Not a good day for the railway today. First off, 97303 was supposed to be visiting TnT with 304 on the 1Q13 Derby RTC to Aberystwyth & Mach, except 303's ERTMS played up again at Shrewsbury, so it had to be ripped off. 302 was started up on Coleham, but wasn't attached, and was eventually shut down. 303 toddled off back to Derby l/e so 304 took the train up on its own. It left Salop some 90 min late:
http://www.flickr.com/photos/welsh_snapper/5852508645/in/photostream
Just after it passed me it slammed on the anchors and came to a stop just where the curve enters the Forden straight. It sat there for a while before setting off at a slow speed. Not that it would've made much impact on the timetable, as things went from bad to worse. Some pole of some sort caught fire somewhere between Newtown and Talerddig I think, thus stuffing up pretty much everything from roughly mid-day onwards. The 1G35 was very late leaving Mach and finally got into Salop some 75 late and was terminated there. Plaid Cymru AM Elin Jones was on board and wasn't impressed that she missed her Cardiff connection. She's now calling for the hourly service to be introduced on the Cambrian. The 1Q13 is now about 180min late on is schedule, apparently
On related ERTMS news, we've heard that some Cambrian drivers are applying for transfer away from the Cambrian as they're fed up of the delays caused by ERTMS.
Richard
http://www.flickr.com/photos/welsh_snapper/5852508645/in/photostream
Just after it passed me it slammed on the anchors and came to a stop just where the curve enters the Forden straight. It sat there for a while before setting off at a slow speed. Not that it would've made much impact on the timetable, as things went from bad to worse. Some pole of some sort caught fire somewhere between Newtown and Talerddig I think, thus stuffing up pretty much everything from roughly mid-day onwards. The 1G35 was very late leaving Mach and finally got into Salop some 75 late and was terminated there. Plaid Cymru AM Elin Jones was on board and wasn't impressed that she missed her Cardiff connection. She's now calling for the hourly service to be introduced on the Cambrian. The 1Q13 is now about 180min late on is schedule, apparently
On related ERTMS news, we've heard that some Cambrian drivers are applying for transfer away from the Cambrian as they're fed up of the delays caused by ERTMS.
Richard