stevieinselby
Established Member
The obvious deployment for them in GWR territory would be on the mainline, where they have been using the Castle sets, and where the extra power will give some benefits – there aren't any restrictions that would limit the 185 to a lower speed than the Castles, which are considerably heavier (per vehicle). It would be mad to use them on the branch lines.185's wouldn't be much good for the West, they're much heavier than anything we currently have and they guzzle fuel.
A more relevant comparison would be the GWR 230 with a TfW 230 – battery and diesel alternatives of the same platform.I wonder what the weight of a GWR battery 230 is compared to a 150 and a 150 becomes lighter as it uses fuel.
While a diesel train will burn fuel over the course of the day, a diesel engine itself is a big heavy lump of metal and weighs considerably more than the equivalent electric motor.
According to a recent interview featured on Green Signals, a BEMU will weigh about the same as a comparable DMU, although they don't specify whether that is full of fuel or not!
No reason why using cascaded units can't be a long-term strategy, if there's going to be a steady supply of them as mid-life trains are replaced in other areas.Yes the South West seems to be getting lots of stop gaps
165s displaced from London Suburban by 345s
166s displaced from Thames Valley by 387s
175s displaced from Wales by 197s
Potentially 185s from Transpennine
Not really a long term strategy
Where you have a part of the network that has quieter branch lines, it may be perfectly sensible to channel the investment in new trains into other areas where there is more potential to attract passengers and you will get more bang for your buck. You also want to put that investment into routes where the trains can live up to their potential, and low speed branch lines where passengers are making short journeys are a more appropriate deployment for older trains that are getting a bit tired than for brand new state-of-the-art trains.