• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Class 175 future speculation

Status
Not open for further replies.

Philip

On Moderation
Joined
27 May 2007
Messages
3,734
Location
Manchester

They're an obscure fleet of trains which haven't been added to since the 175s/180s were built, this would usually make obtaining parts more difficult. It's already been well documented that the maintenance requirements are sensitive in order to retain reliability; reliability has seemingly already dropped since Chester depot started maintaining 197s, plus they apparently have quite serious corrosion issues.
The 165s are not at the life-expired stage yet and probably still have 10-15 years ledt, so it would make more sense for Chiltern to keep them than to replace them with a problematic fleet of trains.

The 168s are solid enough for the mainline and hopefully in time more units will be converted to hybrid.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

QSK19

Member
Joined
29 Dec 2020
Messages
1,144
Location
Leicestershire
reliability has seemingly already dropped since Chester depot started maintaining 197s, plus they apparently have quite serious corrosion issues.
Perfect reason for the 175s to go to EMR then - not like we’ve seen reduction in reliability and/or corrosion before the ex-LNER HSTs, 360s, HT 180s, etc, were cascaded over to EMR… :lol:
 
Last edited:

Mikey C

Established Member
Joined
11 Feb 2013
Messages
8,239
The 165s are hardly an orphan fleet either, considering all the GWR 165s and 166s as well.

They work fine on the services via Amersham. Ideally you'd want to replace the ones on the mainline stopping services, as that's a 100mph railway.
 

12LDA28C

Established Member
Joined
14 Oct 2022
Messages
5,058
If Chiltern order new mechanical DMUs then the world really has gone mad. It needs electrifying.

The sensible choice is to put the issue off for 10 years or so by taking more recent spare DMUs e.g. 170/175 and removing some 165s and the LHCS, or to go bi-mode with batteries (so the engines aren't on inside London or Birmingham). I tend towards the former - now doesn't seem to be a good time for making long term choices on the railway, so I'd advocate the 175s.

Anyone seriously believing that the Chiltern routes will be electrified is delusional. It won't happen, at least not in my lifetime.

Even newbuild DMMUs are significantly quieter and less polluting than the 30+ year-old units that they would replace and of course if even what is effectively a brand new line for EWR is being built without wires then why on earth would the Chilterns be electrified at huge cost and years of disruption? Bi-mode with batteries doesn't seem to have been a particularly successful option so far...

== Doublepost prevention - post automatically merged: ==

The Chiltern line should be, but is not on the priority list for electrification. I agree on the 175s being an interrim because they can last until the line gets electrification and brand new EMUs in 15-20 years time.

Please provide a link to any information confirming the plan 'in 15-20 years time' to electrify the Chiltern line.
 

RailWonderer

Established Member
Joined
25 Jul 2018
Messages
2,217
Location
All around the network
Anyone seriously believing that the Chiltern routes will be electrified is delusional. It won't happen, at least not in my lifetime.

Even newbuild DMMUs are significantly quieter and less polluting than the 30+ year-old units that they would replace and of course if even what is effectively a brand new line for EWR is being built without wires then why on earth would the Chilterns be electrified at huge cost and years of disruption? Bi-mode with batteries doesn't seem to have been a particularly successful option so far...

== Doublepost prevention - post automatically merged: ==



Please provide a link to any information confirming the plan 'in 15-20 years time' to electrify the Chiltern line.
No there is no source but we are in the speculative section of the forum. As a busy commuter line to London it's a major anomaly and I always wonder how much longer until electrification. Surely it will have to happen in your lifetime, unless you are old.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,091
Location
"Marston Vale mafia"
No there is no source but we are in the speculative section of the forum. As a busy commuter line to London it's a major anomaly and I always wonder how much longer until electrification. Surely it will have to happen in your lifetime, unless you are old.

At some point not too far off London will ban all internal combustion engined transport, rail included. So something will have to happen, even if it's just bimodes and wires to Wycombe, say. (I say Wycombe because the inner stoppers could then be EMUs).
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,652
Anyone seriously believing that the Chiltern routes will be electrified is delusional. It won't happen, at least not in my lifetime.

Even newbuild DMMUs are significantly quieter and less polluting than the 30+ year-old units that they would replace and of course if even what is effectively a brand new line for EWR is being built without wires then why on earth would the Chilterns be electrified at huge cost and years of disruption? Bi-mode with batteries doesn't seem to have been a particularly successful option so far...

== Doublepost prevention - post automatically merged: ==



Please provide a link to any information confirming the plan 'in 15-20 years time' to electrify the Chiltern line.
You won't get a link, but its certainly being looked at strategically within NR.
 

Mikey C

Established Member
Joined
11 Feb 2013
Messages
8,239
Of course the line will be electrified, or at least part electrified, it's a question of when not if. I'd be amazed if it hadn't started before say 2030
 

12LDA28C

Established Member
Joined
14 Oct 2022
Messages
5,058
You won't get a link, but its certainly being looked at strategically within NR.

Seriously? Maybe someone should tell Chiltern then as they don't seem to share your view. And yet EWR gets de-scoped from being OHLE even though structures at the western end have been gauged for wires. I seriously can't see it happening. The tunnels on the approach to Marylebone / bridge over the WCML would be a particularly tricky problem to overcome surely.

More likely some kind of battery hybrid unit that can switch to diesel somewhere in the suburbs, if they can get the technology working.

== Doublepost prevention - post automatically merged: ==

Of course the line will be electrified, or at least part electrified, it's a question of when not if. I'd be amazed if it hadn't started before say 2030

So how do you explain Chiltern asking for expressions of interest from ROSCOs and manufacturers for a fleet of hybrid trains to replace the current fleet? Would they be going down that path if, as you seem to believe, electrification will start by the end of the decade? Chiltern certainly do not believe that will happen, clearly.
 

craigybagel

Established Member
Joined
25 Oct 2012
Messages
5,822
Seriously? Maybe someone should tell Chiltern then as they don't seem to share your view. And yet EWR gets de-scoped from being OHLE even though structures at the western end have been gauged for wires. I seriously can't see it happening. The tunnels on the approach to Marylebone / bridge over the WCML would be a particularly tricky problem to overcome surely.

More likely some kind of battery hybrid unit that can switch to diesel somewhere in the suburbs, if they can get the technology working.
With all due respect, if The Planner says something is being looked at, then I would believe them.

In any case I would hope that Network Rail would be looking at every line in the country. Obviously many lines will be a long way from being electrified, if ever, but it would be rather remiss of NR to not have at least some degree of planning taking place just in case - if only to be able to give a quick answer to the question of "how feasible would electrification of this line be?".
So how do you explain Chiltern asking for expressions of interest from ROSCOs and manufacturers for a fleet of hybrid trains to replace the current fleet? Would they be going down that path if, as you seem to believe, electrification will start by the end of the decade? Chiltern certainly do not believe that will happen, clearly.
Similarly to NR I would expect Chiltern to be keeping their options open too. Lots of companies ask for expressions of interest, it doesn't mean they're committed to a long term diesel fleet. It does mean though that towel be in a slightly better position if it looks like electrification is definitely not happening.

However, this is probably getting off topic. Suffice to say that 175s to Chiltern are certainly a plausible option in the short to medium term.
 

12LDA28C

Established Member
Joined
14 Oct 2022
Messages
5,058
With all due respect, if The Planner says something is being looked at, then I would believe them.

In any case I would hope that Network Rail would be looking at every line in the country. Obviously many lines will be a long way from being electrified, if ever, but it would be rather remiss of NR to not have at least some degree of planning taking place just in case - if only to be able to give a quick answer to the question of "how feasible would electrification of this line be?".

Similarly to NR I would expect Chiltern to be keeping their options open too. Lots of companies ask for expressions of interest, it doesn't mean they're committed to a long term diesel fleet. It does mean though that towel be in a slightly better position if it looks like electrification is definitely not happening.

I believe the MD of Chiltern has recently literally stated that there is no current prospect of electrification hence the need for a hybrid fleet, or similar. That would suggest there is nothing on the horizon for at least a generation.
 

RobShipway

Established Member
Joined
20 Sep 2009
Messages
3,337
You won't get a link, but its certainly being looked at strategically within NR.
Of course the line will be electrified, or at least part electrified, it's a question of when not if. I'd be amazed if it hadn't started before say 2030
Seriously? Maybe someone should tell Chiltern then as they don't seem to share your view. And yet EWR gets de-scoped from being OHLE even though structures at the western end have been gauged for wires. I seriously can't see it happening. The tunnels on the approach to Marylebone / bridge over the WCML would be a particularly tricky problem to overcome surely.

More likely some kind of battery hybrid unit that can switch to diesel somewhere in the suburbs, if they can get the technology working.

== Doublepost prevention - post automatically merged: ==



So how do you explain Chiltern asking for expressions of interest from ROSCOs and manufacturers for a fleet of hybrid trains to replace the current fleet? Would they be going down that path if, as you seem to believe, electrification will start by the end of the decade? Chiltern certainly do not believe that will happen, clearly.
So why are Chiltern doing tests with a class 168 using a Rolls Royce Hybrid drive?

I suspect that 168329 has been changed to Hybridflex to not only see if the technology works, but as 12LDA28C has explained, it is very tricky to be placing OHLE on the bridge on the approach to Marylebone, so Chiktern are having to look at other options. It could be that they take on the class 175 fleet, that these get converted to be powered by Rolls Royce Hybrid engines, such that they could convert in the suburbs prior to entering or leaving Marylebone into quiet drive.
With all due respect, if The Planner says something is being looked at, then I would believe them.

In any case I would hope that Network Rail would be looking at every line in the country. Obviously many lines will be a long way from being electrified, if ever, but it would be rather remiss of NR to not have at least some degree of planning taking place just in case - if only to be able to give a quick answer to the question of "how feasible would electrification of this line be?".

Similarly to NR I would expect Chiltern to be keeping their options open too. Lots of companies ask for expressions of interest, it doesn't mean they're committed to a long term diesel fleet. It does mean though that towel be in a slightly better position if it looks like electrification is definitely not happening.

However, this is probably getting off topic. Suffice to say that 175s to Chiltern are certainly a plausible option in the short to medium term.
If that is the case then I doubt that the Chiltern lines would be electrified much before about 2040, so the class 175 with or without be converted to use the Rolls Royce Hybrid drive I have not doubt is a possibility.

The future, I suspect maybe Hybrid but Electric/Battery power trains in the last section before entering Marylebone. But that will be 2040's onwards.
 

The Ham

Veteran Member
Joined
6 Jul 2012
Messages
12,035
I believe the MD of Chiltern has recently literally stated that there is no current prospect of electrification hence the need for a hybrid fleet, or similar. That would suggest there is nothing on the horizon for at least a generation.

Not necessarily, there's plenty of other places such a train could be used and so it being used for at least 10 years (as it'll take several years to electrify enough for to be usable by straight EMU's and longer still for the whole line to be done).

However even that assumes that such a train couldn't be retrofitted to allow electric pick up.
 

tomuk

Established Member
Joined
15 May 2010
Messages
2,009
They're an obscure fleet of trains which haven't been added to since the 175s/180s were built, this would usually make obtaining parts more difficult. It's already been well documented that the maintenance requirements are sensitive in order to retain reliability; reliability has seemingly already dropped since Chester depot started maintaining 197s, plus they apparently have quite serious corrosion issues.
The 165s are not at the life-expired stage yet and probably still have 10-15 years ledt, so it would make more sense for Chiltern to keep them than to replace them with a problematic fleet of trains.

The 168s are solid enough for the mainline and hopefully in time more units will be converted to hybrid.
You would be wrong then. The 175s and 180s are assembled from what were the best components available across Europe at the time. They share parts with various emus\dmus Alstom and others built at the time. Their lack of reliability is down to two things, firstly the badly integrated design of said parts i.e. routing of cable runs and hoses over hot exhausts and engines and secondly a distinct attraction the bodyshells have to tinworm.

The 165s are a lot older and a full of various BR era obsolete components. The Perkins engines are a particular gripe as although CAT\Perkins still support them the overhaul costs of what was always a more bespoke and delicate engine than the Cummins are rising fast.
 

Energy

Established Member
Joined
29 Dec 2018
Messages
5,135
I believe the MD of Chiltern has recently literally stated that there is no current prospect of electrification hence the need for a hybrid fleet, or similar. That would suggest there is nothing on the horizon for at least a generation.
Network Rail's Chiltern and East West Rail Strategy does mention electrification but its a long term aspiration (by 2043 they say), this interview with the Chiltern MD might be what you are thinking of but its behind a pay wall so I'm not sure. Id be very suprised if NR hadn't looked internally into Chiltern electrification.

As for rolling stock Chiltern will be keeping their options open and finding out costs of various solutions, they've also been interested in battery units.
 

12LDA28C

Established Member
Joined
14 Oct 2022
Messages
5,058
this interview with the Chiltern MD might be what you are thinking of but its behind a pay wall so I'm not sure. Id be very suprised if NR hadn't looked internally into Chiltern electrification.

As for rolling stock Chiltern will be keeping their options open and finding out costs of various solutions, they've also been interested in battery units.

The statement about electrification not being on the agenda currently was made during an internal staff briefing at Chiltern.
 

Mikey C

Established Member
Joined
11 Feb 2013
Messages
8,239
Network Rail's Chiltern and East West Rail Strategy does mention electrification but its a long term aspiration (by 2043 they say), this interview with the Chiltern MD might be what you are thinking of but its behind a pay wall so I'm not sure. Id be very suprised if NR hadn't looked internally into Chiltern electrification.

As for rolling stock Chiltern will be keeping their options open and finding out costs of various solutions, they've also been interested in battery units.
That 2043 date doesn't mean that nothing will happen for 20 years! That could be the date when electrification is complete, with work starting well before then and in phases.

Battery units aren't going to get very far along the Chiltern Line without some partial electrification so that they can be recharged on the move anyway.
 

Rhydgaled

Established Member
Joined
25 Nov 2010
Messages
4,856
Anyone seriously believing that the Chiltern routes will be electrified is delusional. It won't happen, at least not in my lifetime.

Even newbuild DMMUs are significantly quieter and less polluting than the 30+ year-old units that they would replace and of course if even what is effectively a brand new line for EWR is being built without wires then why on earth would the Chilterns be electrified at huge cost and years of disruption?
There is a national target for Net Zero greenhouse gas (or is it just CO2?) emmissions by 2050. Not a 50% cut in emmissions or anything like that, but net-ZERO. Yes, that is net and not absolute zero but it's not like we can just leave residual emmissions (however small - and I'll accept the emissions from a few 165s or 175s are unlikely to be significant enough to grab headlines) without addressing them. To reach net-zero, even the tiniest source of CO2 emissions will either need to be eliminated or an equal amount of CO2 will need to be removed from the atmosphere to offset the residual emissions (and there of course will be some).

Thus, if the Chiltern line is not electrified, somebody needs to identify how the additional emissions resulting from the decision are to be sequestered. North of Aynho Junction, the Chiltern line carries CrossCountry Voyagers, probably the most-significant source of diesel emissions on the UK passenger railway, and if I recall correctly was included in the aborted 'electric spine' proposal so presumablly carries a fair bit of freight.

If you ask me, Basingstoke-Reading and Didcot-Oxford-Aynho-Birmingham should be fairly high on the priority list for electrification, so that Manchester-Bournemouth can be worked by dual-voltage EMUs (OHLE + third rail), and it is the decisions to order large numbers of new DMMUs in recent years (195s, 196s and 197s) and to delete electrification from the scope of EWR that were delusional.

Bi-mode with batteries doesn't seem to have been a particularly successful option so far...
The only bi-mode with batteries (or 'tri-mode' as the responsible TOC call it) for the UK that I can think of are the class 756s for the Cardiff Metro and they weren't due in service yet anyway were they?

Please provide a link to any information confirming the plan 'in 15-20 years time' to electrify the Chiltern line.
No there is no source but we are in the speculative section of the forum. As a busy commuter line to London it's a major anomaly and I always wonder how much longer until electrification. Surely it will have to happen in your lifetime, unless you are old.
You won't get a link, but its certainly being looked at strategically within NR.
There were no timescales for delivery of individual sections (and thus it doesn't support the claim that the Chilterns would be wired 'in 15-20 years'), but I can give you a link to the interim report for Network Rail's decarbonisation strategy (TDNS) https://www.networkrail.co.uk/wp-content/uploads/2020/09/Traction-Decarbonisation-Network-Strategy-Executive-Summary.pdf - this is an official Network Rail document and certainly recommends electrification of the Chiltern mainline, along with much of the rest of the network, by 2050 (just under 30 years time). Unfortunately, the Government has apparently refused to fund implementation of the decarbonisation strategy, but there were suggestions (I think in Modern Railways) that somebody (possibly the GBR transition team) is working on something similar but broken into smaller chunks that the Government might be more-willing to fund.

I believe the MD of Chiltern has recently literally stated that there is no current prospect of electrification hence the need for a hybrid fleet, or similar. That would suggest there is nothing on the horizon for at least a generation.
"No current prospect of electrification" could have very different meanings depending on your interpretation of the word "current". If they want to withdraw the class 165s at 40 years old then they need new trains ready around 2030. That's only 7 years away, and I would agree that there is no prospect of electrification allowing the 165s to be replaced by pure EMUs in that timeframe. The 175s, on the other hand, are ten years newer than the 165s and would be deployed on the Chiltern mainline (London-Birmingham services) which is more-likely to see electrification by 2040 (thanks to freight and XC usage north of Aynho) than the Aylesbury branch (where Wikipedia suggests 165s are more likely to be found).

Not necessarily, there's plenty of other places such a train could be used and so it being used for at least 10 years (as it'll take several years to electrify enough for to be usable by straight EMU's and longer still for the whole line to be done).

However even that assumes that such a train couldn't be retrofitted to allow electric pick up.
Converting a diesel-mechanical/hydraulic mutliple unit to allow electric pick-up sounds exceedingly difficult to me, and I can't recall reading of any examples of it ever having been done. You might be better off converting to an unpowered trailer unit (like a 4-TC) and building some powerful new EMUs to pull/push them around. Given the decarbonisation imperative, it is my view that procurement of any new units that do not allow for electric pick-up (or at least easy retrofittment of this) should be banned.
 

RailWonderer

Established Member
Joined
25 Jul 2018
Messages
2,217
Location
All around the network
There were no timescales for delivery of individual sections (and thus it doesn't support the claim that the Chilterns would be wired 'in 15-20 years'), but I can give you a link to the interim report for Network Rail's decarbonisation strategy (TDNS) https://www.networkrail.co.uk/wp-content/uploads/2020/09/Traction-Decarbonisation-Network-Strategy-Executive-Summary.pdf - this is an official Network Rail document and certainly recommends electrification of the Chiltern mainline, along with much of the rest of the network, by 2050 (just under 30 years time). Unfortunately, the Government has apparently refused to fund implementation of the decarbonisation strategy, but there were suggestions (I think in Modern Railways) that somebody (possibly the GBR transition team) is working on something similar but broken into smaller chunks that the Government might be more-willing to fund.


"No current prospect of electrification" could have very different meanings depending on your interpretation of the word "current". If they want to withdraw the class 165s at 40 years old then they need new trains ready around 2030. That's only 7 years away, and I would agree that there is no prospect of electrification allowing the 165s to be replaced by pure EMUs in that timeframe. The 175s, on the other hand, are ten years newer than the 165s and would be deployed on the Chiltern mainline (London-Birmingham services) which is more-likely to see electrification by 2040 (thanks to freight and XC usage north of Aynho) than the Aylesbury branch (where Wikipedia suggests 165s are more likely to be found).

Once Manchester - Leeds and possibly York via Garforth is electrified, TPE will probably run pure EMUs (unless the route returns to Northern which would run EMUs) on the stoppers on that line and bi-modes on Hull and Redcar (Newcastle is already bi-mode 802 run) releasing enough 185s to cascade to other lines like Chiltern if 175s don't make it.
 

Energy

Established Member
Joined
29 Dec 2018
Messages
5,135
That 2043 date doesn't mean that nothing will happen for 20 years! That could be the date when electrification is complete, with work starting well before then and in phases.
Of course, the important part is "by" :)
 

317 forever

Established Member
Joined
21 Aug 2010
Messages
3,267
Location
North West
They're an obscure fleet of trains which haven't been added to since the 175s/180s were built, this would usually make obtaining parts more difficult. It's already been well documented that the maintenance requirements are sensitive in order to retain reliability; reliability has seemingly already dropped since Chester depot started maintaining 197s, plus they apparently have quite serious corrosion issues.
The 165s are not at the life-expired stage yet and probably still have 10-15 years ledt, so it would make more sense for Chiltern to keep them than to replace them with a problematic fleet of trains.

The 168s are solid enough for the mainline and hopefully in time more units will be converted to hybrid.
Alternatively, the 175s could go to Chiltern and displace the 165s to GWR to replace class 150 Sprinters.
 

D365

Veteran Member
Joined
29 Jun 2012
Messages
13,161
So why are Chiltern doing tests with a class 168 using a Rolls Royce Hybrid drive?

I suspect that 168329 has been changed to Hybridflex to not only see if the technology works, but as 12LDA28C has explained, it is very tricky to be placing OHLE on the bridge on the approach to Marylebone, so Chiktern are having to look at other options. It could be that they take on the class 175 fleet, that these get converted to be powered by Rolls Royce Hybrid engines, such that they could convert in the suburbs prior to entering or leaving Marylebone into quiet drive.

If that is the case then I doubt that the Chiltern lines would be electrified much before about 2040, so the class 175 with or without be converted to use the Rolls Royce Hybrid drive I have not doubt is a possibility.

The future, I suspect maybe Hybrid but Electric/Battery power trains in the last section before entering Marylebone. But that will be 2040's onwards.
Because it's a Porterbrook initiative, not strictly Chiltern. Hybrid conversions don't help with component obsolescence.
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,280
Alternatively, the 175s could go to Chiltern and displace the 165s to GWR to replace class 150 Sprinters.
165s aren't suitable as 150 replacements. Making that change would require two sets of staff training, which is expensive. 150s are reportedly easier to maintain and run than 165s. 175s aren't ideal on a lot of the work that 165s do on Chiltern.

If 175s are to have further use they need to go somewhere where there is an objective reason for them to be there, otherwise they may as well simply be off lease.
 

tomuk

Established Member
Joined
15 May 2010
Messages
2,009
Because it's a Porterbrook initiative, not strictly Chiltern. Hybrid conversions don't help with component obsolescence.
The imitative is to try and get the government to open their wallet and buy some Hybrid powerpacks of Rolls Royce\MTU the technology works fine an can reduce emissions. The Hybrid pack is a straight swap with the non hybrid MTU power pack already fitted to 168/170/171 and 172.

Fitting a similar hybrid pack or just a newer engine only would improve emissions reduce obsolescence issues on any of the Turbos or older sprinters. The Cummins 855s and Perkins 2000s haven't been made for thirty years.
 

D365

Veteran Member
Joined
29 Jun 2012
Messages
13,161
The imitative is to try and get the government to open their wallet and buy some Hybrid powerpacks of Rolls Royce\MTU the technology works fine an can reduce emissions. The Hybrid pack is a straight swap with the non hybrid MTU power pack already fitted to 168/170/171 and 172.

Fitting a similar hybrid pack or just a newer engine only would improve emissions reduce obsolescence issues on any of the Turbos or older sprinters. The Cummins 855s and Perkins 2000s haven't been made for thirty years.
By "component obsolescence" I was referring to the electrical and mechanical components that the hybrid conversion doesn't touch.
 

Philip

On Moderation
Joined
27 May 2007
Messages
3,734
Location
Manchester
There's a natural cascade - 175 replaces LHCS and 168s on the runs that go to Birmingham. 168 replaces 165 on shorter runs.

Again, the 168s are good enough for the Chiltern mainline as they are and 165s good for the suburban services. A 175 isn't an upgrade particularly with the reliability problems and extra maintenance needed, plus there aren't enough 175 vehicles compared to 168 vehicles and there is more flexibility with the 168 fleet because of the carriage formations; class 175s would have to be doubled up and without the gangways this isn't ideal.
 

RobShipway

Established Member
Joined
20 Sep 2009
Messages
3,337
Again, the 168s are good enough for the Chiltern mainline as they are and 165s good for the suburban services. A 175 isn't an upgrade particularly with the reliability problems and extra maintenance needed, plus there aren't enough 175 vehicles compared to 168 vehicles and there is more flexibility with the 168 fleet because of the carriage formations; class 175s would have to be doubled up and without the gangways this isn't ideal.
The class 175 units would only be replacing the LHCS fleet if they joined. I cannot see the difference in class 168's being doubled up with no gangways, to class 175 units doubled up with no gangways?
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,091
Location
"Marston Vale mafia"
class 175s would have to be doubled up and without the gangways this isn't ideal.

No Chiltern stock is gangwayed and almost all trains are formed of more than one unit. It really doesn't make any difference on mostly-DOO commuter trains, people board in their usual place and stay there, hardly anyone walks through.
 

warwickshire

On Moderation
Joined
6 Feb 2020
Messages
2,302
Location
leamingtonspa
I Would still say Chiltern. However could history repeat itself because remember a few years ago. When Abeillo won the Emr franchise from stagecoach and arriva complained about the franchise process due to it not getting it but Abeillo did. At the time Chiltern got beaten and instead 170416 to 170420 ie the x4 ex scotrail units went to Emr instead of rumoured going to Chiltern which kept the Locomotive Hauled service going. However could history possibly repeat itself, but this time with the 175. Ie instead go to Gwr and not to Chiltern as rumoured, because Gwr might quite well realise getting rid of all the Castle hsts will see itself short or a little short on some services especially off peak and weekends as leisure travellers who are travelling are higher than pre covid. and with the demise of 769 no extra turbos are viable either.
Unless maybe split across both franchises maybe?
 
Status
Not open for further replies.

Top