I assumed it would be based on a non-express platform, or are they all roughly the same anyway?Given that Hitachi already have the 80x platform, I see no particular reason they couldn't easily do one with a 24m vehicle (already the plan for the MML), a blunter nose (perhaps with the AT200 gangway) and 110mph top speed.
I think it would have to be gangwayed for Waterloo - when its busy there is an awful lot of walking down the train looking for seats (until you get to the door that wont open and go "ah, bother, guess we are standing")
What are the Marylebone trains like - is the last unit utterly rammed with the last minute arrivals who dont have time to walk down the platform?