swt_passenger
Veteran Member
- Joined
- 7 Apr 2010
- Messages
- 34,308
Very interesting perspectives. Thank you all. So if something needed to be done in the short term and it can't be train frequency. Is it number of carriages and extending the so called "peak hour earlier in morning later in evening. And offer a ticket price incentive for not travelling at the peak hour??
It's an increased number of carriages up to 12 car length on most, if not all, remaining mainline services - those that can still be strengthened above 4 or 8 cars. This is all part of the overall result of the 707 fleet arriving. Basically you've got an extra 30 five car trains that will displace the same number of 458/5s onto routes mainly operated by 450s. Those 450s become available elsewhere, a few will replace 456s on Ascot - Guildfords but the majority will end up on 'mainline' routes.