• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Cancelled Trains

Status
Not open for further replies.

jamesst

Established Member
Joined
4 May 2011
Messages
1,369
Location
Merseyside
Not sure if this is posted in the correct part but here goes...
When a train is cancelled mid journey how are the platform information boards/ announcements at stations further along the trains intended route updated to reflect this? Or is this done in conjunction with the signalling?
Also if the train was due to pass from one signal boxes control to another is it just updated automatically or as simple as a phone call?
Hope this makes sense!
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

rail-britain

Established Member
Joined
12 Aug 2007
Messages
4,102
The expected time simply shows cancelled
Once the departure time has passed the train no longer shows
 

ainsworth74

Forum Staff
Staff Member
Global Moderator
Joined
16 Nov 2009
Messages
31,066
Location
Redcar
The expected time simply shows cancelled
Once the departure time has passed the train no longer shows

I think they meant what method is used to update the boards to show cancelled not how the information is conveyed to passengers :|
 

Cherry_Picker

Established Member
Joined
18 Apr 2011
Messages
2,825
Location
Birmingham
For the second part of your question, usually a phonecall or a pager message in my experience. I would presume that some kind of priority email gets used these days too, though I havent seen that myself.
 

tirphil

Member
Joined
27 Jan 2011
Messages
275
Location
Wales
Alterations to services, capes (cancellations), pines (service terminating mid journey) used to be 'wired out' with the instruction 'walnut rede' (inform all concerned) at the bottom. As someone else has said, probably email now, and possibily not with the old railway terminology either.

And wires weren't always issued by control. A yardmaster could issue a wire stating 'byrag' (booked traffic only) and a 'gosling' (all traffic by prior arrangement only) depending on freight traffic flows. A flurry of telephone calls between yards affected, control and TOPS usually followed!
 

causton

Established Member
Joined
4 Aug 2010
Messages
5,504
Location
Somewhere between WY372 and MV7
Alterations to services, capes (cancellations), pines (service terminating mid journey) used to be 'wired out' with the instruction 'walnut rede' (inform all concerned) at the bottom. As someone else has said, probably email now, and possibily not with the old railway terminology either.

I believe 'capes' and 'pines' are still used today - seen it in railway documents recently - but never heard of the 'walnut rede'! :P
 

Cherry_Picker

Established Member
Joined
18 Apr 2011
Messages
2,825
Location
Birmingham
"Caped" is a term which is definitely still in everyday use, as is "cape it" when somebody is giving the instruction to cancel a train. I doubt very much it gets used in email or on pager messages, but in radio and and face to face.
 
Last edited:

mailbyrail

Member
Joined
23 Dec 2010
Messages
395
A great conversation overheard recently between two traincrew in a public coach saying they had been delayed the previous day having to stop to knock a cripple out.
I don't think some of the other passengers realised that customer relations could sink to such a low level, they certainly didn't understand the actual meaning!!
 

Marton

Member
Joined
9 Nov 2008
Messages
665
Or at Wakefield Kirkgate, it's announced anyway and a completely different service turns up :lol:

Just like at Middlesbrough where trains are usually announced after they have left and the next one arrived.

Always sad to see someone on the Esk Valley/Nunthorpe services who wants to go to Hartlepool, Darlo or Saltburn.
 

es373

Member
Joined
19 May 2011
Messages
468
Location
London
And for LUL, the dot matrix systems are set up via the signalling computer with appropriate diagram.
 

CliveJones

Member
Joined
17 Feb 2011
Messages
104
Not sure if this is posted in the correct part but here goes...
When a train is cancelled mid journey how are the platform information boards/ announcements at stations further along the trains intended route updated to reflect this? Or is this done in conjunction with the signalling?

It probably varies from area to area. In the case of London Midland stations in the Birmingham area for example, alterations are fed into the CIS system (which controls the announcements and screens) via a computer interface in the Control Room. Control also send an email to relevant stations to inform the staff. They will also set the display to "Delayed" if a train is stuck to avoid the problem of incremental delays.
 
Status
Not open for further replies.

Top