Civils Contracts in OJEU

Status
Not open for further replies.

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,320
Some civils contract details have appeared in OJEU:

The contract notice is published in today’s edition of Tenders Electronic Daily: Supplement to the Official Journal of the EU.

Publication of the tender documentation was announced by the chancellor of the exchequer George Osborne last week during an official visit to China. [See previous report here.]

The Phase 1 civils works, for the line between London and Birmingham, have been divided into seven work packages:

South 1: Euston Tunnels and Approaches — the tunnels between Old Oak Common and Euston stations, the Old Oak Common station box and the Euston station approaches (Lot 1). Estimated contract value £600m-£900m.
South 2: Northolt Tunnels — Old Oak Common Tunnel, Northolt Tunnel, Victoria Road Crossover Box and Northolt Tunnel West Portal to Harvill Road (Lot 2). Estimated contract value £850m to £1.4bn.
Central 1: Chiltern Tunnel and Colne Valley Viaduct — Colne Viaduct, Tile House Chiltern Portal, Chiltern South Portal and Chiltern Tunnel (Lot 3). Estimated contract value £800m to £1.3bn.
Central 2: North Portal Chiltern Tunnels to Brackley — Surface Route and Calvert Maintenance Depot (Lot 4). Estimated contract value £800m to £1.3bn.
Central 3: Brackley to South Portal of Long Itchington Wood Green Tunnel — Surface Route (Lot 5). Estimated contract value £600m to £900m.
North 1: Long Itchington Wood Green Tunnel to Delta Junction and Birmingham Spur — Long Itchington to Delta and Birmingham Spur, including Washwood Heath Control Centre (Lot 6). Estimated contract value £900m to £1.5bn.
North 2: Delta Junction to West Coast Main Line tie-in — Main Line, North Chord, Leeds Spur and Birmingham Spur East (Lot 7). Estimated contract value £800m to £1.3bn.

From theconstructionindex here: http://www.theconstructionindex.co.uk/news/view/hs2-civils-contract-notice-published

I wonder if StopHS2 will be commenting...
 