Highlandspring
Established Member
- Joined
- 14 Oct 2017
- Messages
- 2,777
It was the northbound Lowlander that had the problem this morning so there will be a set in London...5S96 hasn’t left Wembley yet (is there actually any stock to move?)
It was the northbound Lowlander that had the problem this morning so there will be a set in London...5S96 hasn’t left Wembley yet (is there actually any stock to move?)
So the head of Serco has to address wheel flats as well now?Have you been reading the last few pages of this thread? If you do it should answer your questions.
So the head of Serco has to address wheel flats as well now?
So the head of Serco has to address wheel flats as well now?
I think I might revise this to Christmas, or something.
It seems (to me anyway) that the Mk5s need a lot more testing, and a lot more problems ironing out, before they’re introduced on the Highlander. If I were CS I would be very wary of there being a repeat of this, particularly on the Highlander, for which the consequences of a cancellation in the middle of the night are even more serious (given the increased distances). I am myself a little sceptical about the introduction date in early July; early autumn might be the better bet, and would certainly be more achievable in the present situation. This incident is definitely something which CS can learn from; I wonder what caused the emergency brake application in the first place?
Though they will also have to do something about the Lowlander, as that one is the major carrier of all-year business traffic, isn't it? Lose that to air and it'll be hard to get it back.
Have those Mk3s gone under the torch yet? Might be time to get them back...
I did wonder in current circumstances whether the Highlander could convey Euston passengers from its coupling point at Edinburgh if it had to- surely a train running with a 2 hour delay to Euston is better than a coach or nothing at all?
I am myself a little sceptical about the introduction date in early July; early autumn might be the better bet, and would certainly be more achievable in the present situation. This incident is definitely something which CS can learn from; I wonder what caused the emergency brake application in the first place?
indeed - point well made.He is the one accountable to the Scottish Government for provision of the service, including managing the contract with CAF which seems to have gone badly wrong (just like most of the current generation of new stock!)
Yes - but the ETD is at capacity currently and couldn’t fit them in. Hence off to Longsight.Isn't there a wheel lathe at Crewe Eletric ?
I'm sure i saw one on an open day years ago.
It will be interesting to see how the Sleepers perform tonight...
not sure about what’s happened to the Mk3s displaced from the Lowlander after April?
Was there a reason why some new Caledonian Sleeper Coaches were at Crewe yesterday? Are these new ones that haven't seen service yet or have they been sent to Crewe for another reason? I saw them last night at about 19:00 as I was entering Crewe Station on a EMT 158 that was on Derby-Crewe service
Would it make any difference? given todays railway’s complex myriad of suppliers & contractual relationships usually make it relatively straightforward for them to hide behind in these type of situationsI wonder if the head of Serco has been summoned to the offices of Transport Scotland for a severe knuckle rapping!
The Mk3s are still at Wembley/Polmadie. Six of the Mk2s have been moved to the Weardale Railway (as Eastern Rail Services bought some of them last year and leased back to Serco and other's are being stored there).There looks to be a full (or near full) set still at Wembley. I'll get a better look tomorrow as I'll walk through the depot to work.
Having been in similar scenarios the "customer" (Transport Scotland) will most certainly be holding Serco's feet to the fire on this and any response of "it was CAF's fault" or "it was XYZ's sub-contractor's fault" would get very short shrift. If any such response/excuse was offered up, the customer/client would quickly point out they are Serco's sub-contractors to select/manage and it's Serco's responsibility to deliver the service to TS / the passengers.Would it make any difference? given todays railway’s myriad of different suppliers & contractual relationships make it pretty straightforward for them to hide behind in these type of situations
The Mk3s are still at Wembley/Polmadie. Six of the Mk2s have been moved to the Weardale Railway (as Eastern Rail Services bought some of them last year and leased back to Serco and other's are being stored there).
Of note all 92s bar 044 (awaiting Exam) and 032 (at the tunnel) are now configured for Mk5 1500V ETS and there's currently only 2x Skoda's on-hire for the Lowlander (plus 87002 available at Wembley for ECS shunts). So something would need to be done around loco provision as well as digging out the musty stock and replacing any bits on them that have been 'borrowed' over the past few weeks to keep the active fleet going.
Fair Enough.Yes - but the ETD is at capacity currently and couldn’t fit them in. Hence off to Longsight.
One thing this incident has confirmed is there’s one thing on the Mk5s that are very effective - the brakes!
I wonder if they’ll run a short former set on the Lowlander if some coaches are ok. Maybe only to Edinburgh. Or are some of the other new ones ok to use.
One would presume that any new Mk5's not already used in revenue earning service but cleared to be used would need to have modifications /fixes carried out as per the ones already in use.I wonder if they’ll run a short former set on the Lowlander if some coaches are ok. Maybe only to Edinburgh. Or are some of the other new ones ok to use.
I did wonder if they should perhaps consider doing that. Or even making changes to the Highlander to free up a half-set - perhaps run Aberdeen via Inverness, or Inverness via Aberdeen, instead of the present split? (The FW short set is perhaps less useful, though a "day" Mk2 BSO could be hired to be used on that to free up a proper Sleeper one as it has been in the past)
Absolutely no chance. That would cause more harm than good.
Is this a chunk of the Sleeper going back to London from Crewe? http://www.realtimetrains.co.uk/train/O13300/2019/06/12/advanced