HSTEd
Veteran Member
- Joined
- 14 Jul 2011
- Messages
- 20,287
I think it's likely that Aylesbury/Aylesbury Vale Parkway would get the two current Chiltern paths north of Harrow and also an extension of the two Amersham terminators. The marginal cost of extending the Amersham terminators would be very low given the low station density north of there and consequently high average speeds.Other than the general benefits of having a TfL-run service (decent trains and simpler fares, which can be achieved with a new BEMU order and Project Oval instead) I don't see how that would bring significant improvements.
Frequency is unlikely to go above 2tph - the only minor improvement possible is extending both trains per hour to Vale Parkway instead of just one. The Met Line S-stock trains are also slightly slower than the class 165s, and have more longitudinal seating, which wouldn't be comfortable if coming all the way from Aylesbury.
Also, while you would get direct trains to Baker Street, King's Cross, Liverpool Street etc, this would be at the cost of gaining extra stops at Finchley Road, Wembley Park and Moor Park, assuming it uses the Met line 'fast' stopping pattern (which is not a guarantee). Marylebone isn't perfect but running fast after Rickmansworth/Harrow is 20 mins faster, making the walk to Baker Street (or changing to the Bakerloo line) quicker than a direct tube service.
If the transfer at Marylebone is improved, through easier access to the Bakerloo platforms, or an easier walking route to Baker Street (avoiding traffic lights etc) it would be faster and cheaper than extending the Met.
The line speed on the route doesn't really benefit the diesel units, it's not really much above the capability of S Stock as I recall.
Of course the railway industry benefits by allowing this operational annoyance to be dispensed with, including allowing elimination of significant trackwork, tripcocks and all that comes with them.