Highlander stuck behind the broken Lowlander. Couldn't make this up could ya! The mk5's were clearly not ready for service, I wonder if TPE are having similar issues with their stock or if it's unique to the sleepers? Someone has dropped the ball, CAF, CS, TfS or a combination of them all.
There are 10 mk3's and 2 mk2's currently sat at Wembley. I wonder if they can be brought into action while these issues are properly sorted.
On the plus side the 92's seem to be behaving themselves recently after the fleet wide servicing they've had.
The more worrying thing thing will be when are the heavy exams due on the stock that is still running?
As was mentioned earlier the stock that has already been scrapped was canned to remove the need for a huge bill for heavy maintenance/exams. The more and more the Highlander gets pushed back the nearer we get to the exam being due on that stock.
Re the TPE stock I suppose it will depend on what it is that's causing all the problems. If its technology or systems that will be exclusive to the sleeper stock thats causing all the problems they will probably be breathing a sigh of relief but if its something generic I'd imagine they will be pushing CAF for a fix as much as CS are
Do they guarantee the connection with the Jacobite or are you having to claim consequential losses?Northbound Highlander will be about 45 late into Fort William so missed the Jacobite (again).
The CS delay repay team will be busy.
Agreed no way they should launch the MkVs on the Highlander in 2 weeks time. Unless of course their political masters say otherwise!
Currently sat in Crewe having been terminated.
Looks like they need to get some more of the mk5s in service so this week's "problem" set can get some proper attention rather than a rush job for the nth time.
Yes - As I understand it (minus one coach? still out)Am I right in thinking it's the same set that failed last week?
Am I right in thinking it's the same set that failed last week?
The only other acceptable arrangement would be if they are somehow paying TS some sort of compensation in return for not providing a proper service as per their contract with them. I've not heard any word that anything like this is happening - or is it?
Surely they won't introduced the mark 5s on the highlander next month now. Don't like the new stock.
Will that include penalties for things like the seats being out of order, lounge not able to do hot food, etc?Every train operator that is contracted to run a service (ie all franchises and concessions, but not Open Aceess) will have in their contract penalties to be paid to the service specified in the event that the service doesn’t run as planned. These will be for delays and cancellations; usually for those within the control of the TOC, but some contracts pick up all delays / cancellations. The specifics of each contract will be different of course. But be assured that TS will be receiving payment for each occasion that the sleeper is late or cancelled because of a Serco issue.
You won’t hear about it as it is commercially confidential, and also not in Transport Scotland’s interests to speak about it.
Will that include penalties for things like the seats being out of order, lounge not able to do hot food, etc?
Good luck finding something that says 'West Midlands' on it at Acton Bridge, it's only LNW there.
Should have terminated at Warrington
LNW Which is operated by...?Good luck finding something that says 'West Midlands' on it at Acton Bridge, it's only LNW there.
Should have terminated at Warrington
LNW Which is operated by...?
Actually, yeah, the writing on the side of the train is pretty huge.is the 'operated by...' in great big letters all over the train, or in the platform displays, or mentioned in the announcements?
CS is continuously audited on that sort of stuff by Transport Scotland's SQUIRE regime.Will that include penalties for things like the seats being out of order, lounge not able to do hot food, etc?
Would you be happy to book the CS at this stage?
Frankly, at £230 a berth, which is all that's left for that trip, not a chance.I might possibly need to make a near last minute trip to Glasgow. The lowlander from Glasgow on Sunday 7th July would be ideal in terms of timetable for my return to London and CS would be my preferred mode of travel if everything was working fine, despite it probably being more expensive than a Glasgow hotel and early morning flight (haven't checked).
But reading about the problems and the delays, means I am not sure about booking. I am happy to accept some delay and get delay repay, but would prefer not to have to change to a replacement bus or wait at Acton Bridge etc. Would you be happy to book the CS at this stage?