Hertford North for example can take 7 cars on both Up Hertford/Down Hertford but only 6 cars in Down Bay - Hertford could be extended but at the moment only Platform 1 looks feasible and that's only because it can be extended southwards by a few meters if that to take a 8 car.
Going north with Platform 2/3 will require a lot of work due to the bridge north of the station but bridges can always be replaced.
The bay is the same length as the other platforms at Hertford-they could just about squeeze in a 7th.
We stop 6 car trains about a coach length from the buffers there and there is still plenty of room London end. Same in all platforms.