The creation of the ‘13e’ is a modern equivalent of the shunters built in 1965 for use at Tinsley Marshalling Yard, in South Yorkshire, which had a hump.
Three pairs of Class 08s were permanently coupled with the front locomotive having its cab removed. They would propel freight trains up the hump before wagons ran down the other side into the correct sidings.
All were withdrawn between 1981 and 1985 and were scrapped.
The first production '08e' was delivered to Heidelberg Material UK's Whatley Quarry in January.
08787 has been converted to electric power after the prototype (08308) was successfully trialled at the site in 2024.