• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Charing Cross

Pegpilot

Member
Joined
26 Mar 2020
Messages
114
Location
Northants
Interesting news piece on the BBC news website this evening about the Army taking over Ch X station for a command post exercise this week, with Auntie claiming that Ch X is disused. I really should know the answer, as I was involved in the performance aspects of CBTC design way back in 2010, I can't remember whether and how comprehensively Ch X was signaled on the new system. Presumably it was wired up sufficiently to turn back a viable service if the eastern end of the Jubilee is down ? Albeit they'd need to tip out off one platform at Green Park, which presumably becomes the primary capacity constraint ?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

bluegoblin7

Established Member
Joined
10 May 2011
Messages
2,110
Location
JB
Yes, Charing Cross is fully signalled - including the overrun tunnels - with full ATO available throughout. The key factor would indeed be detrainment time at Green Park, as well as changing ends at Charing Cross. In theory a ‘full’ service could be supported, with some delay, although in practice the service would be suitably thinned out if this scenario was to occur, accounting for train crew reliefs at Stratford.
 

Trackman

Established Member
Joined
28 Feb 2013
Messages
4,246
Location
Lewisham
Was something to do with the UK and NATO, I read it the other day.
Plenty of good photos

British troops train for war with Russia from the London Undergroundn. In the scenario, the year is 2030 and the troops are part of a UK-led NATO headquarters that has rapidly deployed to Estonia after Russian troops attacked the Baltic states in the opening salvo of what could become World War Three.

http://news.sky.com/story/british-t...h-russia-from-the-london-underground-13546909

Wargame: Troops fight Russia from London Underground







British soldiers are fighting a Russian invasion from a platform on the London Underground in a wargame that reveals the UK must invest much more in defence - or risk defeat.
In the scenario, the year is 2030, and the troops are part of a UK-led NATO headquarters that has rapidly deployed to Estonia after Russian troops attacked the Baltic states in the opening salvo of what could become World War Three.

The British forces and their allies, including soldiers from the United States, have turned a disused part of Charing Cross Tube station into a makeshift underground base that they are imagining is in the Estonian capital of Tallinn.
It is an example of how civilian infrastructure can be requisitioned for military use in a time of war.
Troops in Charing Cross. Pic: MoD

Image: Troops in Charing Cross. Pic: MoD

Pic: MoD

Image: Pic: MoD
From here, they hunch over laptops and study large screens, drawing on Artificial Intelligence and other forms of digital technology to help identify Russian targets at speed, before launching swarms of drones, missiles and jamming equipment to destroy them.
The battle seems to go well - but the troops are relying on computer codes that are not yet integrated across the British military and weapons that have not yet been bought.
Commanders do not even know if the government will give them the billions of extra pounds in funding that they are understood to need to purchase this kit in sufficient volume.



In the wargame, the UK-led side must field more than 5,000 drones daily - both for attacking and surveillance - to stand a chance against a Russian force that is battle-hardened and resilient after years spent fighting against Ukraine.
Many of the drones would be single-use, requiring vast stocks of additional aircraft to replenish the frontline and an industrial base that can generate hundreds of thousands more.

This is something the Ukrainian military and its industry partners are doing today for real.

Pictures from the underground station. Pic: MoD

Image: Pictures from the underground station. Pic: MoD

By contrast, however, it is understood that the British army right now would only be able to deploy hundreds of drones a day - and even that tempo could not be sustained for long because its stockpiles are so small and production lines across UK industry are yet to be geared up for the scale of manufacturing that would be required in a real war.
Lieutenant General Mike Elviss, commander of the Allied Rapid Reaction Corps (ARRC) - the name of the UK-led NATO headquarters involved in the exercise - articulated the challenge in a video message that was played to Sky News and a group of other journalists that was invited to watch some of the simulation at Charing Cross station on Wednesday.
"The scenario you are about to see is very deliberately set in 2030 because that is where we see the threat from Russia to be at its most acute," he said.
"It's also when we could realistically deliver the modernised technology and increased readiness required to meet that threat, but only with the right investment now, and with the support of industry to build a national arsenal, not just of munitions stockpiles - although that's critical - but also of the national means of production that can scale in wartime.
"There is huge opportunity here, but peril if we ignore the risk."

A failure by Sir Keir Starmer's government to finalise a major investment plan for defence - that should have been published last autumn - has already hampered the ability of the army, Royal Navy and Royal Air Force to rearm at the pace that many believe is necessary.
John Healey, the defence secretary, said this week that the Defence Investment Plan would be out soon.
But its publication is only part of the challenge.
Read more from Sky News:
Growing signs of strain inside Russia
RAF aircraft dangerously intercepted by Russian jets

The Treasury is reportedly expected to agree to give the Ministry of Defence an additional £18bn over the next four years to help fund the rearmament, but that sum of money is far short of what the military requires to be ready for a potential war with Russia by 2030.

A multi-national command post has been deployed at Charing Cross underground station. Pic: MoD

Image: A multi-national command post has been deployed at Charing Cross underground station. Pic: MoD
Before accessing a disused platform on the London Underground via a steep flight of stairs in between two frozen escalators, the group of visiting journalists at Charing Cross station was shown a pretend television news report entitled "World At War".
A mock on-screen presenter set the scene, describing how Russian troops have just attacked Estonia, Latvia and Lithuania.
The invasion prompted NATO allies to trigger Article 5 - the alliance's founding principle, which means an attack on one member state is deemed to be an attack on all.
UK forces in the ARRC have moved to Estonia from where the headquarters, which would comprise some 500 personnel from more than 20 allied nations if deployed for real, is tasked with commanding a Corps of up to 100,000 troops from across NATO.
In the exercise, just over 100 military personnel are spread out along a train platform in both directions and across the inside space that connects them - a familiar setting for anyone who has ever been on the London Underground but a very unusual place to find soldiers.
Such a location is ideal for a military headquarters, though, because it is buried deep underground, making it hard for Russia to locate and destroy.
 

Dave W

Member
Joined
27 Sep 2019
Messages
874
Location
North London
Fascinating logistical challenge - clearly an engineering train brought the equipment in - where best to get this on to the network? Stanmore? Perhaps nearer RAF Northolt?

Is that crane always in situ at ChX? Or was it specially put in for the exercise?
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,589
Location
Nottingham
Fascinating logistical challenge - clearly an engineering train brought the equipment in - where best to get this on to the network? Stanmore? Perhaps nearer RAF Northolt?

Is that crane always in situ at ChX? Or was it specially put in for the exercise?
The engineering trains are based at Ruislip which is pretty close to Norholt. They can access any part of the network via various connections between lines. I guess they'd use the exit from the depot onto the Uxbridge branch then switch to the Jubilee somewhere between Wembley Park and Finchley Road.
 

bluegoblin7

Established Member
Joined
10 May 2011
Messages
2,110
Location
JB
To be fair, IanVisits is only regurgitating the British Army's press release - but yes, equipment was loaded at Ruislip.

The train then ran along the Met line to Neasden where it recessed in the depot for a period, before transferring to the Jubilee line and running directly to Charing Cross.
 

Top