Was watching the Green Signals podcast where Richard Bowker was looking around Charing Cross. I seem to recall that an engineer said that they had reduced the number of point ends from (I think) 18 to 16. Has the layout changed slightly; anyone know?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,589
Location
Nottingham
Was watching the Green Signals podcast where Richard Bowker was looking around Charing Cross. I seem to recall that an engineer said that they had reduced the number of point ends from (I think) 18 to 16. Has the layout changed slightly; anyone know?
Switch diamonds changed to fixed, otherwise no change.
 