northwichcat
Veteran Member
I'd have thought additionally that one will serve Mirfield (probably the Hull) with the Leeds terminator calling at Deighton and Ravensthorpe. Stops between Mirfield and Leeds will depend on the stopping pattern of the Northern 170 service between Leeds and Southport via Dewsbury and Brighouse though.
How many calls at stations TPE and Northern will do can be found here:
https://www.gov.uk/government/publications/northern-rail-2016-rail-franchise-agreement
https://www.gov.uk/government/publications/transpennine-express-2016-rail-franchise-agreement
Network Rail did consultation on the stopping patterns between Manchester and Huddersfield and the conclusion was Greenfield and Marsden for one service and Mossley and Slaithwaite for the other was the best option. For people in Marsden and Slaithwaite the idea of a direct service to Leeds was apparently a lot more attractive than a direct service to the next village when there's a much more frequent bus service.
I do recall a mention of one station getting served by TPE in one direction and by the Northern Southport service in the other direction.
--- old post above --- --- new post below ---
I believe a mod has been carried out to the 185s to allow the doors on the front 4 coaches to be released, rather than unit deselct as previous. Would the platforms at the intermediate shacks be long enough for 4 coaches? Of course, I suppose it is possible that there will be lengthening.
Not 4 x 185 carriages without lengthening. With formations longer than the platforms the position of the signals is also a consideration.