"Checkmate situation" meaning?

Status
Not open for further replies.

Kilopylae

Member
Joined
9 Jan 2018
Messages
1,068
Location
Uxbridge (ex Devon)
Hi all. Last Sunday (14th December) my friend was on a delayed train from Reading (ex Paddington) to Exeter. He says the guard told all passengers that they couldn't hold the last train out of Exeter to Barnstaple, because it "creates a checkmate situation at Crediton".

I have no idea what this could mean. I am local to the area, so I know the trains pass to exchange tokens at Crediton. My best guess is that perhaps the driver from Barnstaple to Exeter is nearing the end of the maximum hours she can work, so if she has to wait at Crediton for the train which is being held, she might run out of hours, leaving herself and the train stranded? But that's total conjecture.

Can anyone shed any light on what the guard might have meant by "checkmate situation" here?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

LYradial

Member
Joined
8 Jun 2024
Messages
321
Location
welsh marches
Stalemate would have been a better word, they could have held the exeter bound train at Crediton but when you got there a Quick Look on realtime trains suggests there were three other Exeter bound trains all occupying the single track waiting to pass at crediton so you could have got no further without delaying them considerably
 

Falcon1200

Established Member
Joined
14 Jun 2021
Messages
6,520
Location
Neilston, East Renfrewshire
'Mexican standoff' was the term we used in Glasgow Control. Not a common occurrence but I recall one such event on the then-new Borders Railway when, during disruption, we ended up with several trains stopped at various locations resulting in a deadlock. IIRC one had to return to Tweedbank to get things moving.
 

norbitonflyer

Established Member
Joined
24 Mar 2020
Messages
5,677
Location
SW London
Didn't something similar happen at Mill Hill east in the early days of automated running? A train left Finchley Cebtral for the branch and got so far before the moving block detected a train ahead. But it was a train on the branch, waiting to leave the single track section.

I don't remeber the details, or how it was resolved. .
 

AndrewE

Established Member
Joined
9 Nov 2015
Messages
7,321
Only an anecdote, I admit, but (when working in Bath Rd depot in 1974) I was told that in the very early days of the Bristol Panel/Power Signal Box 2 locos came face to face either side of a signal on the single track between Bristol W Jct and N Somerset Jct!
 

bramling

Veteran Member
Joined
5 Mar 2012
Messages
20,347
Location
Hertfordshire / Teesdale
Didn't something similar happen at Mill Hill east in the early days of automated running? A train left Finchley Cebtral for the branch and got so far before the moving block detected a train ahead. But it was a train on the branch, waiting to leave the single track section.

I don't remeber the details, or how it was resolved. .

Yes it did. The system as originally designed would allow two (or more) trains on the branch, even though the second would never be able to reach Mill Hill. However it would throw up an “Override automatic hold?” message, which would have to be responded with a yes in order for the second train to be routed. The signaller concerned chose the yes option without it dawning on him what the implication would be. The situation was entirely safe as all trains were fully supervised and protected by the signalling at all times, but clearly inconvenient, and scary for the drivers no doubt as they wouldn’t have been aware that the new system allowed this to happen. It was resolved simply be routing the second train back to Finchley Central, again all fully signalled. The system was modified in a subsequent software drop to prevent this happening, and the signaller IIRC got quite a telling off about it.
 

brad465

Veteran Member
Joined
11 Aug 2010
Messages
11,414
Location
Taunton or Kent
I'd be surprised if this situation hasn't happened of the West of England line before: the route is prone to disruption and has the absolute minimum in passing points, to the point that reduced timetables have had to be introduced in extreme weather impacts.
 

Kilopylae

Member
Joined
9 Jan 2018
Messages
1,068
Location
Uxbridge (ex Devon)
The system as originally designed would allow two (or more) trains on the branch
Why? Is there a sensible reason why this would ever be a good idea? - my best incomplete guess is that if a train developed a fault at Finchley and needed to be emptied out it could go into the branch briefly to let another train past?
 

Kite159

Veteran Member
Joined
27 Jan 2014
Messages
22,730
Location
West of Andover
I'd be surprised if this situation hasn't happened of the West of England line before: the route is prone to disruption and has the absolute minimum in passing points, to the point that reduced timetables have had to be introduced in extreme weather impacts.
It has, especially in the Gillingham area
 

bramling

Veteran Member
Joined
5 Mar 2012
Messages
20,347
Location
Hertfordshire / Teesdale
Why? Is there a sensible reason why this would ever be a good idea? - my best incomplete guess is that if a train developed a fault at Finchley and needed to be emptied out it could go into the branch briefly to let another train past?

I don’t really know the answer to the question, but I *suspect* it lies in the fact that the system is designed primarily by software engineers rather than railway operators. Seltrac is an inherently fully bi-directional system, allegedly LU had to actually have this feature removed to suit their way of operation, so really this was just a relic of the “off the shelf” product that was left in.

There are exceptions to everything however, and one a day a year or two ago they actually had three trains on the Mill Hill branch, possibly for the first time ever. A 12-car train needed to be refuged somewhere so Mill Hill was chosen as the least disruptive option. As LU don’t generally like pulling defective trains, it was arranged for the 12-car to arrive at Mill Hill on top of a further train, with the 12-car being uncoupled and the defective train then coupled to the other 6-car so it could be pushed back to depot. As it happened, it was all somewhat academic as the defective train actually had full motors and braking so wouldn’t have been being pushed anyway. In this instance it was all done by unsignalled moves.
 