Canterbury has a proper cathedral, Oxford has a glorified college chapel. I'm going with Canterbury on this one. ;)

Not that I disagree, but having a cathedral does not make a town a city anymore. Guildford is a good example of a town that has a cathedral.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

alexx

Member
Joined
17 Sep 2015
Messages
95
Councillors reject Network Rail's attempts to break its promise of Silent Track in Oxford

http://www.oxfordmail.co.uk/news/14..._break_its_promise_of_Silent_Track_in_Oxford/

Councillors have rejected Network Rail's "questionable" attempts to renege on its promise to install Silent Track through North Oxford and Wolvercote.

The rail firm argued that the £3.6m cost of installing the rail damping - to mitigate noise and vibration caused by the East-West Rail link - was not "value for money" and applied to withdraw from its commitment.

Trackside residents claimed NR's cost analysis was questionable and city councillors were also unconvinced and refused the application.

The line is due to open in December and faster and more frequent trains from Oxford to Oxford Parkway will begin to run.

Phase two of the East-West Rail link will see even more trains using the line which will be extended from Bicester to Bletchley.

Discussions hinged on whether it was "reasonably practicable" for Network Rail to install silent track - rubber dampers between the train wheels and the track.

Adrian Olsen, chairman of residents group Waterways Management Company, said: "It is like a country lane at the end of your garden being turned into a motorway - residents need all the mitigation possible to cope with this.

"All this about it being "reasonably practicable" is irrelevant to residents who are concerned about the noise and vibrations in their house."

Representatives from Network Rail said it had promised a trial of Silent Track - used in Blackfriars in London - "in good faith" in March 2015 but the cost benefit analysis had meant it could not keep that promise.

Council officers had originally said it was not a question of whether NR were willing to pay for the measure but whether it should and could.

The city council's West Area Planning Committee voted (eight in favour and one abstention) to refuse the plans.

Despite the refusal the rail firm insisted there would be no delay to the expected opening of the Oxford to Oxford Parkway link on December 12.

The Silent Track can be retro-fitted but Network Rail are expected to appeal the council's decision.

Network Rail said it had a "strong commitment" to environmental mitigation across the EWR link and that it was already spending £3.5m in Oxford on noise barriers and other measures.
 

route:oxford

Established Member
Joined
1 Nov 2008
Messages
4,949
Councillors reject Network Rail's attempts to break its promise of Silent Track in Oxford

http://www.oxfordmail.co.uk/news/14..._break_its_promise_of_Silent_Track_in_Oxford/

Do Oxford Council have the legal authority to stop the railway from opening? I could just imagine some of the Councillors standing on the line arguing with British Transport Police whether or not they were standing on a railway line if they haven't approved the opening...

rubber dampers between the train wheels and the track

So how does this work? Smear the top of the rails with rubber?
 

Doctor Fegg

Established Member
Joined
9 Nov 2010
Messages
2,135
Location
Charlbury
Adrian Olsen, chairman of residents group Waterways Management Company, said: "It is like a country lane at the end of your garden being turned into a motorway - residents need all the mitigation possible to cope with this.

I wonder what mitigation the developers of the 'Waterways' housing estate gave to the canal, and its residents, alongside which they put their development.
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,602
Location
Nottingham
I assume they actually mean the VIPA system or similar, which uses special chairs that grip the rail through rubber dampers.
 

jimm

Established Member
Joined
6 Apr 2012
Messages
5,276
The steelwork for the new Aristotle Lane pedestrian bridge is now on site ahead of this weekend's blockade though Oxford.
 

NickBucks

Member
Joined
17 May 2013
Messages
250
Network Rail have lost the battle with Oxfordshire CC according to the BBC local news this evening. "Silent rail " will now have to be laid. According to the NR spokesperson this will not delay the opening of the line to Oxford Parkway.
 

TheKnightWho

Established Member
Joined
17 Oct 2012
Messages
3,183
Location
Oxford
Network Rail have lost the battle with Oxfordshire CC according to the BBC local news this evening. "Silent rail " will now have to be laid. According to the NR spokesperson this will not delay the opening of the line to Oxford Parkway.

Will this lower the PSR through north Oxford?
 

FordFocus

Member
Joined
15 Apr 2015
Messages
918
Wouldn't have thought it would make a difference with noisy DMUs using the route than quieter electric trains.

All I can see happening from this is an expensive legal battle in courts about 3 decibels. The winners will be the legal firms and the losers are the taxpayer and possibly passengers if this scheme gets pushed back.
 

aylesbury

Member
Joined
3 Feb 2012
Messages
622
ll this was caused by a local Liberal councillor who decided to make a name for himself .This part of Oxford is not exactly pretty being a typical suburb ,the logical development from this row will be new motorways laid with rubber not tarmac and put in tunnels so as to control the noise.Lets hope that trains will run as expected and undoubtedly some of the aggrieved residents will use them with ear defenders on!
 

Andyjs247

Member
Joined
1 Jan 2011
Messages
734
Location
North Oxfordshire
GWR win with every day's delay, don't they?

Wouldn't have thought it would make a difference with noisy DMUs using the route than quieter electric trains.

All I can see happening from this is an expensive legal battle in courts about 3 decibels. The winners will be the legal firms and the losers are the taxpayer and possibly passengers if this scheme gets pushed back.

I'm inclined to agree. A 3dB reduction represents a halving of the sound pressure level or power. But it's not the same as halving the noise level - which would be a reduction of 10dB. To put it in context 3dB is rather like the difference between the sound of 2x37s vs 1x37 or for that matter 2x66s vs 1x66.

I suspect an average person probably wouldn't notice the difference between a double headed and single-headed freight train. But they may notice the difference between noisy older traction and something more modern. I'd rather Network Rail spent the money on electrification!
 

alexx

Member
Joined
17 Sep 2015
Messages
95
The comments section of a local newspaper website is always amusing - for the article I posted earlier the comments range from a rant that it's '"SilentTrack®", not "Silent Track"', to a demand that '[t]he Network Rail managers responsible should be prosecuted'.

The best comment though was this:

An Everyday Tale of Oxford infrastructure improvements - glacially slow, opposed at every step and with negligible outcome.

I disagree that the outcome of this project will be negligible, but the point on things taking forever and constantly being opposed holds true for this project - the conclusion of which couldn't be more welcome for anyone who has to deal with the A34 into Oxford the morning (and more lately the Cutteslowe, Wolvercote and now Bicester/A41 roundabout 'upgrades')
 

jimm

Established Member
Joined
6 Apr 2012
Messages
5,276
ll this was caused by a local Liberal councillor who decided to make a name for himself .This part of Oxford is not exactly pretty being a typical suburb ,the logical development from this row will be new motorways laid with rubber not tarmac and put in tunnels so as to control the noise.Lets hope that trains will run as expected and undoubtedly some of the aggrieved residents will use them with ear defenders on!

If by 'this' you mean this latest wrangle over 'silent track', then no, it was not caused by a councillor.

'This' was caused by Network Rail making what the local (Conservative) MP said was a "clear commitment" to install the said track during a public meeting last year. Its installation then got written in by the city council as a condition of the planning approval as part of the aspects of the project that were delegated back to the council when the Transport and Works Act Order was approved following the public inquiry.

Yet again, someone seems determined to have a pop at just one of the parties represented on the city council (I take it you mean Liberal Democrats, as there are no Liberal councillors in Oxford) - even though there are all of eight of them on a council with 35 Labour members, four Greens and an independent.

This is a council where the Labour Party has been in overall control since May 2010 - ie before the public inquiry into the Chiltern plan even began, never mind the council getting involved in the details of things like sound barriers along the line.

Throughout this time, the west area planning committee has had a Labour majority - who tend not to be mesmerised into doing what the Lib Dems want, despite what some people appear to believe.

And the track between Oxford station and Aristotle Lane/Oxford North junction, where the council now appears to want yet more 'silent track' installed, lies entirely within two wards represented by Labour councillors...
--- old post above --- --- new post below ---
Observations today of work carried out at the weekend in Oxford:

The old Aristotle Lane pedestrian bridge span has been removed. Most of the new bridge is fitted together alongside the line but I assume the old abutments will need some work before it can be lifted into place.

Appears to have been some work on track around Oxford North junction as well, as there were various panels of track stacked nearby, plus a point to provide the new access into the down side carriage sidings, ie west of the main line just north of the station, has been installed but doesn't connect to anything yet.

The old GWR canopy at the north end of the station survives for the time being.
 
Last edited:

Mordac

Established Member
Joined
5 Mar 2016
Messages
2,386
Location
Birmingham
Track laying complete according to press release!

http://www.networkrailmediacentre.co.uk/news/oxford-to-marylebone-track-now-complete

Oxford to Marylebone track now complete

Wednesday 21 Sep 2016

Track now fully installed from Oxford city centre to London Marylebone.
Chiltern Railways services from Oxford city centre set to launch on 12 December 2016.
First new rail route between a major British city and London in over 100 years.



Network Rail engineers have finished laying new sections of track to connect Oxford city centre with London Marylebone - ahead of Chiltern Railways running services on the new line from December.

The final track installations were completed around Peartree and Wolvercote in Oxford. Network Rail’s ‘orange army’ engineers have transformed the old 20-40 mph branch line into a 100 mph main line.

The £320 million project, including an investment of £130 million from Chiltern Railways, was first conceived in 2002 and approved in 2013. The first section of the route opened from Oxford Parkway, a new station, in October 2015.

Once open, two trains per hour will run throughout the day from Oxford city centre to London Marylebone with journey times from around an hour. The new link introduces a useful alternative for people travelling between Oxford and London. Until now Paddington station has been their only London rail option.

Dave Penney, Managing Director at Chiltern Railways said: “With the track now laid from our new station Oxford Parkway through to Oxford city centre, we can look forward to the first trains running on 12 December. The new rail line will bring significant social, economic and environmental benefits to those living and working along the route and will be the completion of first new rail link between a major British city and London for over 100 years.”

Martin Frobisher, London North Western route managing director for Network Rail, said: "This important landmark in our nationwide Railway Upgrade Plan will offer a great new travel option not just for business and leisure passengers in Oxford going to London but also for those in London heading to Oxford. It will bring economic benefits to the Oxford region and with it new opportunities for people living there."
Contact information

Media Relations (London North Western route)
0121 345 3100
mediarelations@networkrail.co.uk
About Network Rail

Network Rail owns, manages and develops Britain's railway - the 20,000 miles of track, 40,000 bridges and viaducts and the thousands of signals, level crossings and stations (the largest of which we also run). In partnership with train operators we help people take more than 1.65bn journeys by rail every year and move hundreds of millions of tonnes of freight, saving almost 8m lorry journeys. We employ 36,000 people across Britain and work round-the-clock, each and every day, to provide a safe, reliable railway.
About the Railway Upgrade Plan

The Railway Upgrade Plan is Network Rail's investment plan for Britain's railways. It makes up two-thirds of Network Rail's £40bn spending priorities for the five years to 2019 and represents the biggest sustained programme of rail modernisation since the Victoria era. It is designed to provide more capacity, relieve crowding and respond to the tremendous growth Britain's railways continue to experience; passenger numbers have doubled in the past 20 years and are set to double again over the next 25 years - so we need to continue to invest in building a bigger, better railway. For passengers, that means:

longer, faster more frequent trains;
better, more reliable infrastructure; and
better facilities for passengers, especially at stations.

Follow us on Twitter: @networkrailPR
Visit our online newsroom: www.networkrailmediacentre.co.uk
Downloads
Railway connected. Oxford to Marylebone 2.

Railway connected. Oxford to Marylebone 2.

View | Download

Railway connected. Oxford to Marylebone.

Railway connected. Oxford to Marylebone.

View | Download
 

CyrusWuff

Established Member
Joined
20 May 2013
Messages
5,430
Location
London
Maybe even trains running over it too, as a neighbour told me he saw a Chiltern unit in the carriage sidings at Oxford late on Tuesday afternoon.

Looking on RTT, that appears to be a Driver training run that starts from Banbury.

Morning run (0959 ex-Banbury) is here and it stables in the Up Carriage Sidings from 1322 to 2111, getting back to Banbury at 2322. Evening run can be found here.
 

STEVIEBOY1

Established Member
Joined
31 Jul 2010
Messages
4,001
It is good this connection is done at last, but was there not already a service from Oxford to Islip and beyond already?
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,232
It is good this connection is done at last, but was there not already a service from Oxford to Islip and beyond already?

This has been a rebuilding of an existing single track line, the stretch between Oxford and Oxford Parkway has intentionally taken longer than the rest. It isn't a new connection, just re-worked.

The previous service just ran through Islip and terminated at Bicester Village (formerly Bicester Town), with a fairly sparse service. Both stations have been totally modernised with additional platforms for double track, and of course it is now a through route to Marylebone as well. (The latter being possible because of the only completely new railway, a double track linking chord at Bicester.)

--- old post above --- --- new post below ---

Looking on RTT, that appears to be a Driver training run that starts from Banbury.
...and it stables in the Up Carriage Sidings from 1322 to 2111, getting back to Banbury at 2322.

I understand from another forum that it isn't just stabled for that period, it spends time doing all the various shunt moves north and south of Oxford that will be needed for the trains that will use the through platforms, such as the LHCS.

I expect random short moves in and out of the various sidings either side of the station would not be planned so don't appear on RTT.
 
Last edited:

RPM

Established Member
Joined
24 Sep 2009
Messages
1,531
Location
Buckinghamshire
I understand from another forum that it isn't just stabled for that period, it spends time doing all the various shunt moves north and south of Oxford that will be needed for the trains that will use the through platforms, such as the LHCS.

I expect random short moves in and out of the various sidings either side of the station would not be planned so don't appear on RTT.

Yes that's correct. Chiltern drivers are using it to learn all the necessary shunt moves around Oxford station and into the reception roads at Hinksey yard, which will be used as turnback sidings.

The simulator at Aylesbury has also been set up for Oxford route learning.
 

HowardGWR

Established Member
Joined
30 Jan 2013
Messages
4,981
It is good this connection is done at last, but was there not already a service from Oxford to Islip and beyond already?

Following swt_passenger's helpful reply, the only really new railway is of course the spur east of Bicester Town (ex-LNWR) up to the ex-GW line. Without that, the scheme would not have been possible, although, interestingly, the proposed East-West scheme and proposed freight route would have needed the ex-LNWR line to be redoubled anyway.
 

Nicholas43

Member
Joined
16 Jun 2011
Messages
646
Location
Radley
The previous service just ran through Islip and terminated at Bicester Village (formerly Bicester Town), with a fairly sparse service.
And previous to that, there was a sparse service, on double track, to Bletchley, with some trains reversing at Bletchley and continuing to Cambridge. And previous to that, there were (I think) occasional through trains to Euston via Bletchley. Indeed, Oxford is still one of the destinations offered on the gate houses (now boozers) at Euston.
 

Andyjs247

Member
Joined
1 Jan 2011
Messages
734
Location
North Oxfordshire
Presumably the MOD traffic to Bicester COD will revert to running via Oxford shortly, if it hasn't done so already? It's rather a long way round from Didcot via Reading, Greenford and the Chiltern line otherwise. I guess the stone traffic to/from Banbury Road sidings will also come via Oxford if it comes direct from Whatley Quarry. Or if it runs as a trip from Acton then probably it will continue to run via Bicester.
 
Last edited:

alexx

Member
Joined
17 Sep 2015
Messages
95
Presumably the MOD traffic to Bicester COD will revert to running via Oxford shortly, if it hasn't done so already? It's rather a long way round from Didcot via Reading, Greenford and the Chiltern line otherwise. I guess the stone traffic to/from Banbury Road sidings will also come via Oxford if it comes direct from Whatley Quarry. Or if it runs as a trip from Acton then probably it will continue to run via Bicester.

I'd imagine even though the track is completed there's still a bit of work to do. A cursory glance through Opentraintimes doesn't show anything interesting until Sunday 11th December and the 0743 Oxford to Marylebone: http://www.opentraintimes.com/schedule/P20419/2016-12-11 - I'm guessing that's the first 'official' service?
 

TheKnightWho

Established Member
Joined
17 Oct 2012
Messages
3,183
Location
Oxford
I'd imagine even though the track is completed there's still a bit of work to do. A cursory glance through Opentraintimes doesn't show anything interesting until Sunday 11th December and the 0743 Oxford to Marylebone: http://www.opentraintimes.com/schedule/P20419/2016-12-11 - I'm guessing that's the first 'official' service?

Given it's scheduled to depart from the new platform at Oxford, they've got that to finish first!
 
Status