I’m still none the wiser what the ‘big announcement” was about. I tweeted Caledonian Sleeper but they haven’t replied.
No, you're not the only one.Am I the only one who finds that (unless to massive excess, which is more passing out than sleeping) alcohol makes me less likely to sleep?
In order to get into Euston after coming off the ECML it has to reverse in Wembley Yard - I'm not quite sure what exactly you want explained?
Unfortunately not accessible from the north without a double shunt via Harringay / Ferme ParkAlternatively, there'd be a route by using the N-W curve just south of Harringay to leave the ECML, on to the Goblin [Barking to Gospel Oak line], continuing on the NLL after Gospel Oak to pick up the WCML at Willseden Junction, and then into Wembley to reverse as before.


If you're querying whjy it can't go to Kings Cross, it's because there is no platform there long enough for it. And after Doncaster there is no route from the ECML to Euston that doesn't require a reversal. (Doncaster - Sheffield - Bedford - Bletchley is of course impractical for a Class 92 as the only wired sections are between Bedford and Kettering, and a short stretch thriough Rotherham (the latter at the wrong voltage)On April 03rd the INV-EUS service is timetabled to arrive in Euston at 09:05. The service is using the ECML and appears to reverse in Wembley Yard. Not being overly familiar with the CS operation, can someone explain this move?
Surely it would fit in StP HS1 platforms (ECML-CTRL link in and silo curve out to NLL) but I bet the access charges would be phenomenal.If you're querying whjy it can't go to Kings Cross, it's because there is no platform there long enough for it. And after Doncaster there is no route from the ECML to Euston that doesn't require a reversal. (Doncaster - Sheffield - Bedford - Bletchley is of course impractical for a Class 92 as the only wired sections are between Bedford and Kettering, and a short stretch thriough Rotherham (the latter at the wrong voltage)
You'd also be mixing up passengers who did and didn't need to go through passport/customs/security etc.Surely it would fit in StP HS1 platforms (ECML-CTRL link in and silo curve out to NLL) but I bet the access charges would be phenomenal.
You'd also be mixing up passengers who did and didn't need to go through passport/customs/security etc.
Could the Sleeper not just get shortened if running to KGX as a diversion?
The biggest issue is that whilst the ECML/HS1 link is physically present the signalling has not been commissioned. You'd also still need to get the stock from St Pancras to Wembley for servicing.When does the last E* of the day depart? Arrivals can be worked around, security isn't the same issue, and domestic and international passengers already mix in UK airport departure lounges. It's worked around by taking a photo of the domestic passengers as they enter so a sneaky boarding pass swap can be avoided.
The Silo Curve back to the North London Line could be used to get to Wembley. Is it commissioned?The biggest issue is that whilst the ECML/HS1 link is physically present the signalling has not been commissioned. You'd also still need to get the stock from St Pancras to Wembley for servicing.
New advertising campaign.I’m still none the wiser what the ‘big announcement” was about. I tweeted Caledonian Sleeper but they haven’t replied.
New advertising campaign.
As far as I know, no. However I don't have 100% confirmationThe Silo Curve back to the North London Line could be used to get to Wembley. Is it commissioned?
Is it passenger centred to spend £millions on links that will be used less than a dozen times a year? You'd also need to manage any security issues at St Pancras - the area is still considered 'airside' and although it isn't anything that hasn't been sorted somewhere else it's still a problem that a temporary solution would be disproportionately costly to implement. It's also politically probably not advisable to do anything that would make Scottish passengers feel like they are arriving in a different sovereign territory.I'm sure it won't happen soon but a passenger-centred railway would do it for arrivals instead of taking an hour long detour and reverse. Departure less of a need.
But international passengers at St. Pancras have passed through French immigration at St Pancras. There are no UK airports that do that, so mixing domestic and international passengers at St. Pancras would not be acceptable.When does the last E* of the day depart? Arrivals can be worked around, security isn't the same issue, and domestic and international passengers already mix in UK airport departure lounges. It's worked around by taking a photo of the domestic passengers as they enter so a sneaky boarding pass swap can be avoided.
But international passengers at St. Pancras have passed through French immigration at St Pancras. There are no UK airports that do that, so mixing domestic and international passengers at St. Pancras would not be acceptable.
I don't think there are any protocols on as to how train protection works for a train controlled by AWS./TPWS approaching a stationcontrolled by KVB (St Pancras HS). Ashford P3/4 has both systems overlaid so I suspect you'd have to partially resignal St Pancras to include AWS/TPWS for passenger use. I believe one of the freight companies has a special clause in their safety case to allow them to work engineering trains over the link.The biggest issue is that whilst the ECML/HS1 link is physically present the signalling has not been commissioned. You'd also still need to get the stock from St Pancras to Wembley for servicing.
I think the problem would be that all air passengers (international or domestic) have to have suitable id to travel. That is not a prerequisite of train travel. So for the sleeper to be the equivalent of airside the passengers would need to be carrying their passport or equivalent id.Departing ones have. Which is why I asked when the last departure was - I believe it's quite early - well before even the Highlander would be boarding.
Arriving passengers are not the same issue, the airport workaround would work for them.
It's also politically probably not advisable to do anything that would make Scottish passengers feel like they are arriving in a different sovereign territory.
I think the problem would be that all air passengers (international or domestic) have to have suitable id to travel. That is not a prerequisite of train travel. So for the sleeper to be the equivalent of airside the passengers would need to be carrying their passport or equivalent id.
They already cordon bits off to keep arriving and departing passengers apart. It would be possible to keep sleeper passengers apart, especially if they arrived before the first international arrival at 0830. With a few fences, you could channel them straight off the buffer end through the big glass doors. It won't happen for lots of other reasons including the signalling commissioning and track ownership.I think the problem would be that all air passengers (international or domestic) have to have suitable id to travel. That is not a prerequisite of train travel. So for the sleeper to be the equivalent of airside the passengers would need to be carrying their passport or equivalent id.
Officially, you don’t need any ID to travel on a domestic flight, you can call yourself Mickey Mouse if you want to,Nope. At terminals that deal with domestic and international pax together, it is done by taking a photo of domestic passengers as they pass security showing a domestic boarding card. ID has no relevance to it.
Unfortunately not accessible from the north without a double shunt via Harringay / Ferme Park
The signalling to do so doesn't exist. There's also no crossovers to do a move like that anywhere near London. The nearest facing points from the the up to down fast are at Hitchin.Unless, presumably, it switched to the Down lines on the way into London...
The solution there would be to install TPWS, which given its all colour light signing wouldn't be the end of the world.I don't think there are any protocols on as to how train protection works for a train controlled by AWS./TPWS approaching a stationcontrolled by KVB (St Pancras HS). Ashford P3/4 has both systems overlaid so I suspect you'd have to partially resignal St Pancras to include AWS/TPWS for passenger use. I believe one of the freight companies has a special clause in their safety case to allow them to work engineering trains over the link.
Stopping at Finsbury Parl would be a nightmare as the train would only have half about half its doors on the platform. It'd also block the junctions behind it so trains would need to be routed around it from Alexandra Palace, restricting capacity. Given that much of the train would want to get the early arrival I cam see the train needing to stand for a while to let everybody off.If the target was to allow passengers to get off the train earlier, rather than having to wait for the detour via Wembley, during east coast diversions, wouldn't the most straightforward solution be just to have a brief stop at somewhere like Finsbury Park, with a bit of selective door opening? Maybe it would just cause chaos with people trying to get themselves and their bags down the narrow coridors to the relevant carriage.
You need a nigh on 400m platform for a full length train, so York more than likely.I wonder where's the closest station to London on the ECML that can accommodate the entire train on a platform? Somewhere miles away?