D365
Veteran Member
- Joined
- 29 Jun 2012
- Messages
- 13,174
Indeed soon there will be plenty of scrap for the scrapman![]()
More sightseeing to do outside Rotherham!
Indeed soon there will be plenty of scrap for the scrapman![]()
Wouldn't be surprised to see a couple kept on for the Upminster for as long as the GA ones remain at Ilford.Only until the Aventras are in service.
I hear they're bound for AGA. All they need changing externally is a repaint on the doors and a change of the logo transfers.
Wouldn't be surprised to see a couple kept on for the Upminster for as long as the GA ones remain at Ilford.
Indeed soon there will be plenty of scrap for the scrapman![]()
I wish they wouldn't scrap the 317's if it wasn't for the new rolling stock and lack of electrification they could have a life extension
Wouldn't be surprised to see a couple kept on for the Upminster for as long as the GA ones remain at Ilford.
I wish they wouldn't scrap the 317's if it wasn't for the new rolling stock and lack of electrification they could have a life extension
Unfortunately, I bet in a few years we find Anglia is short of stock again (or a few 321s get retained as a rump fleet, like happened with London Midland).
The units refurbished by WAGN have a particularly nice interior, so hopefully these - if not the earlier series - may find some further use. Goodness knows where though, we could do with a few new small low-cost electrification schemes!
Perfectly serviceable trains for a few more years yet.
Which won't be very long, London Overground have an option for additional Class 710s anyway.
And there is a "drop dead" date of 31/12/19 anyway as I don't believe they are PRM-TSI compliant.
Oh believe me, we're very aware of that here.
Dispensations, dispensations, dispensations.
The /6s might be well fitted out, but I bet you they're pretty knackered mechanically, especially the remaining the units from the original batch.
Yes, quite possibly but I am sure you could sacrifice a few units to fix the others and build a pretty reliable fleet. They won't be around forever, but I don't think they're dead yet.
If the body shells are still okay, you can probably do a radical overhaul if necessary. If the cost of building new trains rockets due to our weakening pound, refurbishing old stock may become more popular again - after a massive splurge on new stock of late.
Oh believe me, we're very aware of that here.
Dispensations, dispensations, dispensations.
Yes, quite possibly but I am sure you could sacrifice a few units to fix the others and build a pretty reliable fleet. They won't be around forever, but I don't think they're dead yet.
If the body shells are still okay, you can probably do a radical overhaul if necessary. If the cost of building new trains rockets due to our weakening pound, refurbishing old stock may become more popular again - after a massive splurge on new stock of late.
And there is a "drop dead" date of 31/12/19 anyway as I don't believe they are PRM-TSI compliant.
They could have ordered ten new units to replace every existing one, and you would still find something to criticise :roll:
The /6s might be well fitted out, but I bet you they're pretty knackered mechanically, especially the remaining the units from the original batch.
Well, that changes things if that's the case. Chances are it won't be economically viable to make them compliant, so goodbye.
You've had quite the change in heart![]()
Of course, if they were made compliant then I'd revert to my original thinking.
Unlikely to happen when they're in need of a significant overhaul under the solebar, and a glutton of younger 321s going spare. Like I said earlier, there's not been much progress with regards to 317722.
Funnily enough, I just stepped off a 317. Solid but not spectacular is my consensus; I won't miss them as much as I will the 365s.
Well you know about all the trouble 317 722 has been suffering with it's new traction equipment don't you.
Angel Trains are not going to put any more money into it unless they somehow manage to secure a new lease on the 317s.
Getting the access rights to allow a fleet of units to get the extra 10mph is a pain in the botty.
you have to prove the safety case now, that extra 10mph will mean higher impact speeds etc, regearing of the motors - in the case of 317,319 the g315bz traction motor, do they need extra cooling etc, how much power will be dragged out the overheads to get them to this speed how long will they be able to stay at 110 etc
the 110mph that the LM 350's have allows them to slot in between the pendos on the old lines when on crewe jobs..it took alot of time, research by LM, Hitatchi and the LM front seaters ,it has paid off.
for the extra 10mph 317 - 321 u need to be able to prove crashworthiness for all in the unit, motors can handle the extra power etc, braking, vehicle ride. etc etc
all of the old BR traincrews know that the original 317/1 fleet were more than capable of tonning up, im unsure of the class 317/1, the 319 & 321 speed records im sure some of the old school front seaters will know the records and will i suspect tell you what they could get out of some of units..
Even 310s could be taken off the clock, they had a design speed of 75mph, easily could do 90's and lets face it all of us who remember them especially on LMR, some of the old girls could do it..others could only handle 75..
same with dmmus, ive been at least 100 in some flying meccano,
in the same way HSTS could easily outrun 125 and are governed, all fleets can exceed their built and current design speeds, it is not done now...as if anything happens, then speeding will always become a factor in any incident.
but in todays culture you dont go over the exact speed of the unit..
its not just about regearing and lobbing bigger pads on the brakes.
GA have said they will have 27 units (which is the current GA 317/5 plus the GN 317/1 fleet added together if you're fond of maths, three units more than the 317/6 fleet) modified to be 2020 compliant. I'd guess it will be absolute bare minimum, so toilet, door controls and PIS.