What are they doing at Oxford - still those ex-Mail bays at the north end?
That's what they have permission for, extending the two platforms southwards into space vacated by current staff facilities. The planning issues were all about the location and height of the replacement temporary building.
I don't think any of Chiltern's proposals prevent any likely future alterations to the main station, such as the bay on the opposite side of the up through platform presumably being earmarked for conversion to a through platform if needed.
I don't think that through platform on the up side was part of the main station improvements last time I saw a track diagram, it was only a long term 'might have'; the major changes were all on the down side.