This authorisation is for the placing in service of the following:
• A new station (Cambridge South) comprising four platforms, east and west station buildings and concourses
• A new AfA footbridge with lifts and second step only passenger footbridge
• Provision of 1000 cycle parking spaces
• Taxi rank and pick-up/drop off area
Excluded from this Stage 1 APIS application are the PRM accessible parking bays and staff parking bays on the east side of the station.
And above all, the brackets are most likely to be asymmetric, which means the screens physically cannot be flipped. The rotation will be in software as you say.Screen hardware will be mounted a certain way up due to cable routing etc. The rotation of the display will be a simple config change in the software, they don't need to go and physically turn them around.
Great to see the APIS letter.ORR Letter now Published for Cambridge South and associated infrastructure: https://www.orr.gov.uk/sites/defaul...dge-south-authorisation-letter-2026-06-18.pdf
I can understand using Chromium and a web app to some extent, the 700s use Firefox on some sort of custom Linux distro and a web app, and I've only ever seen a Firefox error page on one of those once. But using Windows...They're almost certainly (stupidly) running Windows and the displays are just essentially websites running on a Chromium-based browser. This is how the new Blackbox departure boards work at Norwich and Ipswich. They tend to run out of memory and crash, displaying the generic "Aw snap!" screen, and have an improperly-sized font after rebooting. Lovely pieces of kit.
As for flipping them, that's probably the one benefit of using Windows here.
So good they named it twice.Was passing through the biomedical campus earlier in the week - didn’t have time to go up to the bridge but I got this photo of the new RA2 double arrows station sign!
Lol - That's a great sign!So good they named it twice.
There are no despatch staff - it's all DOO. There are no CD/RA facilities. All trains that will call there have on-board cameras etc so there is also no mirrors or DOO cameras etc on the station as they were not needed.Anyone know whether it will be self dispatch or whether trains will be dispatched? Cambridge North was cd/ra when built however the majority of trains there now have cameras for self dispatch
Passengers will be able to travel to and from a new multimillion-pound railway station this weekend.
Cambridge South opens to the public on Sunday and is expected to welcome 1.8m passengers annually.
Here is everything you need to know about the station.
Whereas I remember that building being constructed, It is on the site of the old Station Hotel.I only moved to Cambridge in 2008, so I don’t know that low-rise building or the clock diagonally opposite the station in that photo
I think it was demolished some time around 2018.I don’t know that low-rise building or the clock diagonally opposite the station in that photo - I only remember it being a building site.
I'm sure the late Colin Rosenstiel, a long-serving Liberal/Lib Dem councillor in Cambridge and a great railway enthusiast would have been pleased to see this development.I like that Network SouthEast Addenbrooke’s station sign mock-up from the early 1990s! Outside Cambridge station - I only moved to Cambridge in 2008, so I don’t know that low-rise building or the clock diagonally opposite the station in that photo - I only remember it being a building site. Interesting to see that Number 3 bus in the background, too, specifically route-branded with the Rail Station and City Centre on it.
I read somewhere there is a GBR brandedWill the first train be GBR branded?
Nope. No GN Trains are GBR livered afaik. Nor any of the other operators' (in the region) stock.Will the first train be GBR branded?
What were you doing there at 4am?I’ve already arrived at the station, but there doesn’t seem to be anyone here yet.
On a Sunday too!!What were you doing there at 4am?![]()
Passenger number 1! Congrats!I’ve already arrived at the station, but there doesn’t seem to be anyone here yet.
Crazy. I’d still be in a late bar then.On a Sunday too!!
I was there to be the first passenger at the station! Going to station openings is something I’ve started doing since the Elizabeth line inauguration, and with the exceptions of Inverness Airport, Newsham and Beaulieu Park, I have managed to go to every new station opening in the UK since then.What were you doing there at 4am?![]()