Until the 11 car pendos come on line yes...
11 car pendo is longer than a 12 car 450 or 350
Unless of course you count Eurostar
...and the Scottish Sleepers are something like 15 vehicles or so.
Lowland is usually 17 vehicles (loco + 2 seated + 2 lounge + 12 beds, no DVT); I forget how long the Highland one is (it doesn't split evenly).
373/1s are 20 vehicles (technically two 10s in multiple).
I could be wrong but I think the Chiltern mixed livery set has 7 carriages now, so 9 in total
The silver ones are 2+5
The seated cars for the Fort William portion don't run from Euston though, only the 2/3 sleeping cars do. They're essentially a portion of the Aberdeen rake in the Highland Sleeper as far as Edinburgh, so that the formations of both the lowland and highland sleepers on the WCML is the same.The highland sleeper is 4 carriages to Fort William and 6 apiece to Aberdeen and Inverness so also 16 carriages, 17 with loco.
The Banbury set is 7 carriages + Loco & DVT now mate.
They have an ets rating of 66, I would imagine that would be the limiting factor rather than the length of the train. They can happily haul a 12 carriage emu and barriers as seen during the decommissioning of the Mark 1 3rd rail emu fleets.
Is that coming close to the max that the 67 can deal with and maintain timetabling?
(And is the full 7+2 accommodated by the plaforms en-route?)
I would imagine so, though I haven't driven it. Dwell times are still the biggest problem with slam door stock though. As for the platforms? Most "mainline" platforms between Snow Hill and Marylebone can accommodate 8 cars as a result of Evergreen 2, so 7+2 isnt a problem if the stop board is in the right place. The Banbury set has the same stops in both directions; Banbury (obviously) Bicester North, Haddenham & Thame, Princes Risborough and Marylebone which are all fine. There was a stop order on the 18:13 for High Wycombe last week following the cancellation of another train in the evening peak, it was announced at Marylebone but was withdrawn almost immediately as the down platform hasnt been cleared for that length of train. I think you could squeeze in with the DVT hanging over at the back or with a stop board beyond the end of the platform (which would present a problem if the signal at the end of the platform was at danger) but I wouldnt put my house on it.
You could indeed T+T with two 67s, both providing power, would be fun to see just how long they'd be willing to go, considering SDO is easy enough on Mk3s.
Interesting, I wasn't aware they were sticking extras on, I bet they are at the limit of keeping a 168 path with that. A 12 car would never do it, let alone have the platform space anyway.
presumably with the AAR MW controls, if the DVT was replaced with a second 67 they could top & tail with both locos being used (like the 27s on the Edinburgh-Glasgow or for that matter an HST)? Talking theoretical in technical terms, not saying this is a sensible operational idea...
Will the "mixed" rake be refurbished and upgraded in the same way as the silver rakes?
I have no doubt that a 67 could haul a 12-car train but would it be able to accelerate quick enough to keep up with the present timetable?
They have an ets rating of 66, I would imagine that would be the limiting factor rather than the length of the train. They can happily haul a 12 carriage emu and barriers as seen during the decommissioning of the Mark 1 3rd rail emu fleets. They also haul 10+ Mk 2s on charters.
Indeed there are, originally built for the Manchester Pullman (and other similar WCML services) along with the Mark 3B FOs to replace the mark 2s that had been employed on those duties since new in the late sixties.Doh, forgot about the lack of mrk3 brake coaches- there's only the three used by the Night Riviera, aren't there?
Wrexham ran without a Mk3 brake for a good while when it was top and tail so it is not a show stopper...Doh, forgot about the lack of mrk3 brake coaches- there's only the three used by the Night Riviera, aren't there?
I don't think hydro would like the idea of tow 67's together. The rails might explode :/Could always double head it with two 67s![]()
I don't think hydro would like the idea of tow 67's together. The rails might explode :/
It would have no chance