From the Danish Railway's website:
View attachment 191911
In comparison, since 2014 the UK has electrified:
Manchester to Preston, Wigan, and Liverpool (via Chat Moss),
extended the GWML electrification from Heathrow Airport Jn to Cardiff, Chippenham and Newbury (don't talk about the fact it doesn't get to Bristol...),
Preston to Blackpool,
Walsall to Rugeley,
Gospel Oak to Barking/Barking Riverside,
Edinburgh to Glasgow via Shotts,
Bedford to (nearly) Leicester,
Crossrail (London)
Cardiff Valley Lines (discontinuous)
Barrhead/East Kilbride lines
Many other small corners and curves that I'm not going to list in full detail. And is in the process of electrifying Manchester-Huddersfield-Leeds-York as part of Transpennine Route Upgrade. I've probably missed some things as well.
Unfortunately I don't have the time in the near future to work this out on a track-km or route-km basis. But see:
http://www.railwaycodes.org.uk/electrification/dates.shtm