Absolutely, but that applies to all formationsAnd a compatible coupler and ETS so that's a 73 in the consist I assume.
Absolutely, but that applies to all formationsAnd a compatible coupler and ETS so that's a 73 in the consist I assume.
It has generally been lower numbered 66s which have operated the Inverness sleeper, but that may be a function of how GBRf generally manage them. It seems unlikely that a 66/6 will appear.One more question. Can any GBRF class 66 work the Highland sleeper portions, or only certain locos?
It isn't unknown for the 1S25 / 1M16 engine to do the Glasgow Central drag move if necessary, hence the paths across from Edinburgh to Glasgow.Edinburgh I'm less clear about. Loco 2 arrives with the Highland sleeper. There is a shunt schedule into a siding but there are also 0D24 and 5D24 paths to Polmadie. 5D24 ran this morning with two carriages. In the opposite direction there is a 0C16 from Glasgow and a shunt in Edinburgh.
During the day, that would be the loco off the down Highland sleeper which is stabled before working the following night's up Highland sleeper.Just to add to the request for confirmation/clarification: there frequently seems to be a 92 in CS colours stabled on the non-platform road opposite platform 7 at Waverley. Not sure how often that happens or how it fits in to what you've described.
Maybe platform lengths might get in the way!If they used 4 DVT type vehicles, one on the south end of each full 8 coach set, they would need 2 fewer 92s and could transport 4 extra coachloads of passengers each night, is that right?
LowlanderDuring the day, that would be the loco off the down Highland sleeper which is stabled before working the following night's up Highland sleeper.
Yeah, basically with DVTs you’d need fewer 92s and could slot in more passenger coaches.If they used 4 DVT type vehicles, one on the south end of each full 8 coach set, they would need 2 fewer 92s and could transport 4 extra coachloads of passengers each night, is that right?
No, the loco stabled at Edinburgh is off the Highland sleeper, unless workings have changed. The loco off the Edinburgh portion of the Lowlander used to run round the stock and take it ECS to Polmadie.Lowlander
No, the loco stabled at Edinburgh is off the Highland sleeper, unless workings have changed. The loco off the Edinburgh portion of the Lowlander used to run round the stock and take it ECS .
Possibly. The platform limitations are mainly at the termini, (Glasgow central, Inverness, Fort William and Euston) as distinct from through stations like Waverley. If a Driving trailer is replacing a class 92, it wouldn't affect the length of the train in the terminus. But at Inverness and Fort William the train is reversed in/out of the platform, with no loco at the front of the shunt to/from the sidings, so the DVT would be an extra vehicle to fit in the platform. A while since I've been to FW, but a 66+73 combo+8 sleepers take up most of the length of the platfom at Inverness.Maybe platform lengths might get in the way!
The 92 arrives in Edinburgh from Euston with all three sets, and spends the day there if I have understood 43096, returning to Euston the following night with the same setThe 92?
You mean the 92 comes from either Inverness Aberdeen or Fort William sets?
I had Carstairs station on the wrong leg of the triangle in my mind. So, the DVT would have to go on the north end of the 16 coach rake.Possibly. The platform limitations are mainly at the termini, (Glasgow central, Inverness, Fort William and Euston) as distinct from through stations like Waverley. If a Driving trailer is replacing a class 92, it wouldn't affect the length of the train in the terminus. But at Inverness and Fort William the train is reversed in/out of the platform, with no loco at the front of the shunt to/from the sidings, so the DVT would be an extra vehicle to fit in the platform. A while since I've been to FW, but a 66+73 combo+8 sleepers take up most of the length of the platfom at Inverness.
The main constraint would be at Euston, where two locos plus 16 sleepers only just fit. If you add a driving trailer to both rakes (as you would have to, since the rakes are rotated, and in any case it is the leading set that goes to Glasgow so you need a driving trailer at theb rear of the front set) that's 18 sleepers plus one loco - ie one vehicle longer.
And unless you are going to operate in push-pull formation in passenger service, you will need a driving trailer at each end of each rake, to allow ECS working at both Glasgow and Euston.
By the way, it wouldn't be a DVT if it was carrying apssengers, as the V stands for van. Maybe a DBSLE? Or a DBSO if its the seated coach?
By the way, it wouldn't be a DVT if it was carrying apssengers, as the V stands for van. Maybe a DBSLE? Or a DBSO if its the seated coach?
In my post I wrote 1 DVT per 8 coach set, but I meant each 16 coach set. So at Euston it would simply sit at the buffers where one of the 92s currently sits.
Where I suspect the bigger stumbling block is, however, is the economics of it. Would another 6 or so rooms cover the cost? As there isnt much other work for 92s, I suspect they're not on an especially expensive lease either. So I can't imagine there is much incentive to replace them.
I believe that with the Mk5's, the Glasgow and the Aberdeen/Fort William share the same sets, and the Edinburgh and the Inverness portions share the same sets. The Glasgow portion is advertised as having 2 accessible coaches, which would be required for the Aberdeen/Fort William portion.So hypothetically with a purpose built vehicle you could add a coach that is some form of driving trailer but my word would that be making things complicated, especially if you wanted to sell the seats. This is because the stock is rotated each night. Ie: what goes Edinburgh one night goes to Glasgow next time, what goes to Inverness then goes to Aberdeen/Fort William. If it were one DT per 16 coaches, you'd have essentially two formations coupled, one 8 car and one 9 car, rather than the current universal 8 car formations. Its not insurmountable operationally, but would add a new challenge.
Thanks for this excellent summary, and also thanks for all the other replies.Usually the Highlander is worked by the 92 that stables in the Edinburgh Waverley Klondike Siding (opposite platform 7), whilst what will become "loco 4" runs light after dragging the southbound Glasgow portion into Glasgow Central to Waverley - and reverse in the morning (to become loco 4). Though this doesn't always happen.
Yes, ECS can run in the early hours between Waverley and Polmadie. Typically this is used when the Fort William seated and club cars need to head across to Polmadie for maintenance.
The Edinburgh portion 92 is planned to stable overnight in Carstairs.
So on a typical night, starting with your numbering scheme:
As above, some nights when there is no ECS move between Edinburgh & Polmadie, loco 4 evening duties are covered by loco 7 and the morning by loco 2
- Wembley -> Euston (Highlander ECS), Euston -> Glasgow, Glasgow -> Polmadie (ECS, on rear)
- Wembley -> Euston (Highlander ECS, on rear), Euston -> Edinburgh (Highlander), -> Klondike Siding
- Wembley -> Euston (Lowlander ECS) evening, Euston -> Wembley (Lowlander ECS) morning
- Polmadie -> Glasgow (ECS), Glasgow -> Edinburgh (light). Take ECS to Polmadie if required. Reverse in morning
- Polmadie -> Edinburgh (Lowlander ECS), run round, Edinburgh -> Carstairs. Reverse in morning
- Reverse of Loco 1
- Reverse of Loco 2
In the past they were maintained at Inverness so yes, every 8 coach set had to end up on an Inverness run regularly. As they are now maintained at Polmadie, they only need to ensure each 8 coach set swaps between the highlander and the lowlander regularly, as both the Edinburgh and Glasgow portions go to Polmadie during the day. I believe they achieve this by having an arriving highlander at Wembley form a lowlander that evening, and vice versa.I think the mk3s were rotated around to make sure each set went to Inverness at some point, because that's where they were maintained, is that right?
Is that now replaced with a need to pass through polmadie at some point?
As they did in Mark 3 days. The the Highlander ended up in reverse formation (Inverness at the London end going north, Scotland end going south, if I recall correctly) The Edinburgh portion was at the rear in both directions, but the sets were swapped at Polmadie during the day (giving more time for servicing, as each set only had to make the ECS move once) so what had been the Edinburgh portion (at the London end) northbound became the Glasgow portion (also at the Londion end) southbound the next night.I believe they achieve this by having an arriving highlander at Wembley form a lowlander that evening, and vice versa.
Location of lineside fire - Banavie.Southbound Fort William portion not left tonight. Lineside fire I'm told.
The sleeper website is silent on the matter. Have they contacted you directly?Southbound Fort William portion not left tonight. Lineside fire I'm told.
Wonder what will happen with the Northbound tomorrow. I'm meant to be on it!
Aaaargh.
If normal stock rotation is kept, it would mean the northbound Glasgow will be two sleepers short, but if the FW happens they'll also have to get the seating and club cars down from FW to Edinburgh in time to meet it.Southbound Fort William portion not left tonight. Lineside fire I'm told.
Wonder what will happen with the Northbound tomorrow. I'm meant to be on it!
Aaaargh.
They usually give updates at about 2pmThe sleeper website is silent on the matter. Have they contacted you directly?
The Fort William portion has four sleepers at the moment. During the winter months more go to Aberdeen and fewer to Fort William. The southbound from Fort William didn't run last night. The line was already closed. So it's safe to assume that the locos and stock never moved. The 0548 from Queen Street was still showing delayed on the screens at 0730 this morning but RTT says cancelled.If normal stock rotation is kept, it would mean the northbound Glasgow will be two sleepers short, but if the FW happens they'll also have to get the seating and club cars down from FW to Edinburgh in time to meet it.
RTT says the northbound FW didn't happen last night either, presumably because there was no club car avaialble at Edinburgh, but I don't know where the FW sleeper coaches ended up. RTT says the full 16 cars left Euston, and I can't see any extra ECS movements.
== Doublepost prevention - post automatically merged: ==
They usually give updates at about 2pm
My guess is that they are in Aberdeen. I expect that four sleepers will use the 5D24 path tomorrow morning from Edinburgh to Polmadie which will get everything back in the right place.CS website now showing only 2 sleepers instead of 6 to Glasgow tonight - presumably the missing four are the ones that never left FW last night. I guess they will form the southbound FW portion tonight instead. The lounge and seating cars will be needed in edinburgh anyway, to meet the northbound portion.
It is also not obvious where the ones that were supposed to go to FW last night ended up. They are presumably not still in London, because if they were they could have been used to make up the numbers on the Glasgow train