This is why there are many photographs of trains at Paddington with a main line loco facing the "wrong" way at the buffers, outwards, with a train ahead of it. A loco for a main line departure would be used to bring in a previous ECS from Old Oak, facing outwards, tender first, and would sit as such on the stops until it departed, when it would move around to the head of its own main line train. This saved various light loco movements, and indeed saved a number of pilot locos.At peak times (Paddington at least) big engines were needed to move ECS before/after main line jobs and it avoided light loco moves too. In fact, light locos were barred at the GE’s London end in the peaks.
Liverpool Lime Street in the 1960s was notable for a similar approach, where an outbound York express, still being hauled by a Jubilee, would have the stock brought in from sidings by a 25kV electric loco, which would later haul its own Euston train, the stock of which in turn was brought in by a Jinty 0-6-0T tank. The electric loco was maybe unable to heat the York train until the Jubilee came on, and relied on residual heat from the static heat installation at Edge Hill, whereas the Jinty steam heated the London train until the main loco came on and started electric heat.