155341 has had a small fire at Smithy Bridge and for thay reason no trains are running though in either ways as if yet.
Second one within a few months near smithy bridge station

Sam
--- old post above --- --- new post below ---
9fafb4cc9e092acf5ff91b5e96789f95.jpg

c2ba09895a411d4f81f175e0efcbab8c.jpg


Couple of pictures of the stricken unit

Sam
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

northwichcat

Veteran Member
Joined
23 Jan 2009
Messages
32,692
Location
Northwich
According to Northern Rail's Twitter feed "GMPTE Metro are accepting tickets between Manchester and Rochdale"

That time machine worked!
 

TUC

Established Member
Joined
11 Nov 2010
Messages
5,050
The guard on my train has advised that the situation has been resolved and that the train will be operating through to Manchester after all.
 
Joined
18 Mar 2008
Messages
8
That is not good. That's 2x150 and now a 155 out of action since Saturday, and Northern is already critically short of units.
 

Bungle965

Established Member
Associate Staff
Buses & Coaches
Joined
2 Jul 2014
Messages
3,378
Location
Calder Valley
The guard on my train has advised that the situation has been resolved and that the train will be operating through to Manchester after all.

Yes when i left on the replacement bus, the orange army were crawling over the 155. Presumably it has been dragged or under it own power. Although when i got to Manchester every was still getting on the Metrolink towards Rochdale. Safe to say that 3 trams went past me all of them were full with people standing.
Sam
--- old post above --- --- new post below ---
That is not good. That's 2x150 and now a 155 out of action since Saturday, and Northern is already critically short of units.

No it will not be good for them. I can see a few services being cancelled tomorrow, unless they get the 155 fixed of course.
Sam
--- old post above --- --- new post below ---
According to Northern Rail's Twitter feed "GMPTE Metro are accepting tickets between Manchester and Rochdale"

That time machine worked!

WOW that was a while ago. To be honest im just glad they got the information out.
Sam
 

northwichcat

Veteran Member
Joined
23 Jan 2009
Messages
32,692
Location
Northwich
I doubt they`ll be many cancellations due to shortage of units but instead a lot of 2 car workings on 4 car diagrams.
 

Bungle965

Established Member
Associate Staff
Buses & Coaches
Joined
2 Jul 2014
Messages
3,378
Location
Calder Valley
Smithy Bridge station has a gated road level crossing next to the station. Was any road traffic using that crossing affected?

From what I understand of it the barriers remained down until the driver phoned up the signaler and let him know of the situation. The barriers were then raised.
Sam
 
Last edited:

WCMLaddict

Member
Joined
20 Mar 2012
Messages
417
The train didn't pass the signal protecting the crossing so it could have been kept open for traffic all that time.
 

Bungle965

Established Member
Associate Staff
Buses & Coaches
Joined
2 Jul 2014
Messages
3,378
Location
Calder Valley
The train didn't pass the signal protecting the crossing so it could have been kept open for traffic all that time.

That depends if it was non stopping or not if it was not stopping the barriers would go down before it had reached that point. If it was stopping then no it would not go down.
Sam
--- old post above --- --- new post below ---
Whats happened to the Northern 150s then?

2 150s derailed near Harrogate.
I will try and find the link when I get home.
Sam
 

WCMLaddict

Member
Joined
20 Mar 2012
Messages
417
It has nothing to do with whether it was stopper or not. Question was about the crossing barriers being able to function as normal which they were as the train stopped before protecting signal.
 