Anyone know what's been going on at Clapham J platforms 1 & 2 today? They've been closed for almost the whole day and TfL status says the Windrush Line is suspended between CLJ and Surrey Quays due to a "Fire Alert"
I can also see that the Mildmay is diverting into platform 17 due to the same issue
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

starlight73

Member
Joined
1 May 2024
Messages
167
Location
London
There was a fire on the track near Clapham Junction which is now extinguished (2117).

The fire next to the track in the Clapham Junction area has been extinguished, and Network Rail teams are continuing to assess the damage it has caused to the railway infrastructure.

Services between Clapham Junction and Dalston Junction will be cancelled or revised to run between Battersea Park and Dalston Junction.

No Windrush line services will serve Clapham Junction.

Disruption is expected until the end of the day.


Traksy is showing that there is a block to electric traction in platform 1, a "*TI*" in platform 2. The approaches to these platforms from both Imperial Wharf (Latchmere Jn) and Wandsworth Road (Longhedge Jn) are marked as "NOGO"
(A traksy map showing the above)
1776198715773.png
 

GW43125

Established Member
Joined
8 Dec 2014
Messages
2,310
Fire at a substation near Longhedge Jn which has reportedly taken out a bunch of feeder cables.
 

swr444

Member
Joined
26 Aug 2008
Messages
994
Location
London
Looks to have been resolved finally. I guess it was enough to knock out the power to Wandsworth Road? Otherwise they would have run the Windrush trains to Battersea Park instead of Surrey Quays surely
 

Belperpete

Established Member
Joined
17 Aug 2018
Messages
3,612
Looks to have been resolved finally. I guess it was enough to knock out the power to Wandsworth Road? Otherwise they would have run the Windrush trains to Battersea Park instead of Surrey Quays surely
The NR status page in post #2 above says some Windrush trains running to Battersea Park. I suspect the issue might be that they couldn't maintain the timetable if they ran all trains to Battersea. I seem to recall that the timetable involves some very slick working at Clapham Jcn, with the next train arriving very shortly after the previous one has left. Do those timings work if they divert to Battersea?
 

greatkingrat

Established Member
Joined
20 Jan 2011
Messages
3,291
Battersea Park can handle the whole Windrush service (which happens during engineering work). In fact it is closer to Wandsworth Road than Clapham Junction is, so there is no problem with timings.
 