Not sure if this is the right place to ask but does anyone know how long it’s meant to last and how long it would take for direct Glasgow to Euston services to resume (I.e. not diverted via Kilmarnock)
There are full 48 hour blocks of all lines on weekends from March 4th right through to the end of May.Not sure if this is the right place to ask but does anyone know how long it’s meant to last...
weekdays until March 17th: limited Glasgow to Carlisle shuttles via Kilmarnock.and how long it would take for direct Glasgow to Euston services to resume (I.e. not diverted via Kilmarnock)
weekdays from March 20th to April 14th: Glasgow to Euston services resume (via Midcalder Junction)
How would that work would services turn around there?
How long should a complete remodelling take?The timings for this are ridiculous - how can they justify decimating the WCML for months?
Anneka Rice would have had it all done and dusted in a couple of days!How long should a complete remodelling take?
Trains will leave Glasgow in exactly the same formation as they arrived into Glasgow as there is no way of turning a train there.Trains will have to leave Glasgow the wrong way round, so that when they reverse at Midcalder, they'll be back in correct formation.
What option is there?The timings for this are ridiculous - how can they justify decimating the WCML for months?
How would you do it?The timings for this are ridiculous - how can they justify decimating the WCML for months?
Sustain with the current scheme? Are the improvements from the work really going to make much of a difference? As it is the WCML is a mess so what does improving the Carstairs Junction actually offer?What option is there?
Yes, it makes a big difference, line speed increases, performance and reliability increases. To say you cannot disrupt a major artery to do major works is utter nonsense. Explain why the WCML is a mess apart from TOC issues? The fact its one of the most intensively used lines means it gets knackered!Sustain with the current scheme? Are the improvements from the work really going to make much of a difference? As it is the WCML is a mess so what does improving the Carstairs Junction actually offer?
It should simply not be on the table to effectively disript the WCML for such extended periods. It is the most important rail artery in the country and should be kept open in all but the most dire circumstances.
Sustain with the current scheme?
As it is the WCML is a mess so what does improving the Carstairs Junction actually offer?
With no disrespect to Scotland, the bit of the WCML that is the “most important rail artery in the country” is not the bit north of Carlisle. Think passenger figures might suggest otherwise even for the three Scottish cross-border routes. Clearly GSWR is in third place….It should simply not be on the table to effectively disript the WCML for such extended periods. It is the most important rail artery in the country and should be kept open in all but the most dire circumstances.
I am sure in passenger you are correct, but it really just shows the contempt the north is treated with IMHO. It is a major railway artery out of Scotland's biggest city and there is this lazy fare attitude of its fine to close or disrupt it for months. Totally unacceptable.With no disrespect to Scotland, the bit of the WCML that is the “most important rail artery in the country” is not the bit north of Carlisle. Think passenger figures might suggest otherwise even for the three Scottish cross-border routes. Clearly GSWR is in third place….
I just wondering what the Carstairs improvements will actually add other than months of misery. A marginally faster journey over a few (?) miles on an already late Avanti 390 that has been throttled in speed due to inadequate infrastructure and had countless delays already.
Not answering the questions posed though.I am sure in passenger you are correct, but it really just shows the contempt the north is treated with IMHO. It is a major railway artery out of Scotland's biggest city and there is this lazy fare attitude of its fine to close or disrupt it for months. Totally unacceptable.
Clearly it is going to be disruptive, but it is not as if there is no rail alternative. Real contempt would be shown by doing nothing on the principle that ‘it was good enough for 1974….”I am sure in passenger you are correct, but it really just shows the contempt the north is treated with IMHO. It is a major railway artery out of Scotland's biggest city and there is this lazy fare attitude of its fine to close or disrupt it for months. Totally unacceptable.
Perhaps I'm missing something, but surely all the diagrams starting from Polmadie in a morningIt won't matter so much for services that come in from the south, as they'll be reverse at Glasgow but back in normal formation after Carstairs. It's the ones that start at Polmadie (on the first day of diversions) that could end up reverse formation at Euston.
due to inadequate infrastructure and had countless delays already.
No you're right, it'll only be for the first day or two if the sets haven't been turned beforehand.Perhaps I'm missing something, but surely all the diagrams starting from Polmadie in a morning
will have worked up from Euston (reversing at Midcalder) the previous evening, so nothing can
possibly be 'the wrong way round' after the first day or two?
MARK
that's 'laissez-faire'this lazy fare attitude
Well, at least I got one good reply Fat fingers, mobile, age, rushed posting and autocorrect conspired against me.that's 'laissez-faire'
So we should stick with the terrible infrastructure that keeps failing then? Or we should somehow replace tracks without closing them to traffic?Seriously though, for all the replies, the end result is the same, massive disruption and advice to effectively not use the railway. Fail.