Chiltern Oxford Link completed

Status
Not open for further replies.

Cherry_Picker

Established Member
Joined
18 Apr 2011
Messages
2,825
Location
Birmingham
So much of Bicester has built up around North station over the years that even relocating that to the new junction seems pointless for the time being. Maybe there might be an argument to build a station where the line splits one day but that day is decades away yet.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

HowardGWR

Established Member
Joined
30 Jan 2013
Messages
4,981
So much of Bicester has built up around North station over the years that even relocating that to the new junction seems pointless for the time being. Maybe there might be an argument to build a station where the line splits one day but that day is decades away yet.
Indeed I am afraid I dashed off my post before realising that the available changes are available elsewhere, already. It's just you see two lines cross and think 'squirrel'.
 
Last edited:

Andyjs247

Member
Joined
1 Jan 2011
Messages
734
Location
North Oxfordshire
An interchange station where the two lines cross wouldn't offer any new journey opportunities compared with changing in say Oxford. I believe it was considered at some point but had been rejected.

The main problem with building a station there is not so much the distance from the town centre per se but access (particularly now that the site is built up on three sides).

For example, the main facilities such as buildings and car parks would have to go south of the East West line. Recent developments on Launton Road (the road running roughly parallel to the line) ie the Wickes and Aldi stores plus new housing, make access to the railway difficult.

At one time I believe it was to planned for Gavray Drive to link up with Launton Road when it was built in about the 1980s. Even without the new developments it is difficult to see how or where you would put in a road bridge - in days gone by you might have got away with a level crossing but now that would be out of the question.

Suffice it to say a bridge didn't get built and thus it's a lengthy trek by road to get from the south side of the railway at that location to the town. The two existing stations are already well located; a single interchange station would create more problems than it solved.

By the way the first bit of double track is now in place at the London Road level crossing which reopened yesterday. The platform at the Town station has now been demolished and the stockpile of ballast seems to have grown. Things look to be progressing more rapidly now.
 

davetheguard

Established Member
Joined
10 Apr 2013
Messages
1,938
An interchange station where the two lines cross wouldn't offer any new journey opportunities compared with changing in say Oxford. I believe it was considered at some point but had been rejected.

The main problem with building a station there is not so much the distance from the town centre per se but access (particularly now that the site is built up on three sides).

For example, the main facilities such as buildings and car parks would have to go south of the East West line. Recent developments on Launton Road (the road running roughly parallel to the line) ie the Wickes and Aldi stores plus new housing, make access to the railway difficult.

At one time I believe it was to planned for Gavray Drive to link up with Launton Road when it was built in about the 1980s. Even without the new developments it is difficult to see how or where you would put in a road bridge - in days gone by you might have got away with a level crossing but now that would be out of the question.

Suffice it to say a bridge didn't get built and thus it's a lengthy trek by road to get from the south side of the railway at that location to the town. The two existing stations are already well located; a single interchange station would create more problems than it solved.

By the way the first bit of double track is now in place at the London Road level crossing which reopened yesterday. The platform at the Town station has now been demolished and the stockpile of ballast seems to have grown. Things look to be progressing more rapidly now.

Thanks for the update on things at Bicester Town.

By the way, do you know if Grayline coach & bus company are still occupying the area behind the (now demolished) platform, or have they been moved their premises out to another location?
 

Andyjs247

Member
Joined
1 Jan 2011
Messages
734
Location
North Oxfordshire
Thanks for the update on things at Bicester Town.

By the way, do you know if Grayline coach & bus company are still occupying the area behind the (now demolished) platform, or have they been moved their premises out to another location?

Yes Grayline are still there. They (and some of the other local business owners) are getting a bit anxious though as they haven't yet received compulsory purchase orders according to this article.
 

CyrusWuff

Established Member
Joined
20 May 2013
Messages
5,428
Location
London
Yes Grayline are still there. They (and some of the other local business owners) are getting a bit anxious though as they haven't yet received compulsory purchase orders according to this article.

I'm no expert, but I would have thought that it's in Network Rail's/Chiltern's interests to do as much work as possible within the existing boundary so as to minimise disruption to the businesses in question, rather than serve CPOs "early" and then do no work on site for a year or whatever.
 

jimm

Established Member
Joined
6 Apr 2012
Messages
5,274
I'm no expert, but I would have thought that it's in Network Rail's/Chiltern's interests to do as much work as possible within the existing boundary so as to minimise disruption to the businesses in question, rather than serve CPOs "early" and then do no work on site for a year or whatever.

It may be in Chiltern's interest, but not surprisingly the business owners would like to get on with sorting out their own futures, and I can't blame them for that, given how long they have already been waiting for this project to start.
 

MK Tom

Established Member
Joined
31 Aug 2011
Messages
2,456
Location
Milton Keynes
Not sure whose idea the swimming pool look was with this and Bicester Town. Looks terrible IMO.

I also think Oxford Parkway is a ootentially confusing name, and I'm very surprised they haven't made any reference to the station's proximity to Kidlington.
 

RPM

Established Member
Joined
24 Sep 2009
Messages
1,531
Location
Buckinghamshire
Certainly, of the two of them, I prefer the look of Bicester Town. This one is a little bit, well, ordinary.

There's very little on the frontage to suggest that it actually is a railway station, although I suppose it will get the obligatory NR totems that will do the job.
 

billio

Member
Joined
9 Feb 2012
Messages
575
Kidlington won't mean as much, Oxford in the name is a bigger draw.

Kidlington seems to lose out all the time, even Richard Branson decided he didn't want to be seen living there.

I expect we will see : Oxford Parkway, change here for London Oxford Airport !.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,229
Water Eaton Parkway was the original name (as used in the TWA application).

Maybe they'll also alter the name of the main Oxford station. Oxford Central perhaps?
 

Buttsy

Established Member
Joined
20 May 2011
Messages
1,374
Location
Hanborough
Water Eaton Parkway was the original name (as used in the TWA application).

Maybe they'll also alter the name of the main Oxford station. Oxford Central perhaps?

Should go back to its old name of Oxford General, Oxford Central would be a bit of a misnomer as it isn't that close to the centre of town. :D
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,634
It shouldn't change at all, there is no need to and it would be a waste of money. Considering the tediousness of the Birmingham International saga and the more recent Northampton Castle idea it is just solutions finding problems again.
 

RobLawrence

Member
Joined
13 Oct 2012
Messages
47
picture.php

Work well under way to replace the pedestrian level crossing with an accessible footbridge. The New Langford housing estate is to the right (West) of this shot which looks up the line - beyond the crane takes you to the chord itself.

picture.php

From the same vantage point (Tubbs Lane Crossing) this time looking down the line towards London Road level crossing. The vegetation has been substantially cut back and track bed replenished.

picture.php

From the London Road level crossing looking back up towards Tubbs Lane.

picture.php

And finally, from the London Road level crossing looking down to the old Bicester Town station platform and (ultimately!) Islip and Oxford Parkway. Keen-eyed viewers will spot the former platform indicator and the Greyline Coaches parked in the vicinity of the station car park.
 
Last edited:

jimm

Established Member
Joined
6 Apr 2012
Messages
5,274
The website about what work is going on has been given a makeover now and is being regularly updated.

http://www.bicestertooxfordcollaboration.com/

Looks like track will soon be reappearing on that section through Bicester, as from mid-May access to Banbury Road stone sidings will be from that direction to allow work on the formation from Water Eaton to Oxford to start. Also has a picture of the new stone sidings area being prepared to make room for the station.
 

Andyjs247

Member
Joined
1 Jan 2011
Messages
734
Location
North Oxfordshire
Here are some more photos taken on Monday evening showing the new accessible footbridge at Tubbs Crossing. It looks largely complete now apart for some work needed at the north side alongside Garth Park. It is quite an impressive structure (although I suspect some residents may be less impressed by the scale of it)!

Underneath the footbridge the first turnouts for Gavray Junction at the west end of the Bicester chord can be glimpsed. See also the next image.

More pointwork has arrived by road and is awaiting final delivery to site!

The next view is looking west towards Bicester town station. Note the lengths of welded rail ready to be installed.

Lastly the view from London Road crossing looking east towards Garth Park and Tubbs crossing. Freight trains will resume running here in two weeks time.
 

Attachments

  • IMG_1060.jpg
    IMG_1060.jpg
    211 KB · Views: 168
  • IMG_1061.jpg
    IMG_1061.jpg
    126.8 KB · Views: 134
  • IMG_1058.jpg
    IMG_1058.jpg
    218.7 KB · Views: 119
  • IMG_1062.jpg
    IMG_1062.jpg
    132.9 KB · Views: 128
  • IMG_1064.jpg
    IMG_1064.jpg
    179.4 KB · Views: 133

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,634
Judging by the height of the guard rails and enclosure of the bridge, I take it the good people of Bicester are not to be trusted there!!
 

NSEFAN

Established Member
Joined
17 Jun 2007
Messages
3,518
Location
Southampton
Is it a problem with throwing things at the trains, or is it to do with stopping people from jumping onto the (future) overhead wires?
 

Cherry_Picker

Established Member
Joined
18 Apr 2011
Messages
2,825
Location
Birmingham
Probably the latter. It wouldn't surprise me if it was a regulation that new structures have to adhere to. That ramp looks like it will take forever to walk up too!
 

MK Tom

Established Member
Joined
31 Aug 2011
Messages
2,456
Location
Milton Keynes
A footbridge with ramps that long should also have steps in addition, so people who don't need a ramp don't have to spend half an hour crossing it!
 

jopsuk

Veteran Member
Joined
13 May 2008
Messages
12,774
I may be wrong, but it looks on the right hand side of the photo like there may be steps there?

The ramp has to have a shallow gradient with regular flat bits to actually make it practical for people in unpowered wheelchairs to use it unaided. I'm assuming no one here wants to stop such people crossing the railway?
 

Andyjs247

Member
Joined
1 Jan 2011
Messages
734
Location
North Oxfordshire
I may be wrong, but it looks on the right hand side of the photo like there may be steps there?

The ramp has to have a shallow gradient with regular flat bits to actually make it practical for people in unpowered wheelchairs to use it unaided. I'm assuming no one here wants to stop such people crossing the railway?

The previous foot crossing is very busy and ramped access is definitely required.
Yes there will be steps also. Don't think they are in place yet though. To the south (RH) side the steps would be hidden from where the photo was taken. I have seen the plans but I can't remember whether the steps run from the top level or from part way down IYSWIM.

Previously the crossing itself was not lit but I imagine the new one will be.
 