Travelling on the Cambrian Coast line a few days ago I happened to notice this sign just outside one of the stations (possibly Harlech).it was positioned at a height suitable for the driver to operate. So, having not seen one before, I am curious to know its purpose - is it a means of operating a level crossing?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

godfreycomplex

Established Member
Joined
23 Jun 2016
Messages
1,749
Travelling on the Cambrian Coast line a few days ago I happened to notice this sign just outside one of the stations (possibly Harlech).it was positioned at a height suitable for the driver to operate. So, having not seen one before, I am curious to know its purpose - is it a means of operating a level crossing?
It is indeed
 

Wilts Wanderer

Established Member
Joined
21 Nov 2016
Messages
3,199
There used to be a pull chain at Barmouth as well. A similar arrangement exists at Eggesford on the Barnstaple branch I think?
 

Gloster

Veteran Member
Joined
4 Sep 2020
Messages
12,940
Location
Up the creek
If this is the arrangement that I think it is, I have a recollection that there used to be a similar arrangement on the Colne Branch, possibly at Chaffers. Unfortunately, the locals used to amuse themselves by smearing unpleasant substances on it just where the driver would place his hand, so I believe that there were plans to remove it.
 

Haywain

Veteran Member
Joined
3 Feb 2013
Messages
24,480
Thanks for the answers, much appreciated and curiosity satisfied!
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,630
If this is the arrangement that I think it is, I have a recollection that there used to be a similar arrangement on the Colne Branch, possibly at Chaffers. Unfortunately, the locals used to amuse themselves by smearing unpleasant substances on it just where the driver would place his hand, so I believe that there were plans to remove it.
Dog Sh*t crossing. Its been sorted now.
 

Harpo

Established Member
Joined
21 Aug 2024
Messages
3,733
Location
Newport
I’d noticed signs on both Portmadog and Barmouth platforms instructing drivers to wait until the MA is extended before operating the crossing, suggesting they’re not interlocked.
 

Haywain

Veteran Member
Joined
3 Feb 2013
Messages
24,480
I’d noticed signs on both Portmadog and Barmouth platforms instructing drivers to wait until the MA is extended before operating the crossing, suggesting they’re not interlocked.
The MA?
 

Haywain

Veteran Member
Joined
3 Feb 2013
Messages
24,480
I’d noticed signs on both Portmadog and Barmouth platforms instructing drivers to wait until the MA is extended before operating the crossing, suggesting they’re not interlocked.
That would suggest to me that it's to make sure they don't operate the crossing too soon (if that's what you mean, I apologise).
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,589
Location
Nottingham
That would suggest to me that it's to make sure they don't operate the crossing too soon (if that's what you mean, I apologise).
Probably both correct. If the MA was interlocked so it required the crossing to be operated, then the crossing would have to be operated first. But it makes sense to establish that the train has permission to proceed before trying to stop road traffic.
 

Elecman

Established Member
Joined
31 Dec 2013
Messages
3,567
Location
Lancashire
If this is the arrangement that I think it is, I have a recollection that there used to be a similar arrangement on the Colne Branch, possibly at Chaffers. Unfortunately, the locals used to amuse themselves by smearing unpleasant substances on it just where the driver would place his hand, so I believe that there were plans to remove it.
Correct it was Chaffers
 

godfreycomplex

Established Member
Joined
23 Jun 2016
Messages
1,749
Probably both correct. If the MA was interlocked so it required the crossing to be operated, then the crossing would have to be operated first. But it makes sense to establish that the train has permission to proceed before trying to stop road traffic.
All correct - those crossings are classified as TCO (Train Crew Operated) and therefore aren’t interlocked with any signalling (and haven’t been since RETB was introduced)
 