Location in question: https://maps.app.goo.gl/VZvSiHrKcN1751Yo6
No; The bottom speed on the sign - the one with the bigger number - is for passenger trains/ECS/light engine etc trains; the upper speed is for all other trains, mostly freight.
Yes, as the Cambrian uses km/h
Conflicting answers here, I'll assume that AlterEgo misunderstood that I mean one is MPH and one is KMH. I meant to ask if it is both a differential sign and a KMH sign (based on the black background with white text).

Is there a reason the Cambrian line uses KMH (and is it historic)? I'm uneducated on how train services operate in this area (well, Wales as a whole).
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

hexagon789

Veteran Member
Joined
2 Sep 2016
Messages
18,301
Location
Glasgow
Split from: https://www.railforums.co.uk/threads/examples-of-unique-level-crossings.286409
Location in question: https://maps.app.goo.gl/VZvSiHrKcN1751Yo6


Conflicting answers here, I'll assume that AlterEgo misunderstood that I mean one is MPH and one is KMH. I meant to ask if it is both a differential sign and a KMH sign (based on the black background with white text).

Is there a reason the Cambrian line uses KMH (and is it historic)? I'm uneducated on how train services operate in this area (well, Wales as a whole).
The Cambrian was chosen as a testbed for ERTMS (ETCS Level 2) in cab signalling, it works in km/h rather than mph.

The speed restrictions on the line were converted to km/h, a 60mph limit became 95km/h for instance.

Although speeds are ordinarily displayed continuously to the driver using an in-cab display integrated with the speedometer, for occasions where the in-cab display is unavailable there are speed signs in certain locations - otherwise the default degraded working speed is only 40km/h (25mph).
 

saismee

Established Member
Joined
20 Oct 2023
Messages
1,708
Location
UK
The Cambrian was chosen as a testbed for ERTMS (ETCS Level 2) in cab signalling
What differences (and benefits) does ERTMS have over level 1 ETCS?
It works in km/h rather than mph.

The speed restrictions on the line were converted to km/h, a 60mph limit became 95km/h for instance.
This makes sense, I assume ETCS uses KMH because it's more common in other parts of Europe. Are the KMH speed restriction boards also in other parts of the UK with ETCS (ECML, for example)?

How does it inter-operate with other lines, does any service swap from KMH to MPH limits partway along its route?
 

hexagon789

Veteran Member
Joined
2 Sep 2016
Messages
18,301
Location
Glasgow
What differences (and benefits) does ERTMS have over level 1 ETCS?
I understand Level 1 does spot data transmission (fixed location only); Level 2 offers continous data transmission.

This makes sense, I assume ETCS uses KMH because it's more common in other parts of Europe. Are the KMH speed restriction boards also in other parts of the UK with ETCS (ECML, for example)?
The parts of the Tyne & Wear Metro shared with Network Rail have dual km/h / mph signage as T&W uses km/h.

Not sure what the ECML South installation is like, I've not seen much detail I'm afraid.

How does it inter-operate with other lines, does any service swap from KMH to MPH limits partway along its route?
The 158s units presently used do operate non-ERTMS equipped routes/services as I'm sure the batch of 197s so fitted will equally do so.

Presently, many of the Cambrian services extend beyond the length of the route itself, some as far as Birmingham, so they will transition from metric to imperial speeds mid-journey or vice-versa.
 

Sorcerer

Established Member
Joined
20 May 2022
Messages
2,062
Location
Liverpool
What differences (and benefits) does ERTMS have over level 1 ETCS?
ETCS is merely a part of the ERTMS wider package. But in short ETCS Level 1 is the first stage that is integrated with existing colour-light signals and balise ramps and still relies on them for movement authority, and communication is more intermittent as a result, so capacity is less than ETCS Level 2 which doesn't need lineside signals and uses radio communication for movement authorities via GSM-R (part of the ERTMS package). As well as allowing removal of the lineside signals it also allows for higher speeds, more track capacity, and if building from scratch provides more flexibility in track design.
 

saismee

Established Member
Joined
20 Oct 2023
Messages
1,708
Location
UK
Thank you both for the information, I've learnt a lot today.
 

Harpo

Established Member
Joined
21 Aug 2024
Messages
3,806
Location
Newport
Presently, many of the Cambrian services extend beyond the length of the route itself, some as far as Birmingham, so they will transition from metric to imperial speeds mid-journey or vice-versa.
I believe the speedo automatically recalibrates around Sutton Bridge.
 

godfreycomplex

Established Member
Joined
23 Jun 2016
Messages
1,751
I understand Level 1 does spot data transmission (fixed location only); Level 2 offers continous data transmission.
Correct. Level 2 can be overlaid with signals or just with marker boards, as on the Cambrian.
Not sure what the ECML South installation is like, I've not seen much detail I'm afraid.
Speeds displayed in miles on there - the system works on kilometers and is translated by the train’s on board equipment into miles to display to the driver
 

hexagon789

Veteran Member
Joined
2 Sep 2016
Messages
18,301
Location
Glasgow
Speeds displayed in miles on there - the system works on kilometers and is translated by the train’s on board equipment into miles to display to the driver
Thank you, presumably the existing limits are still used, so a 115mph limit would be translated into km/h for the ETCS then back to 115mph for display and adherence to by a driver?

(It doesn't use odd "metricated mph" like the Crossrail core for instance.)
 

godfreycomplex

Established Member
Joined
23 Jun 2016
Messages
1,751
Thank you, presumably the existing limits are still used, so a 115mph limit would be translated into km/h for the ETCS then back to 115mph for display and adherence to by a driver?

(It doesn't use odd "metricated mph" like the Crossrail core for instance.)
Correct
 

godfreycomplex

Established Member
Joined
23 Jun 2016
Messages
1,751
Thanks, that resolves something I've been curious about for a while but not yet seen clarified properly - there were plenty of suggestions, some given as fact actually, that the ETCS installation would be fully metric.
That was the way it was initially going to go, but the juice wasn’t considered worth the squeeze, so to speak
 

tfw756rider

On Moderation
Joined
30 Nov 2024
Messages
1,950
Location
Wales (sometimes in England), thanks for replying!
Presently, many of the Cambrian services extend beyond the length of the route itself, some as far as Birmingham, so they will transition from metric to imperial speeds mid-journey or vice-versa.
Don't all the Cambrian services that extend beyond the Cambrian itself extend as far as Birmingham, with the only exception being (for example) early-terminating services to e.g. Wolverhampton if there are part-cancellations or line closures etc.?
 

hexagon789

Veteran Member
Joined
2 Sep 2016
Messages
18,301
Location
Glasgow
Don't all the Cambrian services that extend beyond the Cambrian itself extend as far as Birmingham, with the only exception being (for example) early-terminating services to e.g. Wolverhampton if there are part-cancellations or line closures etc.?
I wasn't too sure to be honest, so limited myself to saying that some went to Birmingham - that seemed safer!
 

Breadface

Member
Joined
9 Sep 2019
Messages
25
Location
Aberystwyth
Don't all the Cambrian services that extend beyond the Cambrian itself extend as far as Birmingham, with the only exception being (for example) early-terminating services to e.g. Wolverhampton if there are part-cancellations or line closures etc.?
You've got the extra even hour departures from Aberystwyth that go only as far as Shrewsbury.
 

tfw756rider

On Moderation
Joined
30 Nov 2024
Messages
1,950
Location
Wales (sometimes in England), thanks for replying!
I wasn't too sure to be honest, so limited myself to saying that some went to Birmingham - that seemed safer!
Fair enough :) From Aberystwyth on a weekday for example, there are 5 "internal" Shrewsbury trains per day (the two earliest trains are such trains), 7 "extended" Birmingham International trains, and then 4 "internal" Machynlleth evening trains.

I think there are some trains between Machynlleth and Pwllheli that don't directly connect with the "main line" trains as well (like an hour's wait), so those of course are "internal" trains.

== Doublepost prevention - post automatically merged: ==

You've got the extra even hour departures from Aberystwyth that go only as far as Shrewsbury.
Yes, but you're misunderstanding the point, which is that there are normally no trains from Aberystwyth (for example) with destinations between Shrewsbury and Birmingham, such as Aberystwyth to Telford trains or Aberystwyth to Wolverhampton trains.
 

Sheridan

Member
Joined
11 Jan 2012
Messages
617
Fair enough :) From Aberystwyth on a weekday for example, there are 5 "internal" Shrewsbury trains per day (the two earliest trains are such trains), 7 "extended" Birmingham International trains, and then 4 "internal" Machynlleth evening trains.

I think there are some trains between Machynlleth and Pwllheli that don't directly connect with the "main line" trains as well (like an hour's wait), so those of course are "internal" trains.

== Doublepost prevention - post automatically merged: ==


Yes, but you're misunderstanding the point, which is that there are normally no trains from Aberystwyth (for example) with destinations between Shrewsbury and Birmingham, such as Aberystwyth to Telford trains or Aberystwyth to Wolverhampton trains.
I think even travelling as far as Shrewsbury means that they’ve gone beyond ‘the Cambrian itself’ in many people’s eyes - it begins at Sutton Bridge Junction to all intents and purposes:
 

tfw756rider

On Moderation
Joined
30 Nov 2024
Messages
1,950
Location
Wales (sometimes in England), thanks for replying!
I think even travelling as far as Shrewsbury means that they’ve gone beyond ‘the Cambrian itself’ in many people’s eyes - it begins at Sutton Bridge Junction to all intents and purposes:
In terms of "internal" vs "extended" Cambrian Line services, the ones starting/finishing at Shrewsbury are considered "internal" because, (not counting the small section of track from Sutton Bridge Junction to Shrewsbury railway station, which I doubt many people think causes these "normal" Cambrian Line services starting/finishing at Shrewsbury to be "extended"), they don't use other "actual" lines like the Shrewsbury-Wolverhampton line and a section of West Coast Main Line, like the Cambrian Line's only actual "extended" (Birmingham) services do.