swt_passenger
Veteran Member
- Joined
- 7 Apr 2010
- Messages
- 34,227
The post September timetables are on the NR track access pages. Haven't compared them line by line with the earlier versions, but that Gerrrards Cross shuttle that has been talked about seems pretty random, rather than a regular all day thing...
Three separate files, 4,5 and 6 on the page here:
http://www.networkrail.co.uk/browseDirectory.aspx?dir=\Track Access\1 Current Consultations\2011.06.20 Chiltern 89th SA - closing date 18 July 2011&pageid=4591&root=
Three separate files, 4,5 and 6 on the page here:
http://www.networkrail.co.uk/browseDirectory.aspx?dir=\Track Access\1 Current Consultations\2011.06.20 Chiltern 89th SA - closing date 18 July 2011&pageid=4591&root=