Chesterfield, platform 3

Status
Not open for further replies.
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Joined
30 Jun 2009
Messages
1,133
Location
Nottinghamshire
Ill be passing on Monday, just thought id see if anyone had any info?

Last time I passed they had just taken away the old Network Rail building and there was some marking laid out on the ground.
 

4SRKT

Established Member
Joined
9 Jan 2009
Messages
4,409
Why do they need a third platform at Chesterfield?
 

ashworth

Established Member
Joined
10 Sep 2008
Messages
1,285
Location
Notts
Why do they need a third platform at Chesterfield?

I'm not 100% sure whether I'm right but I think it is mainly because of the increased number of trains that now use the section of line between Clay Cross and Sheffield since the introduction of Northerns hourly Nottingham-Leeds service and even more so since EMT increased their London-Sheffield service to 2 trains per hour.

One of the Sheffield-London trains currently is unable to stop at Chesterfield and I heard that platform 3 will enable it to do so.
One XC service in each direction an hour passes through without stopping and I think platform 3 may also be to allow this to pass slower stopping trains with less delays.
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,661
:lol::lol::lol: excellent, that would knacker the job entirely. Its a bi -di platform in the plans.
 

tbtc

Veteran Member
Joined
16 Dec 2008
Messages
18,052
Location
Reston City Centre
Am passing through tomorrow morning; will have a look out :)

They were working on it today, mainly cordoned off, but the "frame" of the platform is in place.

Will be good once its finished, as the Chesterfield - Sheffield traffic has increased from three trains an hour over the last decade to six an hour (twice the service to London from last December, twice the service to Nottingham since Northern started their "Leeds" service and twice the service to Birmingham when the Voyagers came to Cross Country)

Just a shame there's no more capacity going in to Sheffield yet.
 

talltim

Established Member
Joined
17 Jan 2010
Messages
2,454
The metal platform frame and back fence is looking pretty complete but I suspect that it still needs surfacing and a lot of other work that isn't obvious to the untrained eye.
 

CFC1866

New Member
Joined
3 Mar 2010
Messages
1
Does anyone have any info on how long the platform will be? Can you fit a 7 car 222's on there? Or is it only big enough for 2x158's or 5 car 222's?
 

talltim

Established Member
Joined
17 Jan 2010
Messages
2,454
Its difficult to tell for certain, becaus the new platform is mainly to the south of the existing ones, but I would say it is HST/9 Car Meridian /Voyager length
Alternativly, you could say its been built for years ;)
 
Last edited:
Joined
30 Jun 2009
Messages
1,133
Location
Nottinghamshire
I have just been through Chesterfield and the entire platform sub frame is in, and I would say half of it has its final platform surface on, the entire length has the back fence fitted to.

I would say that it is a hell of a long way from the end of platform 3 back to the main station buildings, looking good for being done on time though.

There was a class 66 in the platform with some ballast wagons around 16.45 today too.
 

button_boxer

Established Member
Joined
12 Nov 2009
Messages
1,271
I would say that it is a hell of a long way from the end of platform 3 back to the main station buildings, looking good for being done on time though.

I don't know what the plans are for which services will use platform 3, but presumably it'll mostly (entirely?) be Nottingham ones, none of which are more than about 4 cars long. Given that there's plenty of space I guess it's been built long as the marginal cost of building it for 12+ cars over building it for (say) 5 would be relatively insignificant, certainly compared to the cost of extending it in years to come.
 

omnibologist

Member
Joined
13 Jul 2010
Messages
11
Location
Great Longstone
the platform structure looks very similar to the slow line platforms at East Midlands Parkway and not at all temporary
 
Last edited:

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,257
There are pictures of the completed platform in the NR press release linked to in the other Chesterfield thread in 'general discussion'. It will only be used when needed during engineering works and barriered off normally...
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,661
There are pictures of the completed platform in the NR press release linked to in the other Chesterfield thread in 'general discussion'. It will only be used when needed during engineering works and barriered off normally...

What a waste of cash then, that could be utilised so much more.
 

Rustyrails01

New Member
Joined
5 Aug 2010
Messages
2
The new platform should be used for a new link between Chesterfield and the Robin Hood line. Using current frieght lines and disused lines in north east Derbyshire. New stations could be created for Staveley, Clowne and, maybe, Bolsover.
 