End vestibules is NOT an Intercity-only feature, it is also the appropriate configuration for Regional Express services (such as most of the 175's current work) and Regional/Rural services (such as the Heart Of Wales Line). Why else did BR build the 155s and 156s with end doors and only a 75mph top speed? If anything, if there is a problem with the 175's top speed it is that they are too fast/high-powered. Routes that have been considered important enough to justify an upgrade to 90/100mph are typically too busy for 2/3-car units running alone all day (it's a similar story with Voyagers, Meridians, 800s/802s etc. - the 125mph routes are busy enough to need more than five coaches). That isn't a problem with 158s as they have unit end gangways so you can just couple them together, but the 175's lack of gangways makes them less user-friendly as 4/5-car trains.
Didn't I read the other day that GWR have now scrapped the Brighton services? Cardiff-Portsmouth though seems the ideal place to send them if they can't be kept with TfW or if TfW can find a suitable replacement for them. Cardiff-Portsmouth already suffers from non-gangwayed units being run in multiple so in that respect the 175s wouldn't be a step backwards and in terms of suitability for long-distance passengers the 175s would be a massive improvement over the 166s/165s. Similarly, EMR's plan to use 170s on Liverpool-Norwich would have the gangway issue so 175s would be no worse in that respect so would also be a good alternative for EMR.