zwk500
Veteran Member
In the same way Dover isn't that far from France.EMR serve Cleethorpes which isn't that far from Hull.
In the same way Dover isn't that far from France.EMR serve Cleethorpes which isn't that far from Hull.
Are you proposing using 11 2 cars and 16 3 cars to replace 7 155s and 66 156s?Northern have lots of old diesel stock which needs replacing. There may well be a plan to replace them with new units for the long term, but this won't be for a good few years so there's a case for more modern and less polluting 175s replacing the 155s and 156s until the new stock arrives.
The DfT aim to run train services as well as possible within the budget set by the treasury, not to keep the 175s in work.
Northern have plans for new rolling stock to replace sprinters, why would the DfT spend cash on training staff, sorting maintanence and leasing the 175s just for them to be replaced a few years later?
Actually starting to feel like an obsession to be shoe-horned into any vaguely relevant thread.
Actually starting to feel like an obsession to be shoe-horned into any vaguely relevant thread.
There's debate and reasonable speculation. Then there's fantasy. A lot of your ideas are the latter. You don't help yourself by making yourself look silly with comments such as "it's not far from Cleethorpes to Hull".I've seen what this poster has said numerous times, but as it stands the future of these units is still up in the air to us and until there is public official confirmation, still open to debate and speculation.
Longsight?So where would the 175s be based? As Botanic Gardens and Neville Hill will be full...
Exactly this!An aternative which I've mentioned before, to avoid splitting the fleet, would be to send all 175s to Northern and for Northern's 170s to go to Chiltern for conversion to 168s and LHCS replacement. Perhaps the 170 depot at Hull could still be used to maintain some of EMR's 170s?
Shame, the knowledge of what Northern were actually doing was useful. Out of interest (if you're still watching the thread after all this) what are the rough timescales to expect a tender?Put it this way, I shall never stick my neck out ever again on here regards information on Northern’s new fleet proposals. Everyone can now wait for the press releases like everyone else.
No I’m sorry but claiming that Cleethorpes is close to Hull ignoring the lack of rail connection and the huge expanse of water called the Humber that are in the way prove to me that this is a thread that is simply not worth bothering with.
I’ve said what I have on the subject and given all the relevant information that I am able to and I’ve basically been told I don’t know my job and that this posters ideas are actually nearer the mark of what should/will happen than what is actually happening (tell me again what your job is in Northern planning please Philip, you can pop across and shadow me for the day if you wish, then you’ll never bring the subject of 175’s at Northern up ever again, I guarantee it).
I’m just sick of the headaches from banging my head against the wall.
Put it this way, I shall never stick my neck out ever again on here regards information on Northern’s new fleet proposals. Everyone can now wait for the press releases like everyone else.
Because Neptune obviously has inside knowledge and can share what Northern's plans are.Northern's plans are not in the public domain though, so why say anything in the first place?
They could, but they won't.The DfT/Angel Trains could decide tomorrow that they'll send the 175s to Northern and Northern would have to accept the units and begin making plans to accomodate them, even if they're currently not planning to take them on.
I don't blame you - and thank you for all the actual information you have given us!No I’m sorry but claiming that Cleethorpes is close to Hull ignoring the lack of rail connection and the huge expanse of water called the Humber that are in the way prove to me that this is a thread that is simply not worth bothering with.
I’ve said what I have on the subject and given all the relevant information that I am able to and I’ve basically been told I don’t know my job and that this posters ideas are actually nearer the mark of what should/will happen than what is actually happening (tell me again what your job is in Northern planning please Philip, you can pop across and shadow me for the day if you wish, then you’ll never bring the subject of 175’s at Northern up ever again, I guarantee it).
I’m just sick of the headaches from banging my head against the wall.
Put it this way, I shall never stick my neck out ever again on here regards information on Northern’s new fleet proposals. Everyone can now wait for the press releases like everyone else.
Given their history of 'thermal incidents', I'm not sure I'd particularly welcome travelling on them through the Severn Tunnel! Could Network Rail refuse to allow them through?Well I never said they would necessarily maintane them brilliantly, my point was that if taken care of there's nothing inherently wrong with them.
As others have said, many Sprinters are expected to last at least 40 years in service, as IC125s (albeit with replacement MTU/VP185 engines). While perhaps the internal combustion engine itself doesn't last for the whole life of the train the bodyshell presumably is where most of the energy used to build the train (producing steel/aluminium) is required. It is also the bodyshell which I consider to have a 35-40 year life, at least. I do have a couple of 'citations' to back me up on this:What’s your citation for the planned/expected lifespans? Diesel multiple units, traditionally, are designed for a 30 year lifespan.
I mean that's if correctly maintained they are fairly good. They even seemed to have really settled down until caf subcontracted it out further.Given their history of 'thermal incidents', I'm not sure I'd particularly welcome travelling on them through the Severn Tunnel! Could Network Rail refuse to allow them through?
Re your last para l wonder if that was an attempt to avoid the spares issues which have bedevilled the Networker DMUs of late?As others have said, many Sprinters are expected to last at least 40 years in service, as IC125s (albeit with replacement MTU/VP185 engines). While perhaps the internal combustion engine itself doesn't last for the whole life of the train the bodyshell presumably is where most of the energy used to build the train (producing steel/aluminium) is required. It is also the bodyshell which I consider to have a 35-40 year life, at least. I do have a couple of 'citations' to back me up on this:
Additionally, I seem to recall an EMU order sometime in the last 10-15 years (I have a feeling it was either the 707s or 777s, but I can't find the quote) which came with a 40 year maintenance contract.
- Porterbrook (paragraphs 7.1 and 7.2 refer to an asset life of circa 35 years) https://committees.parliament.uk/writtenevidence/13912/html/
- British Railways Board (table 35, https://www.railwaysarchive.co.uk/documents/DoTBRB_Electrification1981.pdf lists various types of stock with projected lives of 25-40 years)
Methinks that you have a superfluous "in" which very definitely changes the meaning lol....I mean that's if incorrectly maintained they are fairly good. They even seemed to have really settled down until caf subcontracted it out further.
Indeed I did teaches me not to type on My phone while discussing a movie. Now editedRe your last para l wonder if that was an attempt to avoid the spares issues which have bedevilled the Networker DMUs of late?
== Doublepost prevention - post automatically merged: ==
Methinks that you have a superfluous "in" which very definitely changes the meaning lol....
This one made me laughIn the same way Dover isn't that far from France.
Don’t encourage him!!Exactly this!
They’re going somewhere. Where exactly though, is yet to be confirmed.Is it a possibility all 2 car 175s heading to Chiltern end of this summer.
11 2-car 175s wouldn't provide a lot of capacity if the desire was to bin off the locomotive hauled sets. I guess that forming them in three triplets could just about do it.All I can say is, if it is Chiltern they’ll need to pair them up.
In contrast, 48 carriages to GWR seems like overkill, given there was already a credible plan to eliminate the HSTs using the existing fleet, and the pressure at GWR seems to have been to avoid the need for the huge training effort a new fleet would represent.3 cars to Great Western by the end of the year
Hoping very much for an update soon.
GWR shortforming many services each day despite remaining Castle diagrams. Does not mean 175 transfer will happen though.48 carriages to GWR seems like overkill
A driver told me yesterday he’d heard 2 cars to Chiltern end of August and 3 cars to Great Western by the end of the year, but that could be all sorts of depot wibble. All I can say is, if it is Chiltern they’ll need to pair them up.
Previous changes have indicated that GWR have wanted Fratton traincrew not to lose knowledge of 158s and 166s so a total takeover by 175s wouldn't be easy. I don't think they are able to run 6-car on the route. It doesn't appear at first sight to ring true with previous discussions.If they went to GWR which route would they use them on? If it was the Portsmouth to Cardiff's would 3 carriages not be a step backwards as most are 4 or 5 carriages now?
A 3-car 175 might provide more comfort to people who get a seat than a 3-car 166, but fewer people are able to sit down.They are suitable for the route however, much better than the 165's that are used on most of them now.
If you can couple 16x, why can’t you couple 175s?If they went to GWR which route would they use them on? If it was the Portsmouth to Cardiff's would 3 carriages not be a step backwards as most are 4 or 5 carriages now? They are suitable for the route however, much better than the 165's that are used on most of them now.