Eagle
Established Member
It still remains to be seen what's going to happen to Quainton Road.
It still remains to be seen what's going to happen to Quainton Road.
Calvert is east of Bicester, so near the East West route, nothing to do with this Chiltern project.
Nothing to do with the Chiltern plans, as jimm has pointed out already.
Hmm, I see.
The reason I asked was because I had thought that the Chiltern Oxford plans involved running trains up the old London Extension beyond Aylesbury as far as Calvert, and then constructing a new chord to link onto the EWR line, before running through Bicester to Oxford.
As someone who's not terribly familiar with the railway geography of the area, can someone correct me on this?
In the past the railways themselves never rated the idea of Oxford-Aylesbury or Aylesbury-Bletchley services and the Great Central was built without any connection to the East West route. The south to east chord from Calvert to Claydon LNE junction was a 1940 emergency wartime connection and never had a regular passenger service, so Aylesbury-MK will be something new.
I'll have to disagree with that. There were several railway proposals in the 1800s linking Oxford and Aylesbury, the most famous one being the Brill Tramway.
Although not regular, BR ran Aylesbury - MK services in the 1980s for Christmas Shoppers.
But they never actually built a line, did they? Nor did the GC see fit to put in chords north of Calvert when the London extension was built.
The London Extension line from Annesley Junction to Quainton Road, crossed several railways over its 90+ mile length, yet there was only one junction to other railway companies, which was at Woodford & Hinton, which connected the GWR (via the GCR branch to Banbury) and the SMJR. Later on, there was also another junction on the Extension line at Grendon Underwood, for the GW/GC line to High Wycombe and London.
If you went via Aylesbury, the journey time to London would be horrendous and not competitive with the GW Oxford-London route and the scheme wouldn't be viable. In any case, much of the land that even a tight south to west chord at Calvert would need is in a nature reserve.
In the past the railways themselves never rated the idea of Oxford-Bicester-Aylesbury or Aylesbury-Bletchley services (a change at Verney Junction being the option that was available) and the Great Central was built without any connection to the East West route. The south to east chord from Calvert to Claydon LNE junction was a 1940 emergency wartime connection and never had a regular passenger service, so Aylesbury-Milton Keynes will be something new as well.
The Brill Tramway couldn't extend the line to Oxford, as they couldn't raise enough capital to fund the expensive tunnelling required from Brill to reach Oxford. As Eagle has stated the A&BR intended for through services to run between Aylesbury and Oxford on their line to Verney Junction but railway politics got in the way.
The GCR had little interest in short haul traffic on the London Extension railway when the line was planned and built. The point of the London Extension was to provide direct high speed link from the GCR's large network in the Midlands/North to London, reducing it's reliance on other railway companies to transport it's traffic to London (and the Channel ports).
The London Extension line from Annesley Junction to Quainton Road, crossed several railways over its 90+ mile length, yet there was only one junction to other railway companies, which was at Woodford & Hinton, which connected the GWR (via the GCR branch to Banbury) and the SMJR. Later on, there was also another junction on the Extension line at Grendon Underwood, for the GW/GC line to High Wycombe and London.
In the very early days I believe the LNW attempted to run an Oxford - Euston service via Bletchley but it was quite a lengthy route and not successful.
RobLawrence said:[my first RF post: hello!]
Those following developments may be interested to hear that this morning a (first) train load of spoil appeared to run from the site of the chord, through Bicester Town station and towards Oxford. I heard the locomotives arrive pre-0600 and the train departed between 0930 and 1000, involving a closure of the level crossing near Bicester Town station - much the surprise of many who use the road -- several of whom had never seen the barriers down previously!
The queues of traffic that built up on the adjacent roads in the 3 minute barrier closure were remarkable. Presumably this level crossing will remain operational once the Water Eaton to Marylebone service begins -- would that mean up to 4 closures per hour?
For those interested by such things, the locomotives were 66031 (Calvert end of the train) and 47727 (Oxford end of the train).
Barriers will be down for 20-25 mins an hour, possibly more, once E-W gets going I would suspect.
And the OW&W ran trains from Wolverhampton and Worcester to Euston via Yarnton and Bletchley for several years in the 1850s before it fell under GWR control.
Its not so good when the barriers are down for so long it impacts on emergency vehicles response time as is the case in West Sussex.I'm sure that will be welcomed.
In other towns and cities local authorities have to spend £ms to get that level of road calming in urban areas.
Its not so good when the barriers are down for so long it impacts on emergency vehicles response time as is the case in West Sussex.
Some of the West Coast way barriers are down for 5 trains at a time.
Not really going to make much of a difference in Bicester though is it? on average, how many times an hour does a "blue light" cross the level crossing at the moment?
Traffic calming in Oxford already adds 20 minutes to the Ambulance journey from the A40 to the John Radcliffe in the peaks...
Quite frankly, I wish they'd pedestrianise the whole bloody centre; emergency vehicles excepted.
It looks like there's enough room for an overbridge to my admittedly untrained eye, the Bicester Road just to the east crosses the line via an overbridge and is the same distance from the roundabout. I'm not a civil engineer though, and I'm also not sure how they'd get from the flat crossing to an overbridge without a prolonged closure.
Totally get that the crossing over the B4100 London Road isn't going anywhere.What will be more of a problem is when East West Rail opens, with the level crossing on the A4421 which is the main road round the town. Does anyone know how long the barriers are likely to be down there?