• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

chiltern Mk3 DVT generator vans.

Status
Not open for further replies.

Unclepete

Member
Joined
18 Oct 2011
Messages
76
Location
Newbury
That's the one. Set AL04 was the first silver set to be sent to Doncaster for the power doors to be fitted. Set AL01 is also at Doncaster. 82304 is still under test at Wembley and should be ready to go with a loco to pick up set AL04.


So I take it, the sets are staying silver/grey??
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

route:oxford

Established Member
Joined
1 Nov 2008
Messages
4,949
That's the one. Set AL04 was the first silver set to be sent to Doncaster for the power doors to be fitted. Set AL01 is also at Doncaster. 82304 is still under test at Wembley and should be ready to go with a loco to pick up set AL04.

Great

So any pics of the work in progress for AL04?

With the Christmas break and delivery due in January - they must be nearly complete (if some coaches aren't aready complete).
 

BestWestern

Established Member
Joined
6 Feb 2011
Messages
6,736
So are these going over to DOO when the doors have been fitted then, or the pointlessly complicated procedure of Guard buzzes Driver who shuts doors so Guard can check doors then buzz Driver to start train etc..... Can't see the RMT being overly impressed :|
 

ChrisCooper

Established Member
Joined
7 Sep 2005
Messages
1,787
Location
Loughborough
So are these going over to DOO when the doors have been fitted then, or the pointlessly complicated procedure of Guard buzzes Driver who shuts doors so Guard can check doors then buzz Driver to start train etc..... Can't see the RMT being overly impressed :|

From the looks of it it will be driver releasing doors, guard closing. This is becoming the standard proceedure these days, and is actually quicker as the driver can release the doors as soon as the train comes to a halt, wheras the guard can often be slightly delayed (either just reaction time, or actually getting to a door to release). Also allows manual SDO to be fitted, wheras with guard operated doors automatic SDO is needed which is slower.
 

4SRKT

Established Member
Joined
9 Jan 2009
Messages
4,409
Why do they need a genny van when the skips are ETH-fitted?

These plug doors on the mk IIIs, I suppose you can't lean out of the window on them.
 

BestWestern

Established Member
Joined
6 Feb 2011
Messages
6,736
From the looks of it it will be driver releasing doors, guard closing. This is becoming the standard proceedure these days, and is actually quicker as the driver can release the doors as soon as the train comes to a halt, wheras the guard can often be slightly delayed (either just reaction time, or actually getting to a door to release). Also allows manual SDO to be fitted, wheras with guard operated doors automatic SDO is needed which is slower.

It's quicker on the release, but dodges a standard safety procedure of powered door stock. One of the primary reasons for the delay on Guard-operated stock is the Guard opening his 'local' door and checking that the train is platformed correctly, which safeguards against a stop-short and helps ensure that the doors are released on the correct side. A Driver sitting in a warm comfy cab is far more likely to release doors in error in these circumstances, but it appears this is another short-cut our modern railway is happy to take :|

We also have the marvellously convoluted Voyager method of dispatch, whereby the Guard has to press a button to tell the Driver to press another button to close the doors, despite the Guard being the one who is actually responsible for the doors but actually having no direct control over them. Hmm... :roll:
 

t_star2001uk

Member
Joined
23 Aug 2011
Messages
724
Are there any layovers long enough for that?

During the normal weekday timetable the 2 silver sets (AL03, AL05) will stable in the sidings at Birmingham Moor Street and the Banbury commuter set (AL02) stables in the cattle road at Banbury. So to ruduce the amount of noise complaints and the amount of fuel used by having a 67 running with the HEP switched on for cleaning and train prep, we will use the generator which will not only provide hotel power for the train but will also provide air as well.
 

junglejames

Established Member
Joined
8 Dec 2010
Messages
2,069
These plug doors on the mk IIIs, I suppose you can't lean out of the window on them.

Unfortunately I am guessing you are right.
May be the way forward these power doors, and at least it keeps them in service for longer, but for me it makes them a lot worse. Why does a modern touch have to ruin things?!!!!
 

Pumbaa

Established Member
Joined
19 Feb 2008
Messages
5,022
Unfortunately I am guessing you are right.
May be the way forward these power doors, and at least it keeps them in service for longer, but for me it makes them a lot worse. Why does a modern touch have to ruin things?!!!!

Yes he is right. The windows were almost triangular used on the trial doors, so assuming they've not changed that much, they still will be. Look very smart but the whole door is replaced. Certainly no drop-light!
 

Rhydgaled

Established Member
Joined
25 Nov 2010
Messages
4,856
Yes he is right. The windows were almost triangular used on the trial doors, so assuming they've not changed that much, they still will be. Look very smart but the whole door is replaced. Certainly no drop-light!
Would it be possible to make a power door with a drop-light? I suppose since the railways doesn't like passengers sticking their heads out of windows anymore there wouldn't be any point in one anyway.
 

Pumbaa

Established Member
Joined
19 Feb 2008
Messages
5,022
I doubt it heavily - there is no need as the doors are automatic, and they are thin.
 

jopsuk

Veteran Member
Joined
13 May 2008
Messages
12,774
Would it be possible to make a power door with a drop-light? I suppose since the railways doesn't like passengers sticking their heads out of windows anymore there wouldn't be any point in one anyway.
Well quite. Absolutely no need; whilst the risk is small from drop lights it is real so might as well eliminate it.
 

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
20,281
Would it be possible to make a power door with a drop-light? I suppose since the railways doesn't like passengers sticking their heads out of windows anymore there wouldn't be any point in one anyway.

Cl442/5WES units have such a droplight IIRC, I believe to provide ventilation should the air conditioning break down, or simply because the door panel was a standard SR part, them being insanely frugal.
 

Hydro

Established Member
Joined
5 Mar 2007
Messages
2,204
Droplights are extra maintenance, people leave them open, letting in draughts and water, they leak and let the draught in easily enough as it is.
 

williamn

Established Member
Joined
22 May 2008
Messages
1,659
The 442s have opening windows in their doors but they're locked shut.
 

Peter Mugridge

Veteran Member
Joined
8 Apr 2010
Messages
17,804
Location
Epsom
They're for emergency use by the guards only, though I have seen people open them with the lid of a biro in the past!:roll:
 

asylumxl

Established Member
Joined
12 Feb 2009
Messages
4,260
Location
Hiding in your shadow
There was a photo in Rail magazine a few months back (quite a few months back I think), but I don't think anyone has posted it online.
 

Unclepete

Member
Joined
18 Oct 2011
Messages
76
Location
Newbury
That's the one. Set AL04 was the first silver set to be sent to Doncaster for the power doors to be fitted. Set AL01 is also at Doncaster. 82304 is still under test at Wembley and should be ready to go with a loco to pick up set AL04.

Do we have a release date yet for set AL04??:D
 
Status
Not open for further replies.

Top