I can't see anything better than just putting the wires up. This is a mainline at capacity, not a rural line with a train every 2 hours!
Won't electrification bring positive change to property prices? Electrification means cleaner air and quieter trains, which are definitely positives.
Ain't gonna happen, no matter how much you, I or anyone else thinks it should. NR can't even get the full electrification of the Western finished, let alone start a brand new scheme.
== Doublepost prevention - post automatically merged: ==
The line speed of Chiltern doesn't need the big ugly masts and cantilever's, just simple poles. Modern standard electrification in Europe uses these for speeds upto 180km/h (112mph), Some countries eg Italy use factory made standard lattice poles which are much cheaper than multiple designs made in short production runs.
These are much higher speeds than Chiltern uses in the urban areas. Although some multi-track areas might need spans. The only fast bits which need heavyweight kit are within about 15 miles either side of Banbury which is very rural.
Not sure how you work that out. The Chiltern main line is 100mph just south of Wembley with only a few PSRs further north in the Heartlands due to the nature of the infrastructure (eg 60mph through High Wycombe).
== Doublepost prevention - post automatically merged: ==
What other options are the? The cheapo innovative 165 attempt was a complete disaster. Has it actually been put back together yet? And the expensive 168 OEM supplier proper attempt has been deemed as too expensive despite actually working.
I'd be interested to see your evidence of the Class 168 hybrid 'actually working'.
== Doublepost prevention - post automatically merged: ==
168329 is, as I'm sure you know, being converted back to normal and I can see this returning to service, especially given Chiltern need every 168 they can use! The 165 I think is still at Doncaster. I believe it finished its conversion but unsure what is actually happening to it. But like you say if it returns to service I'll be pretty surprised! But another unit definitely isn't bad for Chiltern to have in their fleet, but Christmas tree unit wouldn't be useless either!
168329 is currently at Aylesbury for the time being, 165004 did not get fully converted to Hybrid operation before the plug was pulled.