Another, much cheaper alternative would be to reverse SWR trains at Riverside and construct a new link between the lines across open fields instead, thus:Fingers crossed they just build the two platforms for 10 coach trains and run through Waterloo stuff via the Windsor Link. That's the single best use of the Branch and best for the folk in Windsor, and enables redevelopment of Central.
An alternative proposal for the Windsor area to extend SWR services to Slough without major town centre development. A new more rural link between Eton and Slough with trains reversing at Windsor and Eton Riverside station. Allows viaduct route into Windsor Central to be converted to high quality active transport corridor.

I think that those ‘open fields’ are the playing fields of Eton. Are you willing to take that lot on?Another, much cheaper alternative would be to reverse SWR trains at Riverside and construct a new link between the lines across open fields instead, thus:
It’s also very unrealistic.I think that those ‘open fields’ are the playing fields of Eton. Are you willing to take that lot on?
Yes that might work. A steep descent from Riverside on my alignment dipping under the river and B3022 (Slough Road), then climbing back up to the GWR branch. Two long platforms at Slough would be nice but one and a refuge siding for emergencies would be adequate.It’s also very unrealistic.
It will be a one-bore through tunnel, no doubt; opening out to two track on the old two-track section and then potentially just terminating in one platform as the two-track section will act as a dynamic loop.
I don't see that happening.
In the medium term it'll remain a 165 operated shuttle from Slough.
Maybe in 10 years time it'll be replaced with new build stock.
I've often mused that a high capacity Chalvey park and ride station, just off the M4, for both Windsor and Slough could make some sense, especially with a high-frequency service, again favouring the automated shuttle concept. Could even provide a large coach park to help remove much of the tour traffic from central Windsor.Wouldn't opening a station with a passing loop at Chalvey Road be the cheapest way to do this?
Fingers crossed they just build the two platforms for 10 coach trains and run through Waterloo stuff via the Windsor Link. That's the single best use of the Branch and best for the folk in Windsor, and enables redevelopment of Central.
Electrifying it would be fairly cheap, and then an Electrostar could be used. Might even make sense to dedicate one and give it more of a standee type layout and a special livery.
But cheaper than a 165??
I'm not convinced the branch is broken at all tbh. Might just be best left as isI don’t think beyond new stock there’s much you can do with the Windsor branch, in an ideal world it would be a CrossRail branch but this is not possible.
The 165s are thirty years old so they could go one for another ten years at least.
I’ve heard of a crazy scheme to build a tunnel under Windsor to link the two Windsor lines together as the Windsor link
I'm not convinced the branch is broken at all tbh. Might just be best left as is
I don't think the branch shuttle is fundamentally broken, and I don't think it needs any significant change, but I do believe a change of rolling stock to something brighter and greener is worthwhile, as much for image as anything else in such a prominent, tourist facing role, and batteries would seem practical in this case, so perhaps D-Trainz, great for fast boarding with its multiplicity of doors as well as representing reuse/upcycling and as any other buzzwords that can be attached! The Elizabeth Line, once fully operational, will undoubtedly bring more traffic to the branch. It might also be worth considering adding a Chalvey Park and Ride scheme, which doesn't really change the operational concept.I agree it should be left as it is
I don't think the branch shuttle is fundamentally broken, and I don't think it needs any significant change, but I do believe a change of rolling stock to something brighter and greener is worthwhile, as much for image as anything else in such a prominent, tourist facing role, and batteries would seem practical in this case, so perhaps D-Trainz, great for fast boarding with its multiplicity of doors as well as representing reuse/upcycling and as any other buzzwords that can be attached! The Elizabeth Line, once fully operational, will undoubtedly bring more traffic to the branch. It might also be worth considering adding a Chalvey Park and Ride scheme, which doesn't really change the operational concept.
You know it’s strange how many people would rather go via Waterloo than Paddington then a change at Slough.
I’ve told a few people to use Paddington instead because it’s much quicker to Windsor than the Waterloo line is.
So your point on buzzwords made me think on really promoting the Windsor-Slough branch as the best link between London and Windsor.
A battery operated train would be most welcome, some lines don’t need electrification now and this line is one of them, hopefully we’ll see a replacement on the 165s in the next few years
A battery operated train would be most welcome, some lines don’t need electrification now and this line is one of them
It would seem the very worst kind of microfleet to have to have something so specific for Marlow. Measuring on Google Earth, it looks like there is about 75 metres from the buffers to the points. Would it really be impossible to make some track alignment changes sufficient to be able to fit a 4 car 387 in the bay? It looks to me that it would not be impossible, especially if you were to sacrifice the 2nd platform, which would not be useful after making these changes. Slightly off topic perhaps, but not really, as it would make complete sense to have a unified solution for all the branches, rather than bespoke for each.It would be incredibly cheap to electrify it (cheaper than Windermere as it's much shorter) so I can't see any case not to, same with the other Thames Valley branches. The only one posing a real challenge is Marlow due to the layout of Bourne End, though I wonder if a 3-section electric-only FLIRT might fit the platform?
It would seem the very worst kind of microfleet to have to have something so specific for Marlow. Measuring on Google Earth, it looks like there is about 75 metres from the buffers to the points. Would it really be impossible to make some track alignment changes sufficient to be able to fit a 4 car 387 in the bay? It looks to me that it would not be impossible, especially if you were to sacrifice the 2nd platform, which would not be useful after making these changes. Slightly off topic perhaps, but not really, as it would make complete sense to have a unified solution for all the branches, rather than bespoke for each.
It would be incredibly cheap to electrify it (cheaper than Windermere as it's much shorter) so I can't see any case not to, same with the other Thames Valley branches. The only one posing a real challenge is Marlow due to the layout of Bourne End, though I wonder if a 3-section electric-only FLIRT might fit the platform?
Whilst the journey time London - Windsor is quicker from Paddington, surely it's also a question of how long it takes to get from your destination to Paddington instead of Waterloo ? If it takes another 15 mins to get to Paddington, then that gap is much reduced.
If you're coming into most of the Southern termini then Waterloo will be closer / quicker to get to, same for Fenchurch St and Liverpool St. Euston's probably 50/50 because it's a trek to Euston Sq, whereas the Northern Line is direct to Waterloo.
If you remove the second platform then the peak time service is cut in half
The second platform isn't the problem, it's the junction points for Marlow - the curve is already very tight.It would seem the very worst kind of microfleet to have to have something so specific for Marlow. Measuring on Google Earth, it looks like there is about 75 metres from the buffers to the points. Would it really be impossible to make some track alignment changes sufficient to be able to fit a 4 car 387 in the bay? It looks to me that it would not be impossible, especially if you were to sacrifice the 2nd platform, which would not be useful after making these changes.
Interesting thought - you'd have to cut a couple of minutes off the running time thence to Marlow to make it work.Yes - that's the problem. Though I wonder if reinstating the second platform at Cookham would work or a Penryn style loop ?

The second platform isn't the problem, it's the junction points for Marlow - the curve is already very tight.
A two car D-train would fit easily at Bourne End in either platform, possibly a 3-car with some realignment associated with replacing the crossover with a scissors for a two train 30 minute interval service. Although Bourne End is closer to the Marlow end trains can pass there by adjusting terminal layover between the extremities I think.Only one of Bourne End's two platforms has access to the Marlow branch - and it's the short one. Somebody suggested dropping it to one platform, but that won't work unless you want to drop the peak frequency to hourly (because B - End is the passing place) or you move the passing place to Cookham.
Looking at Google earth you *might just* be able to reconfigure it so there's one platform (the southern one) which accesses the Marlow branch *and* has enough platform for a 4 car EMU, but it's tight. And to maintain the 30 min off peak frequency you'd have to move the passing place to somewhere else.
Wire up the Windsor bay at Slough (OLE gantries are already over the track), fit a pan up/down balise. A battery Electrostar (or other BEMU) could then recharge via the OLE during the 10 minute layover in the bay.