I don't think the question was why it wasn't done as part of the dive-under, but rather why it wasn't scheduled to have been done during the period that the railway was closed for the dive-under works.Because the work and contracted work to build the dive under had nothing to do with these points or any other work done at the time it was being build over the past 12 plus months.