adrock1976
Established Member
Not sure if best posted in here or on the Mk V stock in the Traction & Rolling Stock section as there is a bit of an overlap.
From what I have gathered over the last week or so, we seem to have:
1) platform staff at Euston keeping passengers in the dark
2) showers that do not drain the water properly
3) the emergency brakes are maybe too soon to apply and too hard when they are activated, causing wheel flats
4) passengers being asked to share even though Serco have done away with that
But most of all, the thing that really astonishes me is:
5) the onboard train computer unable to do basic arithmetic when coupling/uncoupling coaches.
Who exactly signed the Mk Vs off for normal passenger service? I totally despair as how the country has ended up in the terrible state it is in nowadays with even the basics cannot be got right first time.
From what I have gathered over the last week or so, we seem to have:
1) platform staff at Euston keeping passengers in the dark
2) showers that do not drain the water properly
3) the emergency brakes are maybe too soon to apply and too hard when they are activated, causing wheel flats
4) passengers being asked to share even though Serco have done away with that
But most of all, the thing that really astonishes me is:
5) the onboard train computer unable to do basic arithmetic when coupling/uncoupling coaches.
Who exactly signed the Mk Vs off for normal passenger service? I totally despair as how the country has ended up in the terrible state it is in nowadays with even the basics cannot be got right first time.
