packed trains.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,091
Location
"Marston Vale mafia"
Totally different things. No bias towards older trains whatsoever!

I ask you the same question, would you rather knackered 319s or even more crowded 350s for a few months until the 730s come in? I’m very happy with the 319s if the other option is packed trains.

Yep, this. The 319s are dross and do need to go, but not until enough 730s to replace them are in service. At least that means we don't have another heatingless winter.
 

HamworthyGoods

Established Member
Joined
15 Jan 2019
Messages
4,476
Speak for yourself, I think many would rather have the new modern train than the knackered old 319s :lol:

However than plan was until the lease was extended is you would only get half a modern train to replace your old 319. The plan being to reduce a number of peak workings from 8 cars to 4 cars to facilitate this.

Trains such as the 07.50 Tring to Euston and the 18.06 to Bletchley were due to reduce from 8 cars to 4 cars to free up the stock to replace the 319s.

I think there will be a sigh of relief from regular peak users the 319s are staying a bit longer!
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,091
Location
"Marston Vale mafia"
However than plan was until the lease was extended is you would only get half a modern train to replace your old 319. The plan being to reduce a number of peak workings from 8 cars to 4 cars to facilitate this.

Trains such as the 07.50 Tring to Euston and the 18.06 to Bletchley were due to reduce from 8 cars to 4 cars to free up the stock to replace the 319s.

I think there will be a sigh of relief from regular peak users the 319s are staying a bit longer!

That I believe has nothing to do with 319s and is to do with work at Bletchley depot for EWR and will still happen.
 
Joined
16 Oct 2021
Messages
136
Location
Uk
I'm starting to highly doubt the September withdrawal date, 012 and 429 were quietly withdrawn and sent for scrapping on monday and tuesday. This leaves 7 units in traffic with LNWR. Highly suspicious considering that one of the suspected withdrawal dates is the 30th of june.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,091
Location
"Marston Vale mafia"
I'm starting to highly doubt the September withdrawal date, 012 and 429 were quietly withdrawn and sent for scrapping on monday and tuesday. This leaves 7 units in traffic with LNWR. Highly suspicious considering that one of the suspected withdrawal dates is the 30th of june.

How many diagrams are there? 2x8 and 4 for Snorbens? If that's the case then 7 are enough, they used to be 12 car sets.

The short formings advertised by LNR appear to be 350 operated services if I recall.
 
Status
Not open for further replies.

Top