The rear unit doors are not locked they just don't electrically release, the green egress handle will still mechanically release the door for manual opening in an emergency. The emergency handles allow communication with the driver at all times assuming the units remain coupled.
I did mention in my reply that passengers could still egress, that was never denied.

But the point has been fully backed up here. There is an isolation stopping an electrical communication going between the units, yes this is only stopping door release communication but its still an isolation. As you say everything else works. This in essence locks the rear set up with passengers unable to board or alight from that set whilst the TUDI switch is in use. That is a fact.

I dont think there is any other way but to describe it as the rear set being locked when using the TUDI switch - factually it is locked as the doors wont open when door release is commanded from the other unit.

If you were on a 10 car IET stopping at a short platform (like Ivybridge), the rear 5 coaches will remain locked with passengers in essence trapped in there unable to alight. This is the same concept as the TUDI switch as the doors have been electrically isolated by the TMS so that when a door release is commanded, the doors will not open. Again, the doors are not physically bolted shut but you cannot open them to alight as there will be no door release in that set.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

RPI

Established Member
Joined
6 Dec 2010
Messages
3,355
I did read somewhere internally today that 175003 has actually achieved over 10,000 miles between major faults and that they hope to achieve this with the whole fleet.
 

fgwrich

Established Member
Joined
15 Apr 2009
Messages
10,640
Location
Hampshire
I did read somewhere internally today that 175003 has actually achieved over 10,000 miles between major faults and that they hope to achieve this with the whole fleet.
Brilliant, they’re slowly getting there at last. They’ll be excellent units when the fleet is finally rolled out with achievable reliability.
 

BillStampy

Established Member
Joined
6 Jan 2024
Messages
1,602
Location
Llanharan
I did read somewhere internally today that 175003 has actually achieved over 10,000 miles between major faults and that they hope to achieve this with the whole fleet.
Brilliant. Now hopefully it can be replicated to every unit.

It may take time, but it will pay off if it works!
 

XFeed

Member
Joined
25 Nov 2025
Messages
311
Location
Chester
The rear unit doors are not locked they just don't electrically release, the green egress handle will still mechanically release the door for manual opening in an emergency. The emergency handles allow communication with the driver at all times assuming the units remain coupled.

Correct the Red Pass Comms handles in each vestibule and each toilet will allow communication to the driver at all times, when a red handle is pulled in a vestibule it will initiate an emergency brake application but the driver can override this brake application by pressing the Pass Comms Override button in cab and this will then release the brakes for a maximum of 5 mins. If a Red Pass Comms handle is pulled in a toilet no emergency brake application is made.
 

REVUpminster

Established Member
Joined
3 Jan 2021
Messages
1,287
Location
Paignton
Correct the Red Pass Comms handles in each vestibule and each toilet will allow communication to the driver at all times, when a red handle is pulled in a vestibule it will initiate an emergency brake application but the driver can override this brake application by pressing the Pass Comms Override button in cab and this will then release the brakes for a maximum of 5 mins. If a Red Pass Comms handle is pulled in a toilet no emergency brake application is made.
It would be difficult for a passenger sitting in the toilet to make a brake application while in motion.:'(

== Doublepost prevention - post automatically merged: ==

Cannot find 003 today. 112 is passenger and 114 mileage which must be close to a 1000miles
 
Last edited:

BillStampy

Established Member
Joined
6 Jan 2024
Messages
1,602
Location
Llanharan
175003 working 5Z14/15
175007 and 175101 5Z77 XLZ - XLZ via NTA
175112 on 2P16 currently
175114 on the Plymouth to Exeter runs today.

5 units!
 

REVUpminster

Established Member
Joined
3 Jan 2021
Messages
1,287
Location
Paignton
175003 working 5Z14/15
175007 and 175101 5Z77 XLZ - XLZ via NTA
175112 on 2P16 currently
175114 on the Plymouth to Exeter runs today.

5 units!
007 and 101 have been out before on passenger trips Newquay and the mainline. This seemed an odd test. Did they breakdown before?
 

BillStampy

Established Member
Joined
6 Jan 2024
Messages
1,602
Location
Llanharan
007 and 101 have been out before on passenger trips Newquay and the mainline. This seemed an odd test. Did they breakdown before?
Likely a post-heavy maintenance shakedown run prior to starting their 1000 miles milage accumulation tests before returning to passenger service; that's my guess anyway.

Can anyone who has a bit more insider knowledge of the current plan answer this for me:
As more units become available as they pass their fault-free milage runs, will they fill in the other diagrams such as 2C05's (currently a 150) or 2E04's (currently an IET)?
Curious as to whether GWR will phase the units back in as they go or not.
 

Apedlar12

Member
Joined
13 Apr 2017
Messages
837
Nothing showing at the moment for a movement tomorrow from Wolverton, which I believe was previously mentioned to be happening. Hopefully there will be one soon though.
 

Jrocks

Member
Joined
27 Apr 2021
Messages
174
Location
Torbay
Can anyone who has a bit more insider knowledge of the current plan answer this for me:
As more units become available as they pass their fault-free milage runs, will they fill in the other diagrams such as 2C05's (currently a 150) or 2E04's (currently an IET)?
Curious as to whether GWR will phase the units back in as they go or not.
The public information is quite clear that there will be a reduced number of services in Cornwall (and Devon) until 12th December as a result of 175 reliability (link at the bottom of message if it works)

Obviously it would be good to get the 150 back to local work and the IET back working other services, however i believe it is sensible to take things as it comes and not rush what the teams in Laira are trying to do to the units! Sorry one has to be so vague..........

Service changes between Penzance, Plymouth and Exeter St Davids | Great Western Railway https://share.google/TbBDzK0eV7BnoeIrn
 